Control Of Mine Subsidence Utilizing Coal Ash As A Backfill MaterialBy D. W. Evans
Mine subsidence problems due to coal extraction have occurred in a number of areas throughout the United States. Depending on the local geology, the depth of the mined seam, the type of mining method
Jan 1, 1982
-
Investigation of Electromagnetic Emissions in a Deep Underground Mine (0366ea57-3ba7-4a00-bec7-825a048e7e26)By Douglas Scott
Highly stressed rock in stopes continues to be a primary safety risk for miners in underground mines because it can result in failures of ground that lead to both injuries and death. Spokane Research
Jan 1, 2004
-
Support of Tunnels in South African Gold MinesBy L. Z. Wojno
Tunnels in South African gold mines are developed at depths down to 3 600 m below surface where the virgin rock stress approaches 100 MPa and, on occasions, through rock where the field stresses excee
Jan 1, 1987
-
Stress Control Method Applied to Stabilization of Underground Coal Mine Openings (e5cbe8ad-30a8-4144-a7b5-db19e81a247a)By Shosei Serata
Serious floor heave of up to 2.4 m in a 2.4-m high mine entry was eliminated by applying the stress control method of mining, as a last resort, at the No. 5 coal mine of Jim Walter Resources, Inc., in
Jan 1, 1984
-
Field Measurements of Chain Pillar Response to Longwall Abutment LoadsBy Christopher Mark
Current longwall pillar design methods are based on many assumptions about pillar and entry response to longwall abutment loads. Knowledge of the magnitude and time-of-arrival of abutment loads is ess
Jan 1, 1986
-
The Stress And Failure Paths Followed By Coal Mine Roofs During Longwall Extraction And Implications To Tailgate SupportBy Ross Seedsman
Discussion on the design of roof support in tailgates has often been conducted without a clear statement of the stress and failure conditions acting. There is general agreement that in the tailgate th
Jan 1, 2001
-
The Effect Of Hazardous Geologic Structures On Gateroad StabilityBy Frank E. Chase
Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g
Jan 1, 1990
-
Resupporting High Roof FallsBy Nicholas Chlumecky
One of the most dangerous jobs in mining is that of resupporting the roof after a fall has occurred. The resulting cavity may be more than 30 feet high, with relatively unstable sides and roof. It is
Jan 1, 1981
-
Strata Mechanics Of Pillar Extraction Goaf Edges (001afab8-c7ac-48fa-af96-b8de57c1318e)By John Shepherd
Pillar extraction carried out using various methods (split and lift, Wongawilli and old Ben) involves the formation of narrow fenders (commonly 7 m of coal) formed by driving "splits" for lifting off
Jan 1, 1992
-
Application of Yield-Lok Bolt for Bursting and Convergence Grounds in MinesBy Rocky Wu
Rock bursts are one of the greatest challenges to ground control in the mining industry. With increasing mining depth and mining scale, there are more and more industry requirements on yielding rock s
Jan 1, 2011
-
Mistakes, Misconceptions, and Key Points Regarding Secondary Roof Support Systems (b87a5324-ac75-480a-90d7-e642733c14a4)By Thomas M. Barczak
Roof support systems are necessary to provide stable mine openings and much research has been conducted to design a variety of roof support systems that will function in various manners to ensure that
Jan 1, 2001
-
Determination Of Classification Parameters For Clay - Bearing And Stratified Rock MassBy Erdal Unal
In underground mining today, safety and economical aspects demand a better understanding of the rock-mass conditions, particularly for design of underground mine openings excavated in weak and stratif
Jan 1, 1990
-
Rigid Or Yielding Roof Bolts: At The Face Or Away From The Face (3eff2ffb-d0b3-4171-9439-10f9fdec54f7)By R. D. Lama
The concept of rigid or yielding bolts is discussed based upon support requirements for excavations of equivalent geomechanical behaviour. The concept of equivalent geomechanical behaviour is introduc
Jan 1, 1992
-
Improving Roof Control At A South African Coal MineBy Alan Bugden
Goedehoop Colliery produces 8 million tonnes of coal a year, principally from room and pillar mining, and is situated in the Witbank Coalfield in the Republic of South Africa. The mine has a long and
Jan 1, 2001
-
Support Selection For The Multi-Lift Mining MethodBy Claude A. Goode
Large quantities of high grade coal exist in thick seams in the United States. Many of these thick seams are too deep to be surface mined and do not lend themselves readily to underground extraction.
Jan 1, 1981
-
Shear Mechanism for Mining-Induced Fractures Applied to Rock Mechanics of Coal Mines (26fab274-0576-48ca-b03a-d4a9f18550cb)By Brian White
Two examples of en echelon mining-induced fractures seen in hard¬rock mines provided a basis for inferring that fracture zones and bedding plane separations immediately surrounding mine openings are p
Jan 1, 2002
-
Weatherability Test of Rocks for Underground MinesBy Kot F. Unrug
The shale response to moisture changes and the major finding of the appropriate research concerning this subject are briefly reported in this paper. Also described are mine ambient atmospheric condit
Jan 1, 1997
-
Factors Influencing Intersection Stability in U.S. Coal Mines (dc39f664-0f70-474b-be24-4adbb66c7510)By Gregory Molinda
Groundfalls are much more likely to occur in coal mine intersections than in entries. NIOSH is using the experience of U.S. coal mines to determine the factors which influence intersection instability
Jan 1, 1998
-
Continuing Development of Innovative Cable Support SystemsBy John G. Oldsen
Passive cable bolting and active cable trusses have been used in roof support for more than two years Excellent roof control has been experienced by many coal operations. This paper covers the new
Jan 1, 1997
-
Critical Roof Span Approach To Selection Of Proper Coal Mine SystemBy Antoni Kidybinski
Coal mining both with longwall and room-and-pillar method often encounters severe operational difficulties due to had roof conditions. Rooffalls at entry cross-cuts or along the rib line in longwalls
Jan 1, 1982