    Proof of Bearing Capacity of Anchors on the Example of Innovative Anchor Monitoring System

    By Stephan Großwig, Karolina Nycz, Arne Kindler

    "Commonly used anchor monitoring systems are mainly based on the use of anchor force meters. However, experience shows that the reliability of the display of force meters lowers over time. Other measu

    Jan 1, 2017

  • DFI
    The "DSEI" Joint: A Destructible Diaphragm Wall Joint (Patented Process)

    By Christian Besson

    This article describes the implementation of a new jointing process for use between diaphragm wall panels. This process was initially introduced on the SOCATOP work site in uburban Paris (which involv

    Jan 1, 2002

  • DFI
    Behavior Of Large Bored Piles With Grouted End

    By Zhang Yaonian

    This paper describes full-scale tests on ten large bored piles with grouted end conducted for three projects in the urban area of Fuzhou city. Test program included site investigation, pile installati

    Jan 1, 2004

  • DFI
    Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:

    By Paul Morrison

    The paper describes the design process, trial testing and contract pile installation of 772 pre­cast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig

    Jan 1, 2000

  • DFI
    Geotechnical Investigation For Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California

    By Lawrence P. Goldfarb

    This paper presents the results of the geotechnical investigation for the repair of the Fashion Island Boulevard Bridge, Bridge No. 350160, in San Mateo, California. The concrete, precast girder bridg

    Jan 1, 1993

  • DFI
    Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure Sites

    By John P. Davis

    The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s

    Jan 1, 2006

  • DFI
    Pile Monitoring, Testing, And Data Processing: New Developments And Remaining Issues

    By Alain E. Holeyman

    After scoping out the objectives of this general report, the report reviews the three assigned main themes addressed by the papers submitted to the session: pile monitoring, testing, and data processi

    Jan 1, 2006

  • DFI
    Slope Stabilisation Of A Section Of The Thirlmere Aqueduct By The Use Of Spaced Micropiles And Permeation Grouting

    By David Preece

    The Thirlmere aqueduct was constructed over 110 years ago to provide water from the Lake District (in the north-west of England) to the city of Manchester some 60 miles (100 km) away. The aqueduct rem

    Jan 1, 2011

  • DFI
    Piles In Peat Under Artesian Pressure: A Case Study ? Synopsis

    By K. Y. C. Chung

    A case study on foundation engineering through organic soils is presented. Located along the west shore of the Hudson River, site soils consist of random brick fill over a thick layer of peat and orga

    Jan 1, 2010

  • DFI
    Dynamic Monitoring And Analysis Of Pile Foundation Installations ? Introduction

    By Patrick J. Hannigan

    The pile foundation designer typically performs a subsurface exploration program and static pile capacity calculations before selecting a pile foundation type, length, and capacity. During constructio

    Jan 1, 1990

  • DFI
    On The Effects Of Sand Grading On Driven Pile Performance

    Precast prestressed concrete piles designed to be end-bearing in a sand stratum at Drax Power Station met with extremely variable resistance during driving. Some piles came to virtual refusal almost i

    Jan 1, 1989

  • DFI
    Behavior Of Step Tapered Bored Piles In Sand Under Axial Loading

    By Nabil F. Ismael

    The axial capacity of step tapered bored piles in sand was examined by field tests at one site in Kuwait. Two straight piles, and two step tapered piles were load tested in compression to failure. Al

    Jan 1, 2008

  • DFI
    Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist

    By James P. Stewart

    This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une

    Jan 1, 2003

  • DFI
    Design Of Cooper River Bridge Foundations

    By Osama Safaqah

    The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town

    Jan 1, 2005

  • DFI
    Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - Synopsis

    By D. K. ] [Gupta

    The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and

    Jan 1, 1996

  • DFI
    Structure Support on Laterally Swept Piles

    By Morgan L. Race, Matthew R. Glisson

    "Most driven pile projects have plumbness limits from 0.25 in/ft (21 mm/m) to 0.5 in/ft (42 mm/m) to control bending stresses. For two projects, the project teams performed static load testing to eval

    Jan 1, 2017

  • DFI
    Increasing Lateral Pile Stiffness Through Limited Soil Improvement

    By Thomas J. Weaver

    Piles extending through soft soil near the ground surface will have a relatively low lateral stiffness. As a result, lateral serviceability limits may control the number of piles required for foundat

    Jan 1, 2006

  • DFI
    Sonic Integrity Testing - 1.0 Summary

    By A. F. van Weele

    In general cast-in place piles will have an irregular pile shape. However, it is possible that these irregularities are so large that they may lead to pile deficiencies. It is very rarely possible to

    Jan 1, 1987

  • DFI
    Project Specifc Design Criteria I-880 Reconstruction Project, Oakland, California

    By Steve Thoman

    After the 1989 Loma Prieta Earthquake, the California Department of Transportation (Caltrans) initiated an overview of the Caltrans Bridge Design Specifications (BDS) and bridge seismic design practic

    Jan 1, 1996

  • DFI
    Temporary Secant Wall For A Subway Rehabilitation Project In An Urban Environment

    By Vincent Tirolo

    Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre