Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    How An Object-Orientated Modelling Approach For A Mine Option Study Can Increase The Quality Of Decision: A Case Study

    By W. Gabryk

    A large new underground platinum mining project required that all different mining options were investigated during an option study before proceeding to the prefeasibility stage of the project. The ca

    Jan 1, 2012

  • SAIMM
    Innovative technology for processing of gold-containing activated carbon fines, А.Y. Senchenkoa, А.V. Aksenov, and S.G. Rybkin

    By А. V. Aksenov, S. G. Rybkin, А. Y. Senchenko

    Recovered activated carbon fines result from processing of ore and concentrates via cyanide leaching and sorption of valuable metals on carbon at gold-mining plants. This intermediate product is chara

    Jan 1, 2020

  • SAIMM
    Lithogeochemical Prospecting: Signals Processing Applied to Segmentation of Geochemical Borehole Profiles

    By C. P. Smyth

    Large volumes of quantitative geochemical data, presenting a formidable interpretation task to geologists, are generated in the course of exploration drilling for new ore deposits. The incorporation o

    Jan 1, 1987

  • SAIMM
    Multi-Seam Coal Mining ? Synopsis

    By B. B. Tati

    The project report is based on vacation work done by the writer at the Khutala Colliery during December/January 2009?2010. The purpose of this report is to explain and describe the design process in a

    Jan 1, 2011

  • SAIMM
    Cave management at Finsch Mine - Synopsis

    By C. A. Preece

    Finsch Diamond Mine, part of De Beers Consolidated Mines (DBCM), is situated between Kimberley and Postmasburg in the Northern Cape, South Africa. The kimberlite pipe was discovered in 1960 and De Bee

    Jan 1, 2007

  • SAIMM
    Multivariate Resource Modelling For Assessing Uncertainty In Mine Design And Mine Planning ? Synopsis

    By C. Montoya

    This paper shows, through a case study, the impact of multivariate grade modelling upon mine design and mine planning. A deposit explored by drill holes is considered, in which the grades of five elem

    Jan 1, 2012

  • SAIMM
    Physical and numerical modelling of a four-strand steelmaking tundish using flow analysis of different configurations

    By J. H. Cloete, S. M. Bradshaw, D. K. Chibwe

    "The primary function of a tundish in the steelmaking industry is to serve as a buffer tank, accepting molten steel from the batch ladle process and allowing it to be cast continuously. However, moder

    Jan 1, 2014

  • SAIMM
    The Loco Drill And Its Application To Flat End Development

    By K. Moxham, B. McKeown

    The South African gold and platinum deposits were formed in very different ways and yet both have many similarities. They are flat dipping tabular orebodies, extremely narrow and located in hard abras

    Jan 1, 2006

  • SAIMM
    Towards electrode immersion control on Lonmin?s no. 1 circular furnace - Synopsis

    By G. A. Georgalli

    A control philosophy to be applied by Lonmin to maintain constant electrode immersion in their no. 1 circular smelting furnace is put forward. This control philosophy is facilitated though a combinati

    Jan 1, 2008

  • SAIMM
    Mine-wide panel stability monitoring at Anglo Platinum Union JV - Synopsis

    By D. F. Malan

    This paper describes the development and implementation of amine-wide continuous stability monitoring system at the Declines Section, Anglo Platinum Union JV. The Declines Section at Union JV experien

    Jan 1, 2010

  • SAIMM
    Computer Simulation of Pyrometallurgical Processes

    A knowledge of the steady-state mass and energy requirements of a particular process is essential to a determination of the economic feasibility of that process. A predictive simulation technique can

    Jan 1, 1987

  • SAIMM
    Presentation 07 - Novel Applications For Gravity Concentration

    By Kevin Peacocke

    The future of Gravity ? Primary mineral recovery ? Enhancement of existing process efficiency ? Pre-Concentration ? Alternative? or ?New? production

    Jan 1, 2006

  • SAIMM
    Ilmenite Smelting At Ticor SA

    By D. Bessinger, H. Kotzé, J. Beukes

    Keywords: Pyrometallurgy, furnace, ilmenite, smelting, Ticor Ticor SA began with a detailed feasibility study in 1995. The Hillendale mine (situated between Richards Bay and Empangeni) and Minera

    Jan 1, 2006

  • SAIMM
    Alternative methodologies for evaluating explosion-resistant mine ventilation seals

    By M. J. Sapko

    The Pittsburgh Research Laboratory (PRL) of the National Institute for Occupational Safety and Health (NIOSH) recently conducted full-scale explosion experiments; these experiments evaluated the stren

    Jan 1, 2003

  • SAIMM
    Singular Value Decomposition As An Equation Solver In Co-Kriging Matrices - Synopsis

    By M. Kumral

    One of the most significant elements in solving the co-kriging equations is the matrix solver. In this paper, the singular value decomposition (SVD) as an equation solver is proposed to solve the co-k

    Jan 1, 2012

  • SAIMM
    Qualitative And Quantitative Determination Of Inclusions In High-Carbon Steel Alloy (Class B) For Rail Wheel Application By SEM/EDS Analysis - Synopsis

    It is well understood that to develop wagon wheels with higher abrasion resistance, fracture toughness, and fatigue resistance, steels with lower amounts of inclusions need to be used. Clean steels ar

    Jan 1, 2013

  • SAIMM
    Development And Testing Of An Underground Remote Refrigeration Plant

    By D. J. Stanton

    The objective of this study was to develop, install, and test a small underground mobile refrigeration plant (MRP) to deal with some of the real problems associated with mine cooling in an operating m

    Jan 1, 2004

  • SAIMM
    Linear Elastic Numerical Modelling For Failure Prediction, An Assesment - Synopsis

    By S. K. Murphy

    A partial shaft pillar extraction project was embarked on at a mine in the West Wits mining region in South Africa. Prior to the extraction, a rock engineering assessment was conducted with the main o

    Jan 1, 2012

  • SAIMM
    Using post-leach analyses to inform improved co-disposal strategies for long-term acid rock drainage prevention, N. Maliela, D. Mjonono, S.T.L. Harrison, and A. Kotsiopoulos

    By D. Mjonono, S. T. L. Harrison, N. Maliela, A. Kotsiopoulos

    The improvement of coal waste management practices, through the co-disposal of waste rock with sulphur-lean fine waste tailings (<1 mm in size), can potentially mitigate acid rock drainage (ARD). On e

    Jan 1, 2020

  • SAIMM
    An Interactive Computer Program for Simulating the Performance of Water Chilling Installations on Mines

    By M. Bailey-McEwan

    The application of refrigeration on deep South African gold mines is mostly achieved through the medium of chilled water which is produced in central installations either on surface or underground. Th

    Jan 1, 1987