Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Design And Testing Of Deep Foundations For Wind Turbines In Western Alaska

    By Lorie M. Dilley

    Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alaska villages, has made a concerted effort to install wind turbines in the villages they serve in an

    Jan 1, 2010

  • DFI
    Challenges and Lessons Learned from Shoring Design of 2nd / Broadway Metro Station

    By Babak Mamaqani, Pirooz Barar

    Regional Connector Transit Corridor (RCC) is part of the Los Angeles metro expansion project under construction which adds three new stations into the system. PB&A was responsible for the design of th

    Jan 1, 2019

  • DFI
    High Capacity Drilled Displacement Piles As An Alternative To Conventional Driven Methods

    By Pete Howell, Patrick Granitzki, Alicia Plinio, Janitha Batagoda

    The New York City Housing Authority (NYCHA) Red Hook Houses was subjected to damage during Superstorm Sandy. As a result, the NYCHA has an ongoing project known as Restoration Associated with Sandy Re

    Oct 1, 2022

  • DFI
    Case History: Large Diameter Micropiles for the Highway 53 Relocation Project

    By Nathan W. Iverson, David S. Graham, Paul J. Axtell

    "The Highway 53 relocation project in Virginia, Minnesota, involves construction of a very tall bridge across a currently inactive iron ore mine pit. The inactive pit is partially flooded and serves a

    Jan 1, 2017

  • DFI
    Deep Mixing Core Data from LPV 111

    By Donald Bruce, Alex Reeb, George Filz, Wesley Schmutzler, Mitsuo Nozu

    "One million seven-hundred thousand cubic yards of deep mixing were installed to support an elevation raise of an earthen levee known as LPV 111, which is located in east New Orleans. The deep mixing

    Jan 1, 2015

  • DFI
    Concrete Piles Driven In A Coral Sand

    By L. D. Johnson

    12 groups of 12 precast prestressed (PCPS) piles were driven in the lagoon of Kwajalein Island to support a dry dock. Pre-construction investigation of the calcareous coral sands and static pile loeid

    Jan 1, 1993

  • DFI
    Ground Improvement for New Jersey Turnpike Interchange 14A: A Case Study

    By Sarah Ramp, Daniel V. Cacciola, Justin Labrozzi, Shafiq I. Siddiqui, Faisal Ahmed

    "Construction of embankments up to 34 ft in height for twelve ramps and roadways needed for the New Jersey Turnpike Interchange 14A project required ground improvement. The subsurface conditions, cons

    Jan 1, 2017

  • DFI
    Controlling Thermal Stresses in Barrier Walls

    By Karsten Beckhaus

    Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee

    Sep 8, 2021

  • DFI
    Metro Rome Line “C” - Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni - Line “A”

    By Giulia M. B., Ferruccio Cribari, Alessandro Bertero, Eliano Romani, Roberto Sorge, Francesca Casini

    "The use of Artificial Ground Freezing (AGF) to form earth support and seepage control barrier systems has had applications worldwide. These cover a variety of construction problems, including the for

    Jan 1, 2016

  • DFI
    Centrifuge Modeling Of Axial Failure Of Helical Piles In Cohesive Soils

    By Richard Schmidt, Lijun Deng, Mohamed Abdelaziz, Weidong Li

    Helical piles are widely used as a foundation supporting a variety of different structures. Understanding the axial behaviour of helical piles is required to confirm the engineering design. Helical pi

  • DFI
    PPP Contract Delivery System- Contractual Risks and Ethical Issues Regarding Deep Foundation Subcontractors

    By Alexander Filotti, Richard Kalson

    "1. INTRODUCTION- WHAT IS P3 OR PPP ?The Public Private Partnership (PPP or 3P) is a project delivery scheme based on the government providing land and/or a concession agreement, and on a private enti

    Jan 1, 2017

  • DFI
    Driven Pipe Pile Solutions for the Temporary Foundations at the New San Francisco-Oakland Bay Bridge

    By Manuel M. Reyes, Thuraisamy Thavaraj, Alex Sy

    "The new east span of the San Francisco-Oakland Bridge features a single tower self-anchored suspension (SAS) bridge. During construction of the SAS bridge, a temporary bridge was used to support the

    Jan 1, 2015

  • DFI
    Baum Station – A New Pile Driving and Drilling Navigation System

    By Dzianis Proshchanka, Yoshi Izumi, Koji Mitani, Ayuna Kitaura

    "A new pile driving and drilling navigation system has been developed. It utilizes the commonly used surveying total station, combined with an innovative reticle. Conventional crosshairs have been rep

    Jan 1, 2017

  • DFI
    Session 10 Deep Mixing Method I

    By Peter Cali

    There is one organization in Sweden, The Swedish Deep Stabilization Research Centre, which has been working with these questions and there is also a project, Eurosoilstab, within European Union to tak

    Feb 10, 2003

  • DFI
    p-y Curves For Analyzing Micropiles in Sandy Soils Using Lateral Load Test Data

    By Mahdi Soudkhah, Akhter Hossain

    Vertical micropiles are generally considered to be low in lateral resistance. Therefore, battered micropiles are often used when additional lateral load carrying capacity is required. However, batteri

    Jan 1, 2019

  • DFI
    Slurry Wall Design for Construction Using Soil Structure Interaction

    By Nino Catalano, Meeok Kim, Gordon Chen

    "The design of the below grade structure of Brigham Building for the Future (BBF) included three different areas to provide power generation and medical facilities as well as a parking garage. The thr

    Jan 1, 2017

  • DFI
    Crosshole Sonic Logging Versus Perimeter Sonic Logging: What Have We Learned?

    By Cory McElprang, Enamul Hoque, Aaron Thomas, Scott A. Jacobs

    Crosshole Sonic Logging (CSL) only evaluates concrete on the inside of reinforcing cages leaving the outside unevaluated unless other types of testing are performed such as Perimeter Sonic Logging (PS

    Jan 1, 2019

  • DFI
    Low Overhead Secant Piles Drilled From Within A Shaft

    By Allen B. Stanton, Parthiv Brahmbhatt, Michael Grimm, Stanley L. Worst

    Constructing a circular shaft consisting of secant piles has its own complications which make it more difficult than typical drilled shaft construction. Add to that performing under low overhead power

    Oct 1, 2022

  • DFI
    Effects of Atmospheric Conditions on Energy Pile Performance

    By Melissa S. Beauregard, Randall A. Pietersen

    This study focuses on quantifying the effects of water infiltration on a full-scale energy pile system’s ability to meet the thermal demand of an HVAC system. Theoretically, an energy pile system shou

    Jan 1, 2019

  • DFI
    Dulles Metrorail/Silver Line (Phase 2) Drilled Shaft Lateral Load Testing Program

    By William Billiet

    "The Dulles Silver Line Phase II is an 11.4 mile extension of the Washington Area Metro Transit Authority’s Silver line in northern Virginia. There are three miles of elevated guideway, which are supp

    Jan 1, 2017