Steel Pile Foundations For Transmission Line Towers, As Used In Western Europe. - 1. Introduction.
By Alexander J. Verstraeten
The design and construction of foundations for power transmission line towers present some special problems. This paper describes a system of design and construction for these foundations that was dev
Jan 1, 1987
-
A Case Study Of Passive Piles Failure In Open Excavation
By S. T. Kok
This paper presents a case study in West Malaysia for passive piles failure in very soft marine clay in open excavation. In this particular case, the thickness of the very soft marine clay ranges from
Jan 1, 2009
-
Bearing Capacity Of Pile By Curve-Fitting Method ? Synopsis
By Z. Q. Zhou
It is the first worke in design of pile foundation to determine the carring capacity of single pile, and a static loading on site is considered to be the lost derect and reliable way. All values P and
Jan 1, 2010
-
An Innovative Approach To Load Testing Of High Capacity Piles
By P. Bermingham
A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma
Jan 1, 1989
-
Ground Water Control In The Urban Environment - Introduction
By Robert G. Lenz
Control of ground water for construction purposes is an everyday occurrence in the U.S. Thousands of pumps are in service at any given time. Most of these applications simply consist of pumping water
Jan 1, 1988
-
An Overview Of Soil Mixing In The United States ? Introduction
By Peter J. Nicholson
Since the reintroduction of soil mixing to the United States over 10 years ago, the work installed by soil mixing technology has grown dramatically. From an annual turnover of less than ten million do
Jan 1, 2001
-
PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History
By Chris D. Shewmaker
So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po
Jan 1, 2004
-
Drilled Piers In The Piedmont - Introduction
By Stanley A. Schwartz
In the Piedmont, heavily loaded structures are generally supported by either drilled piers or one of several pile types. The choice of drilled piers or piles is typically one of comparative costs. The
Jan 1, 1988
-
Micropiles Prove Advantageous Over Drilled Shafts For Merchants Railroad Bridge Rehabilitation
By Jeffrey R. Hill
To extend the life of the Merchants Railroad Bridge crossing the Mississippi River in St. Louis, MO, the owner implemented a rehabilitation and reconstruction project. The Merchants Bridge provides a
Jan 1, 2006
-
A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test Results
By Richard D. Short
The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field
Jan 1, 2000
-
Excavation Support At The Capitol Visitor Center In Washington DC
By Harald Ludwig
In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site
Jan 1, 2006
-
Easy Static Load Tests: Expert Results
By M. England
Test equipment has been developed to record automatically both the displacement of the pile head and the load applied during a conventional maintained load pile test. Some systems also have, in additi
Jan 1, 2002
-
Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? Introduction
By Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2003
-
2 Recent Technological Developments In Deep Foundations Without Soil Excavation - Recent Technological Developments In Deep Foundations Without Soil Excavation - Brief Review Of Papers To Session 2
By Bengt H. Fellenius
Session 2, Deep Foundation without Soil Excavation, has attracted no fewer than 22 papers dealing with subjects from soil improvement by grouting, injection, and deep mixing techniques through vibrofl
Jan 1, 1994
-
Wave Equation Analysis And Dynamic Monitoring - A Presentation At The Deep Foundations Institute?McGill University Symposium Montreal, September 1983
By Bengt Fellenius
The conventional wave equation analysis without control of the representativeness of the parameters to the actual conditions does not provide accurate results. However, the representatives can be vast
Jan 1, 1984
-
O Street Anchored Precast Lagging And Soldier Pile Retaining Wall
By John Wise
Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu
Jan 1, 2003
-
Design Of The Drilled Shaft Foundations For The Cooper River Bridge
By Liang Shen
The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South
Jan 1, 2013
-
Experiences With A New Type Of Displacement Screw Pile - Synopsis
By William Van Impe
A most renewing and promissing soil displacement screw pile is called the O-pile. The O-screw pile is a soil displacement auger pile based on a screwing in - screwing out procedure. The displacement a
Jan 1, 1996
-
Economic and Safe Design and the Execution Standards for the Construction Phase of Deep Foundation Systems in Difficult Soil Conditions
By Seffen Leppla, Rolf Katzenbach, Matthias Seip
"Abstract The economic and safe design of deep foundation systems in difficult soil conditions is based on a reduction of construction material used, construction time spent, energy consumed and a hig
Jan 1, 2014
-
Experiences With Deep Foundations In Shanghai - Synopsis
By Y. X. Tong
The simplicity off Ø=0 analysis has been taken advantage of to evaluate the geotechnical problems of open caissons, slurry trench walls and piles in Shanghai. Undrained shear strengths obtained by va
Jan 1, 2010