Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Summersville Raw Water Intake
By Douglas Banks
Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake
Jan 1, 2005
-
Longwall Mining, Shale Gas Production, and Underground Miner Safety and Health
This paper presents the results of a unique study conducted by the National Institute for Occupational Safety and Health (NIOSH) from 2016 to 2019 to evaluate the effects of longwall-induced subsurfac
Jan 7, 2020
-
Foreign coal is a threat, but US producers are finding ways to compete
By Steve Kral
Competition from foreign coal producers could displace as much as 9 Mt/a (10 million stpy) of US coal bound for power plants located near waterways. But, according to a Maryland-based coal consultant,
Jan 1, 1986
-
Cost Estimating Standards For International Reporting Of Ore Reserves: What Are They? What Should They Be?
By O. Schumacher
Guidelines for publication of information defining the amount and grade of resource material available in a deposit are well established in Australasia?s JORC Guidelines, Canada?s National Instrument
Feb 27, 2013
-
Beneficiation Of Terrestrial Resources For The Production Of Lunar Simulant Separates
NASA has received direction for lunar habitation beginning in 2024. Prior to then, it will be necessary to learn about how lunar soil can be used to promote civilization on the moon. Questions must
Jan 1, 2012
-
Leaching of Trace Amounts of Metals from Flotation Tailings in Cupric Chloride Solutions Mining, Metallurgy and Exploration
By Pelin Altinkaya, Maria Leikola, Jussi Liipo, Mika Haapalainen, Mari Lundström, Eero Kolehmainen
With decreasing ore grades, the tailings of mining operations are becoming of increasing interest as metal-containing secondary raw materials. The objective of the current work was to investigate chlo
-
Australian Mineral Sands Operations 1982 ? Introduction
By V. J. McSweeney
This paper is directed at interested parties outside the Beach Sand Industry : the scope is quite broad. The geomorphology described is a successful working hypothesis which guided the author during p
Jan 1, 1982
-
Eskay Creek Mine and Mill – A Continuing Success
By Garry Biles
The Eskay Creek Mine is a high-grade gold and silver underground mine in northwestern British Columbia. The mine started operations in late1994. For the first three years, ore was crushed to -50 mm(-
Jan 1, 2000
-
Design And Start Up Of The Cortez Gold Mines Pipeline Mill
By R. N. Powell
The Pipeline ore body was discovered in March 1991. The construction of the new mine and mill did not start until early March of 1996. Upon completion of permitting and corporate project approval, the
Jan 1, 1999
-
Inductive Electrostatic Gradiometry (IESG) Deciphers Keweenawan Copper Plumbing System
By J. Trow
Dowsing is really IESG which inductively locates electric gradients (dv/dx) on the flanks of SP anomalies. "Sensors" are in one?s head. The "meter" consists of one?s body, limbs, and two $.69 welding
Jan 1, 1992
-
The Coronado Traffic Diversion Tunnel
By Jon Y. Kaneshiro, Ed Walton, Stephen J. Navin, Robert M. Sergeant, Storer J. Boone
The Coronado Traffic Tunnel is a proposed two-lane, reversible, road tunnel, which will relieve severe peak hour congestion problems on surface streets. The tunnel will take traffic from the Coronado
Jan 1, 2001
-
Closing the Historic Alaska-Juneau Mine
By Joseph L. Petrillo
In July 1997, Kvaerner Environmental signed a unique contract with Echo Bay Alaska called the Transfer Risk and Accelerate Closure (TRAC). The contract called for Kvaerner to assume the responsibilit
Jan 1, 1999
-
Los Angeles Tunnels Are Expanded With Help Of TBM Monitoring System
During the last 20 years, more than 80 km (50 miles) of tunnels have been constructed in the Los Angeles, CA area. Recent projects include The East Central Interceptor Sewer (ECIS), completed in 2004
Jan 1, 2008
-
Reducing Emissions Through The Use Of A Fuel Borne Combustion Catalyst
By R. Curtis
To achieve compliance with 2015 EPA Tier 4 Final regulations, which permit only around 10% of Tier 3 particulate matter (PM) and NOx emissions, a number of technologies are being implemented. Use of a
Feb 27, 2013
-
Planning and Design of the A3 Hindhead Tunnel, Surrey, United Kingdom
By Tom Ireland, Tony Rock
The proposed 1.83km long twin bore A3 Hindhead road tunnel planned for contruction in 2008 is being delivered under a Highways Agency Early Contractor Involvement (ECI) contract. The proposed cons
Jan 1, 2007
-
Current State Of Disc Cutter Design And Development Directions
By Joe Roby
Rolling disc cutters are the business end of hard-rock and mixed-face tunnel boring machines (TBMs). Since their first successful employment on a TBM more than 50 years ago, disc cutter technology ha
Jan 1, 2009
-
An Evaluation Of The Risks Of Lung Cancer And Mesothelioma From Exposure To Amphibole Cleavage Fragments
By John F. Gamble
Amphiboles are hydrated mineral silicates five of which occur in asbestiform habits as asbestos grunerite (amosite) asbestos, riebeckite (crocidolite) asbestos, anthophyllite asbestos, tremolite asbes
Jan 1, 2007
-
Analysis of Fall-Related Imminent Danger Orders in the Metal/Nonmetal Mining Sector Mining, Metallurgy and Exploration
By Mahiyar Nasarwanji, Jonathan K. Hrica, Jonisha P. Pollard, Lydia M. Kocher, Brianna M. Eiter
Within the metal/nonmetal mining sector, fall-related incidents account for a large proportion of fatal and non-fatal injuries. However, the events and contributing factors leading up to these inciden
-
Cold-Model Study on the Maximum Penetration Distance of the Injection Lance in a Kaldo Furnace Mining, Metallurgy and Exploration (ce6397bf-f438-41da-92c1-b98240259c35)
By Manuel Pérez-Tello, María M. Salazar-Campoy, Óscar Rodríguez-Hoyos
A common problem during the operation of the Kaldo furnace is the formation of accretions and blockage of the injection lance due to splashing. This typically occurs during the processing of anodic sl
-
Cold-Model Study on the Maximum Penetration Distance of the Injection Lance in a Kaldo Furnace Mining, Metallurgy and Exploration
By Manuel Pérez-Tello, María M. Salazar-Campoy, Óscar Rodríguez-Hoyos
A common problem during the operation of the Kaldo furnace is the formation of accretions and blockage of the injection lance due to splashing. This typically occurs during the processing of anodic sl