Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Barrier Pillar Design for Safe and Productive Longwall Mining

    By Stephen C. Tadolini

    Effective barrier pillar design is an essential component for safe and productive underground coal mining. Barrier pillar design methodologies that incorporate sound engineering judgment have been use

    Jan 1, 2013

  • SME-ICGCM
    Ground Response to High Horizontal Stresses during Longwall Retreat and its Implication on Longwall Headgate Support

    By Peter Zhang, Daniel Su, Essie Esterhuizen, Mark Van Dyke, Berk Tulu, Dave Gearhart

    "Roof falls in longwall headgate can occur when weak roof and high horizontal stress are present. To prevent roof falls in the headgate under high horizontal stress, it is important to understand the

    Jan 1, 2018

  • SME-ICGCM
    Regional Horizontal Stress And Its Effect On Longwall Mining In The Northern Appalachian Coal Field

    By D. W. H. Su

    This paper presents the results of ill situ horizontal stress measurements using a Minifrac system in several northern Appalachian coal mines. The effect of stress magnitude and orientation on longwal

    Jan 1, 1995

  • SME-ICGCM
    3-D Discontinuum Numerical Modeling of Rock Mass Stability Investigations Due to Ore Extraction and Backfilling, and Subsidence Estimation for an Underground Mine

    By Srisharan Shreedharan, Gang Huang, Hongqing Song, Sijing Cai, Pinnaduwa H. S. W. Kulatilake

    "Subsidence prediction due to ore extraction and backfilling during open stoping operations for an underground iron mine in China is reported in this paper. Geologic complexities including faults and

    Jan 1, 2016

  • SME-ICGCM
    Cemented Coal Gangue-Fly Ash Backfill Technique

    By Baogui Yang, Jie Yang, Anthony Iannacchione

    "The cemented coal gangue-fly ash backfill technique (CGFB) has commonly been used to control subsidence damage caused by underground coal mining. This paper discusses the CGFB backfilling process use

    Jan 1, 2018

  • SME-ICGCM
    Load Transfer Distance Measurements at Two Mines in the Western U.S.

    By Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson

    "Load transfer distance (LTD) is simple in concept and usually evident in underground coal mines. Many people in the mining industry recognize LTD as the distance from the panel to where the mine ribs

    Jan 1, 2015

  • SME-ICGCM
    Subsidence Over Room and Pillar Retreat Mining in a Low Coal Seam

    By Andre Zingano, Anderson Weiss

    "The objective of this paper is to study the behavior of a low thick and low depth coal seam and the overburden rock mass. The mining method is room and pillar in retreat and partial pillar recovery.

    Jan 1, 2018

  • SME-ICGCM
    Numerical Modeling Of "Stiff" Backfill in the Coeur D'Alene Mining District (17e85e0c-8155-492f-9c87-d2b9dd6611c4)

    By Ed Van Eeckhout

    As part of a U.S. Bureau of Mines-sponsored project on the utilization of "stiff' backflll to minimize potential rock burst hazards, a finite element study was undertaken to predict stresses and

    Jan 1, 1984

  • SME-ICGCM
    Investigation of the Influence of Mining with Caving on Deformation of Roadway Located in Close Proximity of Longwall Panel

    By Andrzej Walentek

    In polish coal mining due to specificity of seams lying the multiple extraction is used. In this kind of mining, it is essential to take into account all geological and mining conditions which have an

    Jan 1, 2013

  • SME-ICGCM
    Underground Mining Technology in Chinese Coal Mines

    By Jiachen Wang

    China is the largest coal producing country in the world. Coal is widely distributed in China and thus the mining conditions are complex and diverse. This paper summarizes the important achievements i

    Jan 1, 2014

  • SME-ICGCM
    Development of a Six Drilhead Roof Bolting Machine

    By Bill A. Kyslinger

    "In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Foresight Energy, J. H. Fletcher & Company was tasked to design

    Jan 1, 2016

  • SME-ICGCM
    Case Study and Design of Standing Steel Set Support for Aged Belt Entry Rehabilitation

    By Kevin J. Ma, John Stankus

    "In order to access remote reserve areas, some U.S. coal mines have to maintain aged underground entries for a great distance. However, high humidity, warm temperature, and time dependent deterioratio

    Jan 1, 2017

  • SME-ICGCM
    Analysis of Roof and Pillar Failure Associated with Weak Floor at a Limestone Mine

    By Tim Miller, Michael M. Murphy, John L. Ellenberger, Gabriel S. Esterhuizen

    "A limestone mine in Ohio has had instability problems that have led to massive roof falls extending to the surface. This study focuses on the role that weak, moisture-sensitive floor has in the insta

    Jan 1, 2015

  • SME-ICGCM
    The Contributions of the Alpha Foundation to Ground Control Research and Development

    By Tom Barczak, Julian Restrepo, Zach Agioutantis

    "The Alpha Foundation for the Improvement of Mine Safety and Health, Inc. (Foundation) was established as part of a Non-Prosecution Agreement (Agreement) entered in December 2011 by the United States

    Jan 1, 2016

  • SME-ICGCM
    Tensile roof failure arising from horizontal compressive stress and geological slips

    By Alan Bugden

    Goedehoop colliery in South Africa has experienced a number of substantial roof falls in roadways and intersections. Many of these have been associated with geological slips and/or horizontal compress

    Jan 1, 2003

  • SME-ICGCM
    Analysis Of Major Failure Through Integration Of Static And Dynamic Rock Mechanics Investigation

    By K. Y. Haramy

    Rock burst and coal mine bump research using static and dynamic rock mechanics instrumentation has been conducted for several decades. Research efforts typically have been conducted using static instr

    Jan 1, 1988

  • SME-ICGCM
    Ground Control Criteria for Coal Reserve Optimization in Multiple-Seam Mines

    By Eric Westman

    Ground control problems caused by multiple-seam interaction frequently sterilize coal reserves. Interaction mechanisms differ for overmining and undermining and are controlled by mining, spatial. and

    Jan 1, 1997

  • SME-ICGCM
    Progress in Managing the Geotechnical Aspects of Longwall Face Recovery

    By David Hill

    "End of panel longwall face recovery is almost certainly the most involved recurring geotechnical problem faced by operators, with major loss potential should problems occur. The paper presents Austra

    Jan 1, 2010

  • SME-ICGCM
    CBM Extraction Engineering Challenges and the Technology of Mining the Upper Protective Seam in the Daxing Mine, China

    By Yuanping Cheng, Jingyu Jiang, Qiang Zhang

    "With the increase of mining depths, deep-seated coal seams face threats from high ground stresses, high gas pressures, high gas content, and low seam permeability, which significantly increase the li

    Jan 1, 2017

  • SME-ICGCM
    What Factors Over and Above Those Included in the Existing Coal Mine Roof Rating (CMRR) Could Also Be Predictive of Roof Instability in Underground Coal Mines?

    By Elizabeth Holley, Meriel Young, Gabriel Walton

    "The coal mine roof rating (CMRR) was developed by Chris Mark and Greg Molinda to bridge the gap between geological variation in underground coal mines and engineering design. The CMRR accounts for th

    Jan 1, 2018