Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)
By Jeffrey M. Taylor, Arturo Ressi di Cervia
"Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con
Jan 1, 2004
-
Alameda Corridor-East: San Gabriel Trench Project
By David Peterson, Terry Tucker, Rafael Serrano
"The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin
Jan 1, 2017
-
Development Of Vertical-Horizontal Yield Envelopes Of Pile Group Supported Bridges Subjected To Scour
By Aditi Sharma, Sumanta Haldar
Scouring of soil is the major concern forthe various hydraulic structures built in the flowing rivers since scouring impacts the bearing capacity of foundations. Hence, consideration of scouring in th
Sep 1, 2022
-
Cooperative Effort Overcomes Problems With Pier And Cofferdam Construction Caused By Rock Slope
By Herbert F. ?Buck? Darling
A bridge replacement project in Rochester, NY, encountered difficulties when it was determined that rock below one pier was sloping downward toward the river at an angle of 42 degrees versus anticipat
Jan 1, 2013
-
Installation Of Augered Cast-In-Place Piles
By Michael Moran
Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:
Jan 1, 2005
-
Automated Pile Load Test Monitoring
By Joel L. Volterra
Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site
Jan 1, 2008
-
Optimization of Design of Drilled Shaft Foundations by Lateral Load Testing (94ee84ca-5eda-40d1-bba2-d7742a925002)
By Donald R. Clark
"Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re
Jan 1, 2017
-
Optimization Of Design Of Drilled Shaft Foundations By Lateral Load Testing
By Donald R. Clark
Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re
-
Virginia Route 340 Bridges: Challenges in Karst Terrain
By Chaz Weaver, James Sheahan, Michael Mo
"The Virginia Department of Transportation (VDOT) undertook a program to replace four bridges along approximately 4 mi (6.4 km) of US 340 in Northwest Virginia. Two of these bridges, which span Compto
Jan 1, 2017
-
Ground Improvement by Dry Concrete Columns
By Tatiana Tronda
"The territory of Belarus is characterized by nonhomogeneous ground conditions. In some cases soft ground layers can reach tens of meters in depth. Application of piles and other conventional foundati
Jan 1, 2016
-
Outline and Execution Control System of Dry Jet Mixing (DJM) Method
By Shigetoyo Yasui, Masahiro Saitou, Nobushige Yasuoka, Keisuke Tsujimoto
"The Dry Jet Mixing (DJM) Method was developed and has been put to practical use on the initiative of the Public Works Research Institute and Japan Construction Method and Machinery Research Institute
Jan 1, 2015
-
Change In Bearing Capacity Of Bored Steel H Piles Enclosed In Soil-Cement Columns With Overburden Pressure - Synopsis
By Tomio Tsuchiya
A construction method of bored steel H piles enclosed in soil-cement columns was developed by modifying steel H piles from the driven pile method and soil-cement walls from the earth retaining wall me
Jan 1, 1996
-
Evolution Of Helical Screw Pile Design And Installation
By Michael Perlow
Helical screw piles in use since 1838 are routinely used for energy, transportation, municipal, industrial, marine and coastal infrastructure as well as for excavation support, environmental remediati
Jan 1, 2011
-
Sonic Drilling and Sensitive Infrastructure
By George Burnhart
"Sonic drilling is a relatively new technology even though it has been in development since the late 1940s. It was initially funded by the U.S. petroleum industry and then, in the late 40s, Russian sc
Jan 1, 2008
-
Pile Inspector's Guide To Hammers ? Introduction
The pile inspector is a critical element in the quality control process necessary for a successful pile installation project. This guide is intended to provide the inspector with a basic understanding
Jan 1, 1995
-
Digital Automation Of Geotechnical Sites – The Development And Essential Role Of An Industry Standardised Design Format
By Scott White, Pishun Tantivangphaisal, Andrew Bell, Chris Barker
There has been considerable advancement in recent years in the tools, both software and hardware, available to allow efficient digitalization of site records during the construction of geotechnical wo
May 1, 2022
-
Pindersfield Hospital ? An Innovative Piled Scheme
By James N. Mure
The paper describes the design development and construction of bored piles at Pindersfield Hospital, Wakefield, U.K. The piles were of monopile type. Monopile is the term used to describe piles which
Jan 1, 2008
-
The Value Of Field Measurement In The Design And Construction Of Deep Foundations ? Synopsis
By J. P. Burland
The paper describes a number of recent case histories in the United Kingdom where field instrumentation and measurements have played a major role in the design and construction of excavations, piles a
Jan 1, 2010
-
Design, Construction, And Testing Of A Precast UHPC Pile
By Thomas L. Vande Voort
The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural systems of bridges in the United States as two grand challenges in br
Jan 1, 2008
-
Seepage Cut-Off Wall Installation Using Cutter Soil Mixing for Herbert Hoover Dike Rehabilitation
By Michael Arnold
"BAUER Foundation Corp. was one of three contractors awarded with the installation of a cut-off wall at the Herbert Hoover Dike Rehabilitation project. The cut-off wall was constructed up to 84 feet d