Mechanical Characterization of a Chemically Stabilized Soft Soil Reinforced with Fibers When Subjected to Tensile Solicitations
By J. M. N. P. C. Teles, Venda Oliveira P. J., Correia A. A. S.
"AbstractA laboratory work was performed to study the mechanical behavior of a Portuguese soft soil chemically stabilized with binders and reinforced with metallic fibers when subjected to tensile str
Jan 1, 2014
-
Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile System
By Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer
"The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of
Jan 1, 2017
-
Geotechnical Investigation For Deep Foundation Projects In Shanghai Area ? Synopsis
By E. R. Wang
This paper outlines the engineering properties of shallow soil in Shanghai area. The main points that should be paid attention to during deep foundation investigation, and general conditions of experi
Jan 1, 2010
-
Overview of Design and Practice of SDS Piles in China
By Gang Guo, Zhong Liu, Yi Zhang, Jingchun Lu
"Abstract Application of soil displacement screw pile (known as SDS pile) has been experiencing accelerated growth in Chinese deep foundation industry because of its technical advantages, environmenta
Jan 1, 2014
-
Getting Paid In Hard Times - I. Formation Of The Contract
By Dennis J. Riley
A. This outline addresses what a sub-contractor, or a subsub-contractor should do to get paid in the event the general contractor or building owner files for bankruptcy. B. Negotiating payment ter
Jan 1, 1991
-
Case History On Pipe Pile Installation - Presented At An Associated Pile & Fitting Corp. GEO-Pile Conference San Francisco, CA
By Jerry F. Parola
In current practice, pile foundation design is based on a general under-standing of pile-soil interaction during installation and superstructure-pile-soil interaction after construction. The pile desi
Jan 1, 1986
-
Press-In Piling Technology For Sustainable Construction
By Philip Dubbeling
Conventional dynamic sheetpiling techniques are ill-suited to urban development because of the emission of excessive noise and ground vibrations. Drilled shafts and slurry walls alleviate some of thes
Jan 1, 2006
-
Case Study: Innovative Soil Nail Stabilization Of A 100 Foot High Urban Slope
By Mike Fabius
The Lakehead Region Conservation Authority is responsible for slopes along the Kaministiquia River, one of the largest tributaries to Lake Superior in Canada. After arresting toe erosion for a mile o
Jan 1, 2006
-
Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) Wall
By Allan Sylvester
Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel
Jan 1, 1997
-
Quality Assurance Of Augercast Piles With Computerized Monitoring - Summary
By Bill Starke
The acceptance of AugerCast piles in Canada has been limited. Many engineers are apprehensive about the quality of the piles produced by this method. However, advances in the sensing instruments and c
Jan 1, 1997
-
Mitigating Settlement with Pile-Supported Approach Slabs
By Reda M. Bakeer
"An approach slab is the roadway segment that immediately follows a bridge intended to provide a smooth transition between the two elements. Some approach slabs have developed rough rideability with t
Jan 1, 2017
-
Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley Site
By Gyimah Kasali
Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)
Jan 1, 2002
-
Unusual Dolphin Monopile Structure
By C. T. Christensen
The paper gives an outline of the design, installation and performance of a series of mooring and berthing dolphins for a major ferry berth outside the port of Elsinore, Denmark. The Dolphins are larg
Jan 1, 1989
-
When Real Estate Values Beckon - The Means And Methods Employed In The Underpinning Of 1501 Broadway
By Edward J. McNamara
People in the real estate industry are fond of saying that the three most important features of a piece of property are, in order, location, location, and location. This is perhaps the reason that the
Jan 1, 2000
-
Axial Pile Displacement Evaluations From Seismic Piezocone Data And Back-Analysis Of Load Tests
By Fawad S. Niazi
Ever since the use of the cone penetration test (CPT) in geotechnical practice, attempts have been made to correlate CPT parameters with pile capacity components of unit end bearing (qb) and unit shaf
Jan 1, 2011
-
World Financial Center Foundations, New York
By G. Tamaro
The World Financial Center is situated on a 60,000 square meter site at Battery Park City at the southern tip of Manhattan Island. The foundations for the buildings and the related infrastructure pose
Jan 1, 1989
-
Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver Formation
By Ken Andromalos
Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili
Jan 1, 2007
-
Hand-Dug Underreamed Piles At Embankment Place, London
By W. J. Grose
The Embankment Place office development over the platforms of Charing Cross Railway Station in London has presented many interesting and unusual problems to the engineers involved with the project. Th
Jan 1, 1989
-
Instrumentation And Interpretation ? Introduction
By H. Mori
The session chairman, Dr. H. Mori, welcomed the delegates to Discussion Session 8. AUTHORS PRESENTATIONS 1 . G. Price, Building Research Establishment. UK Mr. Price expanded on the content
Jan 1, 1991
-
Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems
By Howard A. Perko
Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me
Jan 1, 2008