    Review Of Major Developments In Ground Engineering Over The Last 20 Years And Current Trends

    By David Sherwood

    The paper has been prepared as the basis for the 2008 John Mitchell Memorial Lecture. It reviews major developments in ground engineering over the last 20 years, not from the point of view of technic

    Jan 1, 2008

  • DFI
    Design of Pile Foundation for Tall Railway Bridges in North-East India

    By Sumantra Sengupta

    "Northeast Frontier Railway (NF Railway) intends to connect Imphal, the capital of Manipur (bordering Myanmar) with Assam by railway link. They have planned a 125km long railway line that passes throu

    Jan 1, 2015

  • DFI
    Harry Nice Bridge Geotechnical Instrumentation Case Study

    By Jeffrey Goodwin P. E., Melih Demirkan Ph. D. P. E., Kevin Tehansky P. E.

    Just an hour drive down MD 301 from National Harbor, construction to replace the Governor Harry W. Nice Memorial/Senator Thomas ‘Mac’ Middleton Bridge (HNB) began in spring of 2020. The Maryland Trans

    Oct 1, 2022

  • DFI
    ACIP Pile Performance and Installation in the Northeastern United States

    By Jr NeSmith

    "Augered-cast-in-place (ACIP) pile installation technology has matured extensively since the first auger, pressure grouted pile was patented in 1959. The current technology allows for successful pile

    Jan 1, 2016

  • DFI
    Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific Ocean

    By Ihab Allam PE, Meeok Kim. PE. Ph. D

    The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa

  • DFI
    Willow Island Hydroelectric Project: Taming the Ohio River to Create Green Energy

    By James M. Tantalla, Jr. Ellman

    "Construction of the powerhouse for the Willow Island Hydroelectric Project, located at the Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular coff

    Jan 1, 2016

  • DFI
    New Technique To Drive Piles By Impact Hammer Inside The Pile - Synopsis

    By Djk Arentsen

    A new technique to drive tubular piles by impact hammer inside the pile has confirmed a dramatic reduction of noise and the opportunity to save steel. Also a reduction in driving time and a higher bea

    Jan 1, 1996

  • DFI
    Performance Monitoring of Mixed Ground Working Platform for a CCR Surface Impoundment

    By Ali Ebrahimi, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, Roneet Das, William Tanner, Amir Ahmadipur

    There are safety concerns related to operation of heavy equipment over coal combustion residual (CCR) impoundments during construction of the impoundment closure programs. As part of a pilot study pri

    Jan 1, 2019

  • DFI
    Drilled Pier Foundation In Hard Carbonate Rock ? Synopsis

    By K. E. Darnell

    Drilled pier foundations have long been a favored foundation type for heavily loaded structures. Drilled piers derive their load-bearing capacity from end-bearing, and/or sidewall friction. This type

    Jan 1, 2010

  • DFI
    Using Seismic Tomography To Evaluate Foundation Structures

    By Ed Kase

    Cross-hole sonic logging (CSL) has become the universal standard, nondestructive testing (NDT) method used in evaluating the integrity of foundation structures to maintain quality assurance and qualit

    Jan 1, 2003

  • DFI
    Philadelphia Dock Story—Pile Challenges at Delaware River (06bf9951-abf5-4656-aab7-81fa955662d4)

    By Craig H. Olson

    "Anew ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at t

    Jan 1, 2008

  • DFI
    Top-Loaded Bi-Directional Test and the Conventional Bi-Directional Load Test, a Direct Comparison

    By Patrick J. Hannigan, Seth Robertson, Frank Rausche, Rozbeh B. Moghaddam

    The Top-Loaded Bi-Directional Test (“TLBT”) and the conventional Bi-Directional Load Test (“BDLT”) are full-scale load tests where loads are applied bi-directionally to the foundation element. The BDL

    Sep 8, 2021

  • DFI
    Philadelphia Dock Story—Pile Challenges at Delaware River

    By Craig H. Olson

    "A new ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at

    Jan 1, 2008

  • DFI
    Replacing Top Layer Of Soft Clay With Compacted Engineering Fill To Improve The Lateral Capacity Of Piles

    By Venugopal Bonani, Kumaran M., Thomas John

    Liquid storage tanks are usually located in nearshore or coastal regions with soil profiles containing thick layers of compressible soils. These storage tanks are usually of large diameter up to 90m a

    Sep 1, 2022

  • DFI
    Embodied Carbon Assessment For A Multi-Phased Development Pile Testing Strategy

    By Jack Taggart, Chris Barker

    Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor

    May 1, 2022

  • DFI
    One Seam At A Time: Interactive Quality Assurance To Identify Coal Seams During Foundation Construction

    By Matthew Runion, Christopher Lawler

    The Aeolus – Jim Bridger Transmission Line Project is located in southern Wyoming, home to some of the largest coal seams in the world. Coal seams present unique challenges to underground construction

  • DFI
    Artificial Ground Freezing: A Smart Application Below The Airport Of Perth

    By Luca Pingue, Regine Jagow-Klaff, Franco Muratore, Carlandrea Albonico, Damiano Frontini, Rudolf Wernecké

    This paper describes an artificial ground freezing (AGF) application carried out to ensure both watertightness and structural support for the safe excavation of four cross passages of the Forrestfield

    May 1, 2022

  • DFI
    Quality Assessment of Seismic Data Sets and the Impact on Interval Velocity Estimates in DST

    By Gerald Verbeek, Erick Baziw

    "Downhole Seismic Testing (DST) is an important geotechnical testing technique for site characterization as it provides low strain (<10-5) in-situ interval compression (Vp) and shear (Vs) wave velocit

    Jan 1, 2017

  • DFI
    A Digital Twin For Deep Vibro Ground Improvement

    By Negin Khalili-Motlagh-Kasmaei, Paul O'Leary, Christopher J. Rothsiedl, Dimitar Ninesvski, Alexander Zöhrer, Vincent Winter

    This paper presents the implementation of a digital twin for the vibro-replacement ground improvement process, as part of a digital construction site. The goal is to implement an evidence-based qualit

    May 1, 2022

  • DFI
    Charleroi Locks: Repair Methods to Restore Structural Integrity of Large-Diameter Drilled Shafts

    By Alexandre Alex) J. Bredikhin

    "DISCLAIMER: the statements presented herein are those of the author and do not necessarily represent the views of US DoD or its Components.ABSTRACTProgress on the $750M lock project on the Monongahel

    Jan 1, 2017