Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Study on Mine Tailings Classification Effected by Co‑disposal of Drilling Wastes with Geochemical CationsBy J. Stawovy, A. Fourie, J. D. Quaranta
Coal refuse impoundments are disposal facilities specifically designed for the coal mining industry. Re-purposing refuse impoundments for co-disposal with natural gas flowback water and waste rock ove
Jul 5, 2022
-
Geotechnical Exploration for a Lake Mead IntakeBy Richard F. Coon
Six potential locations along the west shore of Lake Mead were evaluated to site anew water intake pumping station for the SNWA. The evaluations were based upon geotechnical exploration results and c
Jan 1, 1997
-
Geotechnical Design of Devil’s Slide TunnelBy Y. Nien Wang, Moe Amini, Heiner Sander, Max John
INTRODUCTION As the population increased along the coast route (California Route 1), and the people’s need to have guaranteed access increased, the landslides and related road closures began to ha
Jan 1, 2005
-
Industrial Minerals 2004 - BentoniteBy C. R. Landis
The Wyoming bentonite industry continued its run of stable, if not strong, growth in its complex markets. Growth at the macroscale was fueled by a strong domestic economy, the weakening of the U.S. do
Jan 1, 2005
-
Majors, Juniors Spur Record Attendance at PDACBy Steve Kral
Good times make for happy miners. And the past few years have seen a lot of smiling mining engineers, geologists, metallurgists, corporate executives, analysts, investment bankers and shareholders.
Jan 1, 2006
-
Pump Phase Shift Control in the World’s Largest Iron Ore Concentrate PipelineBy Ralph van Rijswick, Erik Vlot
"Anglo American operates 18 Weir GEHO piston diaphragm pumps (PD) in the two pump stations of the 52-km (32-mile) long Minas Rio iron ore concentrate pipeline. The pipeline is designed to transport 26
Jan 9, 2017
-
Rock Mechanics Of The Davis Detector Cavern ? IntroductionBy W. G. Pariseau
This contribution describes rock mechanics features of the Davis Cavern at the former Homestake Mine in Lead, South Dakota, U.S.A. The mine is located in the northern Black Hills of South Dakota. In
Jan 1, 2012
-
Dust control in room-and pillar coal mining using continuous miners: Additional field evaluationsBy Y. P. Chugh
Additional field evaluations of a modified continuous miner using a new spray system and modified scrubbers have been conducted by the authors. In this demonstration, a comprehensive package for dust
Jan 1, 2009
-
Design And Development Of The Northeast Layback Of The Betze-Post Open PitBy Nick Rose, Robert Sharon, Mark Rantapaa
Development of the Northeast Layback of Barrick’s Betze-Post open pit commenced in June 2000 and was successfully completed to a height of 400m (1,300 ft) in January 2003. Following a brief exploratio
Jan 1, 2005
-
Technology convergence for sustainable underground mine ventilation system controlBy A. M. Tonnos
Underground mining has yet to see an industry wide solution for control of their ventilation systems due to the complexity and sensitivity of the underground environment. Complexity arises from multi-
Jan 1, 2009
-
Safety Control Systems Used In A Hydrogen-Fueled Mine VehicleBy Chelsea Woodward
The Spokane Research Laboratory of the National Institute for Occupational Safety and Health has demonstrated a prototype hydrogen-fueled mining vehicle as an alternative to diesel equipment in underg
Jan 1, 2006
-
Industrial Minerals 2004 - GypsumBy R. D. Sharpe
Gypsum wallboard manufacturers in the United States shipped 3.18 billion m2 (34.2 billion sq ft) of wall-board products during 2004 versus 2.93 billion m2 (31.5billion sq ft) in 2003. Following a hi
Jan 1, 2005
-
Towards a More Cost Effective Mining Truck – Preprint 97-55By A. W. Dickerson, G. Hollier, F. A. Bartley
Following on from many years of research aimed at improving the effectiveness of truck haulage operations in mines operated by BHP Minerals, BHP Research developed a concept for an Innovative Large Mi
Feb 24, 1997
-
Lithologic and Structural Constraints on TBM Tunneling in New York CityBy Charles Merguerian
In medium- to high-grade metamorphic terrains such as found in New York City(NYC), rock mass texture and mineralogy are important factors in predicting TBM penetration destiny. Integration of data fro
Jan 1, 2005
-
Effects of sintered metal diesel particulate filter system on diesel aerosols and nitric oxides in mine airThis study was conducted to establish the effects of a diesel particulate filter (DPF) system with sintered metal substrate on the concentrations and size distributions of nano and ultrafine aerosols
Jan 1, 2009
-
A Review Of Rock Support And Falls In Us Coal Mine Intersections - Preprint 09-132The support of the roof in coal mines remains a critical safety issue with 3 fatalities from roof falls in 2007 and 430 injuries from roof falls in 2006. A snapshot survey by the authors of room desig
Jan 1, 2009
-
3-D Piping Design Speeds Impala Refinery ProjectBy Ian Martin
A precious metals refinery’s switch to personal computer-based, three-dimensional piping design saved many hours in the design of a South African precious metals refinery. Bateman Minerals and Ind
Jan 1, 2000
-
The Oxidative Precipitation Of Thallium In Mining Influenced WaterThallium is an uncommon heavy metal that may be found in concentrations that exceed regulatory limits in mining influenced water associated with processing cadmium, copper, gold, lead, and zinc ores.
Jan 1, 2011
-
Operating a Commercial-Scale Bioleach Reactor at the Congress Gold PropertyBy Ralph P. Hackl
Ore at the Congress gold property, located near Goldbridge, British Columbia, is extremely refractory with most of the gold disseminated in fine-grained arsenopyrite. Metallurgical testwork conducted
Jan 1, 1990
-
Construction Of Shin-Kanmon Tunnel On Sanyo ShinkansenBy Kazuo Magata, Hirohiko Fujita, Masazumi Tashiro, Yoshiaki Sato, Yoshio Shinoda
The Shinkansen of the Japanese National Railways (JNR) presently in operation between Tokyo and Hakata, approximately 1,000 km, was constructed at three stages: between Tokyo and Shin-Osaka opening in
Jan 1, 1976