Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Method for the Selection of Rock Support Based on Bolt Loading Measurements

    By Stephen P. Signer

    A method to assist in the evaluation and selection of roof bolts using in situ measurements of roof bolt loading has been developed by researchers of the Spokane Research Center, National Institute of

    Jan 1, 1997

  • SME-ICGCM
    Development and Implementation of the “Spin to Stall” Resin Bolting System at Anglo Americans Australian Underground Coal Operations

    By Ismet Canbulat, John Naylor, Jason Emery, Peter Craig, Andy Sykes

    "Longwall mining is by far the most common method of underground coal extraction in Australia. The industry trends and expectations are placing increasing emphasis on the reliability and productivity

    Jan 1, 2015

  • SME-ICGCM
    Failure Modes Of Mine Tunnels In Stratified Rock Structures With Reference To Stress Field Conditions

    By Hui Chen

    The paper describes the use of a physical model technique to investigate the failure modes of mine tunnels with reference to the in situ stress field. The characteristics of stratification commonly en

    Jan 1, 1993

  • SME-ICGCM
    Innovative Ground Support System (23660f1b-763d-4a59-bd83-98b27cd5764f)

    By P. A. Gray

    Artificial ground support has developed into a relined science over the past 20 years. From reactive support systems such as timber props and steel supports, to active systems such as roof bolts and c

    Jan 1, 1992

  • SME-ICGCM
    Pillar Design In Bump-Prone Deep Western U.S. Coal Mines (e849bf38-924c-4a19-8729-5910f69616a3)

    By N. P. Kripakov

    This paper presents a brief overview of current bump mechanics theories and pillar design methodologies, and relates these concepts to experiences at two mines located in a north-central Utah coalfiel

    Jan 1, 1992

  • SME-ICGCM
    Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)

    By S. J. Mitchell

    An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz

    Jan 1, 1984

  • SME-ICGCM
    Estimating Rock Strengths Using Drilling Parameters During Roof Bolting Operations - Progress Report

    By Yi Luo

    Accurate mechanical and geological information of the roof strata is vital for roof bolting design in underground mines. In order to obtain such information in a timely manner, a research has been und

    Jan 1, 2002

  • SME-ICGCM
    Suspension Designs Required in the Logical Framework

    By Ross W. Seedsman

    The logical framework recognises that a coal mine roof can be intrinsically stable or may collapse in one of four ways. Suspension of the immediate roof is one of fundamental ground control strategie

    Jan 1, 2014

  • SME-ICGCM
    Comparison of Closure Measurements with Finite Element Model Results in an Underground Coal Mine in Central Utah

    By Jessica M. Wempen, William G. Pariseau, Michael K. McCarter

    "Quantitative analysis of mine-wide subsidence at the kilometer scale and details of stress distribution about an advancing longwall face are estimated using an adaptation of the finite element method

    Jan 1, 2018

  • SME-ICGCM
    Developments in Sealant Support Systems for Ground Control (21st international Conference on Ground Control in Mining)

    By Deno Pappas

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) has been evaluating developments in sealant support systems from a gr

    Jan 1, 2002

  • SME-ICGCM
    Optimizing Secondary Roof Support With The NIOSH Support Technology Optimization Program (STOP) (9d51b6a2-7ba0-4aba-9b0e-5647ea8b90eb)

    By Thomas M. Barczak

    The decade of the 90's brought an unprecedented increase in the development of innovative technologies to provide more effective and easier to install roof support in underground mines. To facili

    Jan 1, 2000

  • SME-ICGCM
    Mine Convergence When Using Mobile Roof Supports In Pillar Recovery

    By J. R. Stoltz

    To date, there has been limited formal research dealing with the use of Mobile Roof Supports (MRS) for pillar recovery. This paper, which is a portion of a larger project, presents convergence data fr

    Jan 1, 1999

  • SME-ICGCM
    An Overview Of Bureau Of Mines Ground Control Research

    By John M. Karhnak

    The Bureau of Mines has a long history of research in Ground Control. For many years, this work was done at Bureau facilities by Bureau researchers. As the tiles changed, however, the area of research

    Jan 1, 1981

  • SME-ICGCM
    Using The Point Load Test To Determine The Uniaxial Compressive Strength Of Coal Measure Rock (993fe9c2-59a0-4335-9e4c-58da9811402f)

    By John A. Rusnak

    Point load testing is used to determine rock strength indexes in geotechnical practice. The point load test apparatus and procedure enables economical testing of core or lump rock samples in either a

    Jan 1, 2000

  • SME-ICGCM
    Frictional Properties of Rock Applied to Mining Excavations

    Results of direct shear tests on rock discontinuities and triaxial compression tests on intact rocks are presented and - discussed. The main parameters considered area stress functions, angle of in

    Jan 1, 1987

  • SME-ICGCM
    Causes of Massive Directional Roof Falls in Room and Pillar Mines - Two Case Studies

    By S. S. Peng

    In recent years many roof falls have been conveniently attributed to the adverse existence of a high horizontal stress. The normal practice of not conducting a follow-up study in a roof fall investiga

    Jan 1, 1999

  • SME-ICGCM
    Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine

    In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,

    Jan 1, 1997

  • SME-ICGCM
    Assessment Of Underground Structural Design

    By Eugene D. Krupa

    Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is

    Jan 1, 1990

  • SME-ICGCM
    Utilization Of Polymer Grid Structures In Shield Recovery Operations

    By Brian E. Travis

    Recent Developments in the utilization of polymer grid structures for Longwall Shield Recovery operations are discussed. Specifically: various Longwall screen designs and the numerous methods employed

    Jan 1, 1993

  • SME-ICGCM
    The Broken Rock Zone Around Tunnels And Its Support Theory

    By Fangting Dong

    The broken rock zone (BRZ) and the tunnel support theory are investigated. The relationship between the BRZ and the related factors, the interaction between the BRZ and supports, and the function of s

    Jan 1, 1988