  • DFI
    Session 21 "Grouting in Karst"

    By Jim Henry

    I would say mainly the cost. I showed only 3 cases. One of them was the one that Allen just described and there were two other cases. In those cases it was fairly easy to develop a solution using limi

    Feb 10, 2003

  • DFI
    Stability Analysis Of Jack-Up Rig At The Bohai Oil Field ? Introduction

    By H. Cheng

    The Bohai Oil Company has applied all together 11 jack-up oil drilling rigs (movable platforms) (1) which can be classified in terms of their forms of foundations into two types: the integ­ral mat and

    Jan 1, 2010

  • DFI
    Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair

    By Richard Brink, Eric M. Klein, Kenneth B. Andromalos

    "A portion of the roof for a 129 x 144-inch, nearly 100-year-old sewer outfall in the City of Baltimore had deteriorated to the point that it resulted in the development of a large sinkhole in a resid

    Jan 1, 2005

  • DFI
    Measured And Modeled Settlements Of Power Plant On Piled Raft Foundations

    By Gianni O. Chieruzzi

    A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t

  • DFI
    Soil and Rock Nail Wall for Construction of a Subterranean Auditorium

    By Andrew Moran, William H. Walton, Matthew D. Emrick, Mary C. Nodine

    "A rapidly growing company in the northern US needed a large auditorium built into a dolomite bedrock hillside. The structure required an 80-foot-deep earth retention system independent of the auditor

    Jan 1, 2017

  • DFI
    Foundation Design And Construction Challenges For The Phoenix Sky Train Project

    By John C. Niedzielski

    The PHX Sky Train is a five mile long automated people mover system located at Phoenix Sky Harbor International Airport. Phase I of the PHX Sky Train includes the design and construction of 227 drill

    Jan 1, 2010

  • DFI
    Applying Reasonable Quality Control and Verification to Soil Mixing

    By David Miller

    "The biggest concern about using soil mixing is the inability to observe physically the final product, which has led to a lack of confidence about what is in the ground. After all, you can’t see it an

    Jan 1, 2017

  • DFI
    The Stiffening Effect of a Caliche Layer on Pile Foundations

    By Richard Stone, Rouzbeh Afsharhasani, Moses Karakouzian

    "Caliche, a hardened sedimentary deposit of calcium carbonate that occurs worldwide, generally in arid or semiarid regions, is frequently encountered in Las Vegas, Nevada. The presence of a caliche la

    Jan 1, 2015

  • DFI
    Proposed Micropile Section for the 2006 IBC

    By Lawrence F. Johnsen, Marc J. Gallagher

    "Micropiles are small diameter, bored, grouted-in-place piles incorporating steel casing and/or reinforcements. The omission of micropiles from most United States building codes has resulted in the ap

    Jan 1, 2005

  • DFI
    Application of Special Geotechnical Construction Equipment at the Alaskan Way Viaduct Replacement Project

    By Richard Hanke, Franz-Werner Gerressen

    "The twin decked Alaskan Way Viaduct is a passage to Seattle’s downtown waterfront and of great economic importance to the city. In 2001, the Nisqually earthquake damaged the viaduct and led to the re

    Jan 1, 2015

  • DFI
    Construction of Jacking Pits in Boston’s Central Artery/Tunnel Project

    By Arturo Ressi di Cervia

    "The Construction of the Thrust Pits for Jacking of the I-90 Tunnel for the Central Artery/Tunnel Project (Part of Contract No. C09A4) in Boston MA was nominated for DFI’s 2002 Outstanding Project Awa

    Jan 3, 2003

  • DFI
    Settlement Control Of A Road Embankment Using Vertical Drains

    By Wei Tu

    A grade separation was required to allow uninterrupted traffic crossing for a busy rail spur and a county road. The grade separation was achieved by creating a 30-foot (9-meter) high embankment that

    Jan 1, 2009

  • DFI
    High Strain Testing Of Large Diameter, High Capacity Unlined Bored Piles ? Introduction

    By Dhanvin B. Mehta

    Pile testing is generally understood as static load test. It is our common experience that for high capacity, large diameter bored piles, static testing is expensive and time consuming. It is practica

    Jan 1, 1996

  • DFI
    Deep Drilling at Mica Dam, British Columbia

    By Douglas G. Baker, Jason K. Braund-Read, Megan R. Sheffer

    "Mica Dam, owned by British Columbia Hydro, is an 820 ft high earthfill embankment dam that was completed in 1973. The dam consists of a thin central impervious till core supported by upstream and dow

    Jan 1, 2017

  • DFI
    Keynote Lecture 5: Giovanni Lombardi Grouting of Rock Masses

    By Giovanni Lombardi

    In order to get a clear overview of the grouting works carried out, to avoid misinterpretations of the data and functions shown on the display of the grout monitoring device, it is recommended to keep

    Feb 10, 2003

  • DFI
    Wick Drains into the unknown

    By Brian McGlynn

    There are many factors that can result in a site characterization being limited. For example, a client may undervalue the importance of a good geotechnical report, or an owner may feel that it would t

    May 1, 2023

  • DFI
    Studies On Pile Driving Cushion Materials ? Synopsis

    By H. R. Shen

    Cushion materials are one of the most important links in an efficient piling system. In the past, little has been done in China on this problem, so engineers are still used to those traditional woods,

    Jan 1, 2010

  • DFI
    Sustainable Products For Geotechnical Works

    By Marcus Daubner, Karsten Beckhaus, Florian Bauer

    The construction industry can and needs to contribute to a more sustainable world. Accordingly, geotechnical works potentially have a significant share. In this context, Bauer understands “sustainable

    May 1, 2022

  • DFI
    Challenges in the Design and Construction of Deep Foundations for Transportation Infrastructure Projects

    By Dan Brown

    Renewal and revitalization of transportation presents a challenge in the need for replacement, repair, and improvements of existing bridges, as well as increased construction of transit systems within

    Jan 1, 1900

  • DFI
    Partnering for Cutoff Wall Project Success

    By Osvaldo Valdez, Matteo Bertoni, Aem Ragy

    The East St. Louis Deep Cutoff Wall project is located in the area of East St. Louis, Illinois, across the Mississippi River from the city of St. Louis, Missouri, along the left descending bank of the