Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Dust Control, Brenda Mines Limited, Peachland B.C.

    By J. W. Austin

    "Introduction The Brenda dust collection system was originally designed to handle air at the 5000 ft. elevation with less than 1 grain of dust per cubic feet of air handled. The temperature variation

    Jan 1, 1976

  • CIM
    The Post-Failure Characteristics of Rock - Pt 1: Intact and Broken Rock

    By T. G. Joseph

    A strain-softening constitutive relationship is introduced that describes the post-failure stress-strain curve for rock regardless of whether the rock is intact or broken. The core of this relationshi

    May 1, 2002

  • CIM
    Improvements in Gravity and Overall Gold Recovery at NVI Mining Ltd. Myra Falls Operation

    By Linda Duncan, Trevor Yeomans, Chris Potorieko, Michael Fullam

    "NVI Mining’s Myra Falls Operation is a 4,000 mtpd copper/zinc flotation circuit with by product gold of ~28,000 ounces per year. Gold recovery has historically averaged 40-55%, however, a portion of

    Jan 1, 2006

  • CIM
    A Focus on Variability within the Orebody for Improved Design of Flotation Plants

    By Glenn Kosick, Roger Amelunxen, Glenn Dobby

    "The variability in flotation response within an orebody is often a significant problem to address during the design phase of a flotation circuit. In addition, for existing operating plants, the reaso

    Jan 1, 2002

  • CIM
    Engaging First Nations Communities

    By Glenn K. Nolan

    "Today, more than any other time in recent history, aboriginal communities are looking for ways to be understood as more resource development companies continue to explore and develop Canada's vast re

    Jan 1, 2008

  • CIM
    Meeting the Transportable Moisture Limit for Lead Concentrates

    By H. P. Jacobi

    "INTRODUCTIONPine Point Mines, operated by Cominco Ltd., is located approximately 65 miles east of Hay River, N.W.T. on the south shore of Great Slave Lake.The milling operation started in the fall of

    Jan 1, 1975

  • CIM
    New tax rules affect debt financing

    By Robert B. Parsons

    "New tax rules that can apply to the repayment, extinguishment, or other settlement of a company's debt are finally taking shape. These new rules are far-reaching in their application, and can af

    Jan 1, 1995

  • CIM
    The Effect of Fine Grinding on Copper and Zinc Metallurgical Performance at Sherritt Gordon Mines Limited Ruttan Mine, Leaf Rapids, Manitoba

    By C. B. Webber, W. A. Grell

    "Sherritt Gordon's Ruttan Mine is a copper-zinc operation located approximately 600 miles north-west of Winnipeg. Open pit mining began in 1973 at 10,000 Tpd., with a change over to underground mining

    Jan 1, 1982

  • CIM
    Overview of maintenance practices at Louvicourt mine

    By R. Hamilton

    "Louvicourt mine began operation in 1994. It is located in northwestern Quebec, 20 km east of Val d’Or. The mine is owned by Aur Resources (30%), which operates the mine, Teck/Cominco (25%) and Novico

    Jan 1, 2003

  • CIM
    Using Magnetic Liners to Reduce costs and Improve Efficiencies

    By Terry Keough

    Contents for discussion ?Current liner technology ?Innovation of magnetic products ?Development of magnetic wear liners ?Installation and change out method ?Uses and capabilities ?Internal we

    May 1, 2010

  • CIM
    Emperical Design of Stopes for the Lower Rodeo Orebody

    By Denis Thibodeau

    The selected mining method for the Rodeo lower Zone is slot and slash. Initial design indicated that the stope height should be limited to a maximum of 18 m, thus six levels were needed to extract the

    May 1, 2002

  • CIM
    A Commodity Cycle ? Where Are We?

    By David D. Davidson

    Commodities remain hot for the time being, but for how much longer? The bulls point to global economic growth lead by China?s insatiable demand for raw materials. To further emphasis the bullish view

    Apr 1, 2005

  • CIM
    Maboumine Process: A Promising Process for Developing a Polymetallic Ore Deposit - Focus on the Downstream Part of the Process: Rare Earth Recovery

    By S. Belair, V. Weigel

    As a growing mining company, ERAMET is looking for new positions on the strategic metals market. In this context, the Gabonese Maboumine pyrochlore deposit is currently being studied for the recovery

    Jan 1, 2014

  • CIM
    Hydraulic Excavator versus Electric Rope Shovel Performance

    By J. Sammut, T. G. Joseph, R. Andreev, M. Curley

    "Decisions regarding mining method and subsequent choice of excavator must take into account the quantitative factors of productivity, availability, and capital, operating, and maintenance costs. Dig

    Jan 1, 2019

  • CIM
    Backfill Practice at Copper Cliff North Mine (CCNM)

    By Ike Isagon

    Backfilling has become an integral process in underground mining operations, with varying cost-effective forms of application. This study is a part of an overall investigation into the backfill practi

    May 1, 2011

  • CIM
    A Frother Concentration Meter

    By J. A. Finch, T. Weber

    "Bubble size in flotation is strongly influenced by frother concentration in the pulp liquor. There is no accepted method of judging the dosage and thus how effectively frother is being distributed to

    Jan 1, 2003

  • CIM
    Cut off Grade Optimizer Integrating Contaminant Constraints

    By Sebastián H. Troncoso

    Open pit mine planning is normally based on the selection of an economic envelope that has been generated by the Lerchs & Grossman algorithm, which requires individual economic valuation of each block

    Oct 1, 2009

  • CIM
    Spodumene Processing at TANCO

    By J. Flemming, R. O. Burt

    "The Tanco pegmatite is located in the Bird River greenstone belt of southeastern Manitoba approximately 160 km northeast of Winnipeg (Figure 1). This pegmatite body was discovered in 1929 and subsequ

    Jan 1, 1986

  • CIM
    Environmental Improvements at Sudbury, Ontario

    By R. E. Michelutti

    "The Sudbury area environment became drastically altered commencing in 1871 with lumbering, repeated fires and early open roasting operations from 1887 to 1929. These combined factors had such a prono

    Jan 1, 1986

  • CIM
    Stochastic Simulation of Open Pit Pushbacks with a Production Simulator

    Material scheduling, sequencing planning and execution are the core tactical mine plan for achieving production targets that maximize the objective function of any mine production entity. This objecti

    May 1, 2004