    Evaluating Bending Failure Of Floating Soil-cement (Sc) Columns Under Road Embankments Using 3d Fea

    By Sailesh S. Author

    The current design method for soil-cement (SC) columns improved soft clayey ground under the highway embankments assumes a slip circle failure surface shearing through the columns and the soils using

  • DFI
    The Galataport Project In Istanbul, Turkey. A Unique Case History In Geotechnical Engineering

    By Carlandrea Albonico, Salvatore Miranda

    After a brief introduction of the whole Project, the paper describes two special geotechnical engineering solutions provided within the scope of the Galataport Project, in Istanbul, Turkey. The first

    Nov 1, 2022

  • DFI
    Design and Construction of Nysted Offshore Wind Farm, Denmark

    By Jørn Thomsen, Christoffer Brodbaek

    "As governments increasingly accord high priority to sustainable energy, policymakers are finding that wind energy has a long track record as a proven alternative to conventional energy supply.Over th

    Jan 1, 2009

  • DFI
    Non-Destructive Testing Of Pile Foundations In India: Current Practices And Challenges

    By Heman Manchanda, Jyoti Agarwal

    Several infrastructure projects are under construction in India; many of them involves construction of deep foundations like reinforced concrete and steel piles to support super structures. As most of

    Sep 1, 2022

  • DFI
    Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry Practice

    By Martin D. Larisch, Ronald Damen

    The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre

    May 1, 2022

  • DFI
    Role Advanced Technology - Resolve Inherent Dichotomy In High Strain Dynamic Testing

    By Achyut Kumar Allady, Praveen Arumughan

    NCHRP Synthesis 418 (2011) entitled, “Developing Production Pile Driving Criteria from Test Pile Data” details the occurrence of dichotomy between pile Skin resistance and pile Tip resistance mobiliza

    May 1, 2022

  • DFI
    Determination of Basal Heave Stability for Strutted Excavations Supported with Jet Grout Base Slab

    By Anthony T. C. Goh

    "For deep excavations in soft clay, it is common to use jet grouting piles (JGP) prior to excavation to minimize wall deflections and ground settlement, and to prevent basal heave instability. In this

    Jan 1, 1900

  • DFI
    Re-Use Of Old Pile Foundations In Amsterdam

    By Remco Offenberg, Marcel Bielefeld, Martijn van Delft

    The question of the continued suitability of existing foundations arises when the function of the superstructure changes. This can occur when the superstructure is replaced or when the existing struct

    May 1, 2022

  • DFI
    Sonic Drilling and Sensitive Infrastructure

    By George Burnhart

    "Sonic drilling is a relatively new technology even though it has been in development since the late 1940s. It was initially funded by the U.S. petroleum industry and then, in the late 40s, Russian sc

    Jan 1, 2008

  • DFI
    Innovative Integrated Jet Grout And Contiguous Cfa Piled Solution For Complex Deep Shoring Wall In Soft Soils – Retaining Structural Design And Analysis

    By W. L. Chong, Y. Zou

    There are many types of Earth Retention Systems (ERS) available in the market where more than one method can be a feasible solution for a project. This paper examines the design and construct process

    Nov 1, 2022

  • DFI
    Cumulative Settlement Of Pile Group Under Cyclic High-Speed Train Loading

    By Pratik Goel, Sumanta Haldar

    High-speed rail is an emerging area of interest in India. The Government of India is implementing prestigious bullet train projects in various parts of the country. High-speed rail (HSR) will be opera

    Sep 1, 2022

  • DFI
    Noise Attenuation and Reduced Risk Associated With New Double- Walled Pile Technology

    By Julie H. N. Hampden, Per G. Reinhall

    "Executive summary: Impact pile driving of steel piles is a common construction practice in freshwater and marine environments for the building of structures and foundations. This practice produces ex

    Jan 1, 2017

  • DFI
    Application Of Deep Mixing And Stone Column Techniques For Stabilization Of Large Earth Cum Rock Fill (Ecrf) Dam For An Irrigation Project

    By Cemal Can Maslak, Vijaya Bhushan Rao, Vidyaranya Bandi, Karsten Beckhaus

    A Large Earth Cum Rock Fill, ECRF Dam is under construction at Polavaram in the state of Andhra Pradesh in India as part of an irrigation project. The Embankment crest width of the dam is 12.5m and ba

    Sep 1, 2022

  • DFI
    Innovative Earth Retention Project for a Parking Garage

    By Andreas Brandner, Karl Schoenherr-Strasse, I. B. Brandner, Dipl. Ing

    "A world famous Wintersport resort in the Alpine planned to build a parking garage for more than 600 cars and busses situated between a torrent, a district road and the village.A nearly 200 m long bui

    Jan 1, 2016

  • DFI
    King?s Cross Station Re-Development Passive And Active Mitigation Of Tunnelling - Induced Settlement

    By Clif Kettle

    The paper will detail the design and execution of passive and active settlement control measures, the means adopted to overcome the various physical and operational constraints, and to meet specified

    Jan 1, 2008

  • DFI
    Nearshore Pile Construction Experience In Burnie, Tasmania

    By Thomas W. Scott, Manh N. Tran

    Marine environments present a range of challenges for pile construction. This paper contains a discussion on the design and construction of marine piles for a recent Toll Shipping wharf upgrade in Bur

    Nov 1, 2022

  • DFI
    Mooring Bridge Caissons During Construction Using Jetted-In Driven Plate Anchors

    By Osama A. Safaqah

    Driven plate anchors can be used to hold in place large bridge caissons during floating construction. Their small size and simple method of installation make them a very cost effective alternative to

    Jan 1, 2013

  • DFI
    Acrylamide Grouting: Successfully Controlling Groundwater from Canada to South America

    By Daniel Magill, Jim Gentry

    "Acrylamide chemical grout (C3H2NO) has been successfully used for over 50 years to control groundwater and stop infiltration. This paper will address three unique projects involving the control of gr

    Jan 1, 2017

  • DFI
    The Potential Impacts Of Questionable Instrumenation Data

    By Giovanni A. Bonita, Asher H. Peltz, Sean D. Johnson

    This paper examines a complex earthwork project in the Washington DC metro area that had project delivery directly impacted by questionable instrumentation monitoring data. The case study summarizes t

  • DFI
    Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KY

    By Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba

    "Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in

    Jan 1, 2015