Analysis of Panel Stability for Post-Mining Slurry InjectionBy Tim Ross
Slurry injection into mined-out panels is an attractive alternative for disposal of coal preparation plant fines. however, in areas where surface subsidence cannot be tolerated, either by law or neces
Jan 1, 1998
-
Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery RoomBy Tom Wynne
In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre
Jan 1, 1993
-
How To Cope With Cutter Roof Problem (e6639bdb-2d11-4a70-a3df-8a3a479f7b3e)By A. Wahab Khair
This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the advance
Jan 1, 1992
-
The Design of Room and Pillar Mining Systems in the UKBy Graham Daws
State of the Art Room and Pillar mining techniques have been employed at two coal mines in the UK in the last two years. This paper describes the design of pillars and rockbolted support systems for R
Jan 1, 1998
-
A New Rockbolt Axial Load Measuring DeviceBy Hani Mitri
A new monitoring device called SAFEBOLT (Stress And Force Evaluator in Bolts) has been recently developed. The device SAFEBOLT, essentially replaces the load cell, it permits the monitoring of bolt a
Jan 1, 2001
-
A New Rock Mass Failure Criteria Based On Rate Of MovementBy Hamid Maleki
A new failure criteria is proposed for assessment of roof stability in underground sedimentary rocks. Unlike other stability assessment techniques, this method is simple and practical, having improved
Jan 1, 1990
-
Roof Bolt Response To Shear Stress: Laboratory Analysis (01deebbf-0c9c-422b-b7e0-1ccfd8e161d8)By Ed Mchugh
Recent studies by researchers from the National Institute for Occupational Safety and Health indicate that shear loading contributes significantly to failure of bolts used for rock reinforcement in co
Jan 1, 1999
-
Tekflex As A Sprayon Screen Replacement In An Underground Hard Rock MineBy Chris Pritchard
Falconbridge Ltd., a major base metal producer in the Sudbury Basin of Ontario, Canada, identified a need to find a safe and cost effective replacement for welded-wire mesh used to support loose groun
Jan 1, 1999
-
Massive Pillar Failure--Two Case StudiesBy David H. Tang
Similar massive pillar failures were observed in two underground coal mines with different configurations of mine workings and overburden depths. Finite element models were used to analyze the causes
Jan 1, 1984
-
A Novel System For Automatic Installation Of Cement Grouted Roof BoltsBy A. Mahyera
BETTER ROOF SUPPORT During the last decade, resin-grouted roof bolts have taken a substantial foothold in the coal mining industry - now accounting for about one-third of all bolts installed annual
Jan 1, 1984
-
A Case Study of Bolt Performance in a Two-entry GateroadBy Stephen P. Signer
This paper presents the results of a case study conducted in a two-entry gateroad in a coal mine where excessive roof deformation and bolt loading resulted in failure of many roof supports. The instru
Jan 1, 1998
-
Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving MiningBy Qiang Fu
ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element
Jan 1, 2002
-
Innovative Rock Reinforcement Hardware (a5497235-47bd-4c2e-8654-b4e79927169e)By D. F. Howarth
Two innovative ground reinforcement products have been developed for use in the mining industry. One of these products is a high strength polyethylene (HOPE) bar for use as a rib bolt in underground c
Jan 1, 1992
-
Jointing Effects On Pillar StrengthBy Gabriel Esterhuizen
When designing pillars in coal and hard rock mines it is necessary to determine the strength of the rock mass forming the pillars. Empirical strength equations, based on rock mass classification techn
Jan 1, 2000
-
Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)By Winton J. Gale
The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o
Jan 1, 1992
-
A System to Provide Early Warning on Impending GoafBy Gift Makusha
Total extraction mining of coal is being undertaken on a small scale by Anglo Coal South Africa. Longwall mining has been done in the group at New Denmark colliery since the 80s and recently the compa
Jan 1, 2005
-
Three-Dimensional Analysis Of Mine Dump Point StabilityBy Radoslaw L. Michalowski
The operation of mobile mining equipment near the crest of stockpiles and wastedumps often results in localized slope failures. The Bureau of Mines has developed a computer code based on a rigorous li
Jan 1, 1990
-
Abutment Pillar "Notching" Improves Abutment Tunnel Roof Conditions At The Cayuga Rock Salt MineBy David B. Plumeau
The Cayuga Mine, a deep rock salt mining, operation, changed from a standard room and pillar mine design to a yielding pillar/pressure arch design five years ago. In general the roof conditions improv
Jan 1, 1981
-
Stability And Control Of Immediate Roof Of Fully Mechanized Coal FaceBy S. Y. Liu
Based on the underground measurements, physical model test of simulated materials in the laboratory and finite element analysis, this paper demonstrates the pattern and process of roof fall over the t
Jan 1, 1990
-
Surface Movement of Super-wide Longwall Panels Using Top-coal Caving MethodBy Cao Shenggen
Experiences in the developed countries have shown that continuous increase of panel width (or face length) is one of the major technical trends for high production high efficiency mines. Increasing th
Jan 1, 2003