Proof of Bearing Capacity of Anchors on the Example of Innovative Anchor Monitoring System
By Stephan Großwig, Karolina Nycz, Arne Kindler
"Commonly used anchor monitoring systems are mainly based on the use of anchor force meters. However, experience shows that the reliability of the display of force meters lowers over time. Other measu
Jan 1, 2017
-
The "DSEI" Joint: A Destructible Diaphragm Wall Joint (Patented Process)
By Christian Besson
This article describes the implementation of a new jointing process for use between diaphragm wall panels. This process was initially introduced on the SOCATOP work site in uburban Paris (which involv
Jan 1, 2002
-
Behavior Of Large Bored Piles With Grouted End
By Zhang Yaonian
This paper describes full-scale tests on ten large bored piles with grouted end conducted for three projects in the urban area of Fuzhou city. Test program included site investigation, pile installati
Jan 1, 2004
-
Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:
By Paul Morrison
The paper describes the design process, trial testing and contract pile installation of 772 precast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig
Jan 1, 2000
-
Geotechnical Investigation For Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California
By Lawrence P. Goldfarb
This paper presents the results of the geotechnical investigation for the repair of the Fashion Island Boulevard Bridge, Bridge No. 350160, in San Mateo, California. The concrete, precast girder bridg
Jan 1, 1993
-
Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure Sites
By John P. Davis
The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s
Jan 1, 2006
-
Pile Monitoring, Testing, And Data Processing: New Developments And Remaining Issues
By Alain E. Holeyman
After scoping out the objectives of this general report, the report reviews the three assigned main themes addressed by the papers submitted to the session: pile monitoring, testing, and data processi
Jan 1, 2006
-
Slope Stabilisation Of A Section Of The Thirlmere Aqueduct By The Use Of Spaced Micropiles And Permeation Grouting
By David Preece
The Thirlmere aqueduct was constructed over 110 years ago to provide water from the Lake District (in the north-west of England) to the city of Manchester some 60 miles (100 km) away. The aqueduct rem
Jan 1, 2011
-
Piles In Peat Under Artesian Pressure: A Case Study ? Synopsis
By K. Y. C. Chung
A case study on foundation engineering through organic soils is presented. Located along the west shore of the Hudson River, site soils consist of random brick fill over a thick layer of peat and orga
Jan 1, 2010
-
Dynamic Monitoring And Analysis Of Pile Foundation Installations ? Introduction
By Patrick J. Hannigan
The pile foundation designer typically performs a subsurface exploration program and static pile capacity calculations before selecting a pile foundation type, length, and capacity. During constructio
Jan 1, 1990
-
On The Effects Of Sand Grading On Driven Pile Performance
Precast prestressed concrete piles designed to be end-bearing in a sand stratum at Drax Power Station met with extremely variable resistance during driving. Some piles came to virtual refusal almost i
Jan 1, 1989
-
Behavior Of Step Tapered Bored Piles In Sand Under Axial Loading
By Nabil F. Ismael
The axial capacity of step tapered bored piles in sand was examined by field tests at one site in Kuwait. Two straight piles, and two step tapered piles were load tested in compression to failure. Al
Jan 1, 2008
-
Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist
By James P. Stewart
This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une
Jan 1, 2003
-
Design Of Cooper River Bridge Foundations
By Osama Safaqah
The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town
Jan 1, 2005
-
Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - Synopsis
By D. K. ] [Gupta
The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and
Jan 1, 1996
-
Structure Support on Laterally Swept Piles
By Morgan L. Race, Matthew R. Glisson
"Most driven pile projects have plumbness limits from 0.25 in/ft (21 mm/m) to 0.5 in/ft (42 mm/m) to control bending stresses. For two projects, the project teams performed static load testing to eval
Jan 1, 2017
-
Increasing Lateral Pile Stiffness Through Limited Soil Improvement
By Thomas J. Weaver
Piles extending through soft soil near the ground surface will have a relatively low lateral stiffness. As a result, lateral serviceability limits may control the number of piles required for foundat
Jan 1, 2006
-
Sonic Integrity Testing - 1.0 Summary
By A. F. van Weele
In general cast-in place piles will have an irregular pile shape. However, it is possible that these irregularities are so large that they may lead to pile deficiencies. It is very rarely possible to
Jan 1, 1987
-
Project Specifc Design Criteria I-880 Reconstruction Project, Oakland, California
By Steve Thoman
After the 1989 Loma Prieta Earthquake, the California Department of Transportation (Caltrans) initiated an overview of the Caltrans Bridge Design Specifications (BDS) and bridge seismic design practic
Jan 1, 1996
-
Temporary Secant Wall For A Subway Rehabilitation Project In An Urban Environment
By Vincent Tirolo
Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre
Jan 1, 2003