Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Residual Loads Measurements in Driven Steel H-Piles
By Reda M. Bakeer
"Measurements obtained during load testing of two steel H-piles driven at a site in Northeastern Mississippi are discussed. The general site conditions, equipment used, testing procedures and results
Jan 1, 2017
-
Experiences From The Italian High Speed Rail Network AV Construction
By Vincent Jue
In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.
Jan 1, 2010
-
Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - Synopsis
By Robert Jakiel
The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange
Jan 1, 2000
-
Case Study: MGM Casinonational Harbor, Washington, DC Displacement Cast-In-Place Piles in Coastal Plain Soils
By Karl A. H iggins, James P. Racine
"Displacement Cast-in-Place (DCIP) piles are not a common deep foundation type in the Washington, DC Metro Area market. As a result, less regional data is available for these foundations compared to o
Jan 1, 2017
-
Deep Foundation Shoring in South Florida
By Douglas C. Brunot
Mabey Inc. is providing for the shoring design for the Naples bay Center project, located in Naples, FL. The excavation is approximately 374' long by 164' wide and is 27'-8" deep at the shoring line w
Jan 1, 2018
-
Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary
By Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999
-
High Risk Control For Piling And Deep Foundations - A Systematic Approach
By Martin van Staveren
In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu
Jan 1, 2006
-
High Stress Pile Testing At Soldier Field
By Michael H. Wysockey
The load test program for the pile foundation at Soldier Field included static and dynamic load tests at four locations around the site. The dynamic tests were run with no knowledge of the static resu
Jan 1, 2002
-
Performance Of Non-Displacement And Displacement Piling, Adelaide Convention Centre, South Australia
By Felix Cheng
Extensions to the Convention Centre in Adelaide, South Australia consisted in part of construction over the existing railway system comprising nine rail lines and passenger platforms. Vibro-pile (Aust
Jan 1, 2002
-
Case History Of The Support Of Excavation System Used At The Atlantic Building Project In Washington, DC
By Joseph C. Gillen
This paper discusses the design, construction, and performance of the support of excavation system used at The Atlantic Building jobsite. The support of excavation system had to be adaptable to the d
Jan 1, 2006
-
Comparison of a and ß Methods with CPT and Pile Load Test Data: A Case Study with Attention on Soil Setup Effects
By Mohammadreza Khanmohammadi, Kazem Fakharian
"AbstractIn driven piles, the gradual dissipation of excess pore water pressure and consequently the soil setup significantly contribute to increasing the pile capacity with time. The question is rise
Jan 1, 2014
-
Instrumentation Of Construction Vibrations
By Mark R. Svinkin
Construction vibrations may adversely affect surrounding buildings and their effects range from human discomfort and disturbance of sensitive devices to visible structural damage. There is no unique c
Jan 1, 2002
-
The Pile Foundation Of Tall Buildings In Shenzhen
By Li Keqiang
This paper discusses the pile foundation of tall buildings in Shenzhen region. For 156 constructed tall buildings exceeding 18 storeys, about 86. 5 per cent of the sum. The two main types of foundatio
Jan 1, 1991
-
Applicability of Wet Grab Sampling to Quality Assurance of Deep Mixing Method
By Masaki Kitazume
"Abstract The wet type and dry type of deep mixing methods have been developed and widely applied for on-land and marine constructions in Japan. The quality assurance (QA) of the methods has been usua
Jan 1, 2014
-
-
Interpreted Residual Load In An Augered Cast-In-Place Pile
By Timothy C. Siegel
Accurate representation of the geotechnical resistance distribution is critical in evaluating the performance of piles and pile groups for design. A current practice is to infer the geotechnical resi
Jan 1, 2009
-
Appropriate Field Measurements For Testing Capacity-Prediction Methods For Piles Installed By Vibration - Introduction
By Michael W. Neill, O&apos
The engineering profession generally does not accept vibro-driven piles as bearing piles unless their capacities can be verified by restriking with an impact hammer, which significantly reduces the ec
Jan 1, 1989
-
Automated Installation Monitoring For Augercast And Driven Piles
By Garland Likins
Where soil conditions are favorable, augercast piles have significant economic advantages, but they also have some uncertainty due to the in construction methods. To confirm structural integrity, stat
Jan 1, 1999
-
Case Histories, Part 1 - Études De Cas, Partie 1 - Jet Grouting Underpinning Of A Building In The Us
By Gustavo E. Armijo
This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose
Jan 1, 2002
-
Use Of Controlled Modulus Columns In Retail & Industrial Development Projects
By Frederic Masse
With widespread acceptance in the market place, many engineers are choosing ground improvement techniques to provide suitable foundation subgrade at sites that would have traditionally required deep f
Jan 1, 2011