Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
An Investigation of Grouted Pile Capacity Using Instrumented Pile Load Tests
By Hayel M. El-Naggar, Sherif A. Akl
Although grouted piles have been used for several decades since the idea was proposed in the 1970s, their design is mostly based on experience and unpublished proprietary methods. There is little rese
Jan 1, 2018
-
Statnamic Pile Testing Case Studies
By Michael J. Brown
It is often necessary to undertake some form of pile testing to verify design calculations. Historically this has been limited to static and dynamic tests. Newer rapid testing methods such as Statnami
Jan 1, 2006
-
Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case History
By Gregory A. Stephan
A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is
Jan 1, 2003
-
Capacity Of Driven Piles In Sand
By Mohab Sabry
Pile foundations are used extensively around the world to support both inland and offshore structures, including important structures such as nuclear plants and oil drilling platforms. The limit of th
Jan 1, 2006
-
Differing Site Conditions
By James J. Tansey
A Deep Foundations Institute meeting with the University of Michigan at Ann Arbor in March of 1984 featured legal rights under Differing Site Conditions. A workshop conducted by the authors and Gerard
Jan 1, 1985
-
The Effect of Arching Pressure on a Vertical Circular Wall
By Sangseom Jeong, Kyoungyul Kim, Jaeyeon Cho
"Abstract The lateral earth pressure of vertical circular shaft is investigated by using experimental tests and a theoretical analysis. The emphasis was quantifying on the magnitude and distribution o
Jan 1, 2014
-
Complex Piling Works At London Blackfriars Station
By Jamie D. McEwan
To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui
Jan 1, 2011
-
The Synergy Between Theory And Practice In Geo-Engineering
By Bas R. Hemmen
GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper
Jan 1, 2006
-
State Of The Art In Double Rotary Drilling - Experience Gained From Practice
By Markus Schönit
Double rotary drilling combines continuous flight auger drilling with a casing for producing a cast-in-place pile. When producing a pile an outer casing and an auger (hollow auger) rotating inside
Jan 1, 2011
-
The Application Of The Caisson In China
By Chen Xizhe
The caisson is adapted to the foundation of concentrated heavy building. As there are the flowing sand, boulder or cobble and other serious obstruction, the open caisson can't sink, the caisson c
Jan 1, 1991
-
In Luxembourg-Walferdange 2 Problems Concerning The Geodynamic Motions Of The Planet Earth Are Studied Since 1963 - A) The Earth Tides
By experience we know about the natural event of ocean-tides. In geophysics we say that the earth-tides phenomenon is the elastico-viscous response of the earth's body to the attraction potential
Jan 1, 1987
-
Use of Menard Pressuremeter Test Results to Predict a Bearing Capacity and Settlement of Bored Piles
By Ramdane Bahar
"Abstract The design foundations can be performed using Menard pressuremeter rules that require a limit pressure and a pressuremeter modulus. In recent years, another trend of interpretation of this t
Jan 1, 2014
-
Settlement Behaviour Of Pile Foundation ? Synopsis
By W. Y. Xu
In comparison with shallow foundation, usually higher bearing capacity, smaller average settlement and better stability are the engineering characteristics of pile foundation. Besides, a smaller diffe
Jan 1, 2010
-
High Capacity Rock Anchors At The Bear Mountain Bridge
By Frederick C. Rhyner
This paper describes the design and construction of two high-capacity rock anchors to restrain a supplementary backstay for the Bear Mountain Bridge, which is a suspension bridge spanning the Hudson R
Jan 1, 2010
-
Application Of Neurofuzzy Approach To Estimate Duration And Evaluate Delay For Diaphragm Wall And Barrette Construction
By Thoedtida Thipparat
The diaphragm walls and barrettes are very important to the constructions of multi-storeyed buildings, elevated expressways, subway railway stations, etc. Uncertainties particularly increase in accord
Jan 1, 2006
-
Numerical Simulation Of Quasi-Static Pile Load Test
By N. Q. Huy
This paper describes the application of finite element analysis to simulate the static and quasi-static pile load tests in different drainage conditions. The possible effect of excess pore water press
Jan 1, 2006
-
Ultimate Soil Pressures For Pile Groups In Soft Clay Subjected To Lateral Soil Movements
By L. F. Miao
Studies were carried out to investigate the ultimate soil pressure acting on pile(s) undergoing lateral soil movement in soft clay. A special apparatus has been designed to apply a uniform rectangular
Jan 1, 2008
-
New Method for Reduction of Settlement Drilling Casings for Steel Core Piles
By Larsson Lars-Erik, Rani Isa, Martin Jönsson, Håkan Bredenberg, Mats Larsson
"IntroductionSteel Core Piles are used extensively in Scandinavian countries, where hard rock is found within reasonable depths. A steel core is cast into a drilled steel tube casing and a rock hole i
Jan 1, 2014
-
Time Dependent Open-End Pipe Pile Capacity Assessment By Dynamic And Quasi-Static Methods
By Derrick D. Dasenbrock
Three piers of a new river bridge are supported on 1.067 m diameter open-end steel pipe piles. At time of drive, and after pile re-strikes, high-strain dynamic capacity values at plan tip elevations,
Jan 1, 2006
-
Augered Cast-In-Place Piles Deep Foundations Institute (DFI) 1988 Annual Meeting - Ritz-Carlton Hotel In Atlanta (Buckhead), Georgia
By James J. Neate
The augered cast-in-place pile system came into use in the late 1940's where various techniques were tried using pressure grouting methods. In the early development stages some piles were install
Jan 1, 1988