Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Deep Cut-Off at the Walter F. George Dam"TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow
Jan 1, 2014
-
Ground Freezing In Urban Areas And Under Special ConditionsBy Frank Haehnig
Ground freezing is a technique which is used more and more in tunnelling under complex ground conditions. This paper will present three case studies which highlight different aspects of the ground
Jan 1, 2008
-
Ralston Dam Spillway Stability Over Pierre ShaleBy Gokhan Inci
Stability problems with dam spillways on existing landslides and appropriate mitigation measures to remedy them are ongoing concerns for geotechnical engineers. The first successful application of dri
Jan 1, 2007
-
Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? SynopsisBy Y. Z. Wang
Zhengzhou Yellow River Highway Bridge, which is under construction, has a total length of 5550 meters with bored cast-in-place concrete piles as the foundations of its piers which have a diameter of 2
Jan 1, 2010
-
Session 30 "Grouting for Tunnels 2"By Raymond Henn
Yes we have also used some however, again because of the nature of the maintenance window where we have that two hour (at best) window every night and due to the numerous other crews that are wanting
Feb 10, 2003
-
Dynamic Load Testing Of Augered Cast-In-Place PilesBy Garland Likins
High strain PDA testing has become common for verification of capacity of both driven and bored piles. It is equally applicable to Augered-Cast-in-Place (ACIP) Piles. It also evaluates other aspects o
Jan 1, 2000
-
New I-95 Woodrow Wilson Bridge FoundationsBy Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2009
-
Instrumented Static Load Testing-Auger Cast-In-Place Piles - Introduction And PurposeBy Michael T. Lambert
The purpose of the this paper is to demonstrate the benefits of using additional instrumentation during load tests of auger-cast-in-place piles. Traditionally, only load and butt displacement are dete
Jan 1, 2000
-
Jet Grouted Foundation for 57-Story TowerBy Robert Alperstein, Nidal AbiSaab, Joe Pastore
"This paper describes the design and construction aspects of the foundation support for a 57-story building currently under construction in lower Manhattan. The site is located near the East River wit
Jan 1, 2016
-
The Use Of Spin Fin® Piles In MassachusettsBy Les R. Chernauskas
Driven pipe piles are commonly used for near and offshore structures due to their omni-directional bending resistance, large surface area, and ease of installation. However, these piles typically cann
Jan 1, 2011
-
Urban High Capacity Deep Foundation Solutions in Sites with Complex History and GeologyBy Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith
New York City is an urban environment with a history spanning over 200 years. The coastline of New York has changed over the years. In the East River, old bulkhead and remnant of relieving platforms t
Jan 1, 2019
-
Mediation Of Construction Disputes - An Advanced Preparation Guide For Mediation Of The Complex Construction Case - IntroductionBy Alan Alhadeff
Why is mediation being hailed as the wave of the future? The high cost of putting on a trial, over-crowded court calendars and long trial delays have resulted in what prominent attorneys and leadi
Jan 1, 1990
-
Stabilizing A 100 Ft Rock Slope With Limited Access And Tight Construction Tolerances Using Observational Method And Real-time 3d ModelingBy Travis A. Shoemaker, Mitchell S. Youmans, Nancy T. Chin, Michael S. Senior
A geologic assessment and stability analysis of the right abutment of Boundary Hydroelectric Dam in Pend Oreille County, Washington was completed in May 2017. The stability analyses identified a poten
-
A Review On Pedestal PilesBy Venkatesh S. V J, Shubha M, Srilakshmi G
Choosing for the best option of pile foundations to overcome large lateral and uplift loads for the foundations in transmission line towers/offshore environment is still being a concern to achieve the
Sep 1, 2022
-
Interpretation and Evaluation of Thermal Integrity Profiling MeasurementsBy Seth Robertson, Daniel Belardo, Travis Coleman
Thermal Integrity Profiling (TIP) is a non-destructive method used to evaluate drilled deep foundation integrity. This integrity testing method is specified more frequently, and is becoming an indust
Sep 8, 2021
-
Capitol Complex Phase 1 ExpansionBy Eric S. Lindquist, Charles A. Luxford
The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par
-
Behavior of Settlement Reducing Piles under Static and Seismic LoadingsBy Marwa Nabil, Alaa A. Ata
"Recent developments in the analysis of piled rafts has incorporated the load sharing of the raft and the piles to support the superstructure. In the piled-raft system, piles are cast monolithically w
Jan 1, 2016
-
Monopile Construction Technique For Mumbai Coastal Road Package 1 - MumbaiBy T Vijayakumar, Vipul Dobhada, Rajesh Patel, Swarnadip Dey, Naveen Babu D
The most challenging scope of any bridge project in marine or inter tidal zone is to construct sub structure like well Foundation, group pile, pile cap etc. Similarly, it also affects the marine envir
Sep 1, 2022
-
Transformation From Classical 2D To Digital 3D Thinking Process In The Design Of Geotechnical Structures: Perspective Of A Geotechnical ConsultantBy Harald Vogel, Johannes Lachenski, Friedemann Koetzel, Sebastian Schnell
In this paper, a digital subsoil approach, a work-in-progress, will be presented describing the transformation from a classical 2D to digital 3D thinking process in the design of geotechnical structur
May 1, 2022
-
Underwater Concrete In Drilled Shafts: The Key Issues And Case HistoriesBy Sam X. Yao
In construction of drilled shafts under water, placing concrete in the shafts is technically demanding and involves complex construction logistics. Past construction experience has demonstrated that h
Jan 1, 2013