Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Precision and Bias For Settlements

    By Jan W. Merks

    "The settlements between mines and smelters are based on the mass of metal contained in concentrate lots. The mass of contained metal is a function of the wet mass of a lot, and its moisture content a

    Jan 1, 1995

  • CIM
    From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona Mill

    By Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux

    "The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur

    Jan 1, 2013

  • CIM
    The Operating Range Method for Backfill Hydraulics

    By D. J. Hallbom

    This paper presents a novel methodology for the hydraulic design of mine backfill distribution systems. The ?operating range? method uses the concepts of the hydraulic grade line and equivalent pipe l

    May 1, 2007

  • CIM
    The Economics of the Carbon in Pulp Treatment of Low Grade Flotation Tailings: A Pilot Study

    By R. H. O. Wagner

    "This paper describes the bench testing, pilot plant studies of alternative flowsheets, to determine the feasibility of gold recovery, by carbon in pulp extraction, in the Schumacher Mill gold flotati

    Jan 1, 1984

  • CIM
    Enrichment of Low Grade Iron Ore for Better Resource Utilisation

    By L. Parthasarathy, S. K. Pan, M. P. Srivastava

    "Total iron ore reserves in India, as reported by the Indian Bureau of mines, are 23.6 billion tons. Hematite iron ore reserves constitute about 45 % of the total reserve. If we go by the National Ste

    Jan 1, 2008

  • CIM
    Accounting for Dilution in Ore Resource Estimation

    By Mario E. Rossi

    The full economic evaluation of a mining project requires a block model that provides an estimate of the tons and grades of available resources. The model must be representative of the mineralization

    May 1, 2009

  • CIM
    Improving Fine Lead and Silver Flotation Recovery at BHP-Billiton’s Cannington Mine

    By Glenn Clarke, Ben Holloway, Barry Lumsden

    "BHP-Billiton’s Cannington mine in Northwest Queensland produces a silver-rich lead concentrate and a zinc concentrate. The plant has the capacity to treat 3.1 mta and for the year to June 2006 mean f

    Jan 1, 2008

  • CIM
    A New Curriculum Prepares Future Engineers in Mineral Processing and Extractive Metallurgy at Laval University

    By Daniel Hodouin, Claude Bazin, René del Villar

    "A traditional linkage has long been established at Laval University's Department of Mining & Metallurgy between the Mineral Process (MP) and the Mining Exploitation (Min) on one hand, and between the

    Jan 1, 1999

  • CIM
    Use of the IREDES Standard For Real-Time Information Exchange in Mining Process Optimization

    By Christoph Müller

    Information exchange for mine process optimization is essential. Today, modern mining equipment uses the IREDES standard to exchange production plans and reports for easy management and storage. To ga

    Oct 1, 2009

  • CIM
    Residual Effects of Lognormality in Concentrator Data

    By Norman O. Lotter, André R. Laplante

    "The pursuit of concentrator surveying for purposes of metal accounting or process optimization has not yet connected with the well-published realm of geostatistics. The reality of lognormality in tim

    Jan 1, 2005

  • CIM
    Update of Span Design Curve for Weak Rock Masses

    By Andrea M. Ouchi

    A major focus of ground control research presently being conducted by the Geomechanics Group in the University of British Columbia Mining Engineering Department is to incorporate weak rock masses (RMR

    May 1, 2004

  • CIM
    Copper Concentrate Quality Improvements at Myra Falls (40th Annual Meeting of the January 22 to 24, 2008 Canadian Mineral Processors Ottawa, Ontario, Canada )

    By Trevor Yeomans

    "NVI Mining’s Myra Falls Operation is a forty year old underground mining operation feeding a 4000 mtpd concentrator.The current Mill, built in 1985, was designed to process a large massive sulphide o

    Jan 1, 2008

  • CIM
    Evolving Equipment Health, a Rio Tinto Case Study

    By Daniel D. M. Adams

    Over the last 100 years industry in general has been trying to advance the ability to maintain systems through management processes. Mining has looked to utilize onboard data systems in our mobile min

    May 1, 2011

  • CIM
    A Plant-Wide Control System for Flotation Level Control

    By D. G. Hulbert, J. H. Schubert, R. G. D. Henning

    "Froth depth, along with reagent addition and aeration rate, is one of the crucial factors that can be used to control a flotation circuit. Sub-optimal setpoints and disruptions in levels have a sever

    Jan 1, 1995

  • CIM
    Assessing the Returns to Copper Exploration, 1989-2008

    By R. A. Leveille, M. D. Doggett

    "Economic returns for the copper industry have been assessed by building cash flow models for each of the 100 new mines brought into production over the past 20 years. Ninety-one of the 100 new mines

    Jan 1, 2009

  • CIM
    Fracture Mechanics Numerical Modeling ? Potential and Examples of Applications in Rock Engineering

    By T. Backers

    In fracture mechanics modeling the rock mass is seen as the combination of rock material and fractures, which are evident on different scales. The activation and propagation of fractures dominates the

    May 1, 2009

  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • CIM
    Mine Planning Guidelines for Developing Sustainable Closure Drainage Systems

    By Leslie F. Sawatsky

    Failure of drainage works is one of the principal threats to the sustainability of mine closure facilities but the risk can largely be remedied by appropriate design of mine closure drainage facilitie

    May 1, 2004

  • CIM
    Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfill

    By T. Belem

    The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective

    May 1, 2007

  • CIM
    The Management of the Development Process of the Structure of Large-Scale Production and Transportation Systems

    By Buse Florian

    This paper presents the specific features of the large-scale production and transportation systems (LSPTS), describing the main notions and characteristics of the LSPTS elements. A methodologically un

    Oct 1, 2009