Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Diagnosing and Modifying Off-Site Blast Effects by Seismic Means - A Case Study
By Stuart Brashear, Robert Brush, Ben Cook
In early 1993, the Piney River quarry owned and operated by the Blue Ridge Stone Corporation of W W? Boxley received a series of complaints from the owners of a 130 year-old historic farmhouse that ha
Jan 1, 1996
-
Design and Testing of Bubble Curtain at Whirl Bay, BC
By Alastair Grogan
In October of 2002, the author was retained by Public Works and Government Services Canada, on behalf of the Department of National Defense, to design, construct and test the effectiveness of a bubble
Jan 1, 2005
-
Using Explosive Risk Assessment Tools for Emergency Operations Planning
By Dean Nichols, Matt Ortel
Explosive accidents in the United States have brought increased attention to emergency operation plans (EOP) at all facilities that manufacture, transport, or store hazardous materials – particularly
Jan 1, 2016
-
Response of Manufactured Houses to Blast Vibrations
By Michael Mann
Two house trailers and a modem modular house, all pillar-supported with cantilevered perimeters, were monitored for structural response to vibrations from surface coal mine blasts. Due to the large bl
Jan 1, 2000
-
Algorithms for Adaptive Solutions: Essential Tools for Operational Blast Optimization
By Sushil Bhandari, Amit Bhandari
Blast optimization in open-pit operations is a task that often remains at a theoretical stage. Indeed, when it comes to operational blast design and onsite implementation, time restrictions and field
Jan 1, 2019
-
The Application of Electronic Detonators to Improve Blast Vibration Predictions at Limestone Quarries
By R. Farnfield, W. Birch
Arguably, some of the most restrictive statutory blast vibration requirements attached to mineral extraction operations can be found in the United Kingdom. Such limitations are, as a rule for the UK,
Jan 1, 2006
-
Innovative Blasting Mine Life Extension at a Coal Mine in Australia
By R. Bitmead, R Barker, A. Drake
The opencut coal mine is located about 50 km west of Brisbane, the capital city of Queensland in Australia and produces about 140 000 tonnes per annum of high grade steaming coal utilising a small tea
Jan 1, 2002
-
Blasting of the Twin Creek's Highwall Failure
By James A. Bachmann, Christopher J. Gray
On December 26, 1994, at 1:00 am, Santa Fe Pacific Gold's Twin Creeks Mine experienced a major highwall failure involving over 2.5 million tons. The resulting effects of this slide were thousands of o
Jan 1, 1996
-
Explosive Destruction of an Underground Reinforced Concrete Bunker – Computer Hydrocode Simulation
By Dale Preece
A carefully designed and controlled in-place destruction experiment was performed on a concrete bunker buried in 4.27 m (14 ft.) of soil. The objective was to determine if the explosive charges would
Jan 1, 2006
-
UPDATE: Industry Task Force on Eliminating Blasting-Based Flyrock Incidents
By Joshua Hoffman, Braden Lusk, John Rathbun
A Flyrock Prevention Taskforce was established in Kentucky with the support of Kentucky's Department of Natural Resources, Kentucky's Explosives Industry, and the University of Kentucky. This paper pr
Jan 1, 2013
-
*Kuz-Ram and Digital Image Processing System Combination to Determine Specific Blasting Parameters
By A. Karadogan, G. Tuncer, A. Kahriman
Determination of optimal blast parameters have been the priority act for blasters on the field due to financial and technical properties of the operation. Therefore many researchs were done to establi
Jan 1, 2005
-
Experience with the change from cartridged to bulk site sensitized emulsion products.
By Peter Moser, G. Reihholf
Holcim, one of the world's leading suppliers of cement, aggregates and concrete, has set up a few years ago a working group “Quarry” in order to optimize the performance of its central European quarry
Jan 1, 2006
-
Case Examples of Sensor Coupling Effect on Blast Vibration Measurement and Charge Weight Scaling Plot
By Gabsoo Kim, Rulin Yang, Dave Kay
Blast vibration data, such as PPV are usually scattered. In many cases, plots of PPV versus the charge weight scaled distance are so scattered that useful trends from different blast designs cannot be
Jan 1, 2014
-
The Assessment of Environmental Impacts of Blasting During The Construction of A Metro Tunnel
By Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Mehmet Aksoy, Kagan Ozdemir, Adiguzel Deniz
This paper presents the results of ground vibration measurements induced by blasting during the construction of the Istanbul Kadiköy-Kartal metro tunnel which has been driven at a depth of approximate
Jan 1, 2007
-
The Development of Compact Slurry Explosive Blasting System for Tunneling
By Junya Tokita
In Japan, packaged explosives have traditionally been used as the most common explosive for tunneling. Recently, some blasting systems such as ANFO with a kettle loader and emulsion explosives with a
Jan 1, 2005
-
Smooth Blasting with the Electronic Delay Detonator
By Yoshiharu Tanaka, Toshiyuki Ichijo, Masaaki Yamamoto
We utilized electronic detonators (EDs) to investigate the effect of high detonator delay accuracy on overbreak, remaining rock damage, and surface smoothness, in comparison with that of long-period d
Jan 1, 1995
-
Blasting Solutions For Rapid Mine Expansion
By Stephen Mansfield, Johannes Schoeman
In August 2006 a technical alliance was formed between Orica Mining Services and Century Mine to provide blasting solutions. The alliance is in the form of a Rock to Specification (R2S™) service, one
Jan 1, 2010
-
Blast Site Security - International Society of Explosive Engineers 29th Annual Conference Safety Workshop February 5, 2003 Nashville, Tennessee
By Unknown
Blast Site Security Involves: * Clearing the area * Controlling Access * Warning Signals
Jan 1, 2003
-
Methods to Quantify Drilling Accuracy
By Tristan Worsey, Nathan Rouse, Kyle Hall
Drilling accuracy is the foundation to any successful blast operation. Even the best blasting practices cannot overcome poor drilling and still obtain desired results. Inaccuracies in boreholes can re
Jan 1, 2018
-
Generating Site Specific Custom Blast Designs with Modern Blast Monitoring Instrumentation Systems
The common approach of designing blasts on a trial and error basis is quickly coming to an end. When utilizing the full scale blast environment, trial and error can quickly become cost prohibitive and
Jan 1, 1991