    The Deep Cut-Off at the Walter F. George Dam

    "TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow

    Jan 1, 2014

  • DFI
    Ground Freezing In Urban Areas And Under Special Conditions

    By Frank Haehnig

    Ground freezing is a technique which is used more and more in tunnelling under complex ground conditions. This paper will present three case studies which highlight different aspects of the ground

    Jan 1, 2008

  • DFI
    Ralston Dam Spillway Stability Over Pierre Shale

    By Gokhan Inci

    Stability problems with dam spillways on existing landslides and appropriate mitigation measures to remedy them are ongoing concerns for geotechnical engineers. The first successful application of dri

    Jan 1, 2007

  • DFI
    Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? Synopsis

    By Y. Z. Wang

    Zhengzhou Yellow River Highway Bridge, which is under construction, has a total length of 5550 meters with bored cast-in-place concrete piles as the foundations of its piers which have a diameter of 2

    Jan 1, 2010

  • DFI
    Session 30 "Grouting for Tunnels 2"

    By Raymond Henn

    Yes we have also used some however, again because of the nature of the maintenance window where we have that two hour (at best) window every night and due to the numerous other crews that are wanting

    Feb 10, 2003

  • DFI
    Dynamic Load Testing Of Augered Cast-In-Place Piles

    By Garland Likins

    High strain PDA testing has become common for verification of capacity of both driven and bored piles. It is equally applicable to Augered-Cast-in-Place (ACIP) Piles. It also evaluates other aspects o

    Jan 1, 2000

  • DFI
    New I-95 Woodrow Wilson Bridge Foundations

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2009

  • DFI
    Instrumented Static Load Testing-Auger Cast-In-Place Piles - Introduction And Purpose

    By Michael T. Lambert

    The purpose of the this paper is to demonstrate the benefits of using additional instrumentation during load tests of auger-cast-in-place piles. Traditionally, only load and butt displacement are dete

    Jan 1, 2000

  • DFI
    Jet Grouted Foundation for 57-Story Tower

    By Robert Alperstein, Nidal AbiSaab, Joe Pastore

    "This paper describes the design and construction aspects of the foundation support for a 57-story building currently under construction in lower Manhattan. The site is located near the East River wit

    Jan 1, 2016

  • DFI
    The Use Of Spin Fin® Piles In Massachusetts

    By Les R. Chernauskas

    Driven pipe piles are commonly used for near and offshore structures due to their omni-directional bending resistance, large surface area, and ease of installation. However, these piles typically cann

    Jan 1, 2011

  • DFI
    Urban High Capacity Deep Foundation Solutions in Sites with Complex History and Geology

    By Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith

    New York City is an urban environment with a history spanning over 200 years. The coastline of New York has changed over the years. In the East River, old bulkhead and remnant of relieving platforms t

    Jan 1, 2019

  • DFI
    Mediation Of Construction Disputes - An Advanced Preparation Guide For Mediation Of The Complex Construction Case - Introduction

    By Alan Alhadeff

    Why is mediation being hailed as the wave of the future? The high cost of putting on a trial, over-crowded court calendars and long trial delays have resulted in what prominent attorneys and leadi

    Jan 1, 1990

  • DFI
    Stabilizing A 100 Ft Rock Slope With Limited Access And Tight Construction Tolerances Using Observational Method And Real-time 3d Modeling

    By Travis A. Shoemaker, Mitchell S. Youmans, Nancy T. Chin, Michael S. Senior

    A geologic assessment and stability analysis of the right abutment of Boundary Hydroelectric Dam in Pend Oreille County, Washington was completed in May 2017. The stability analyses identified a poten

  • DFI
    A Review On Pedestal Piles

    By Venkatesh S. V J, Shubha M, Srilakshmi G

    Choosing for the best option of pile foundations to overcome large lateral and uplift loads for the foundations in transmission line towers/offshore environment is still being a concern to achieve the

    Sep 1, 2022

  • DFI
    Interpretation and Evaluation of Thermal Integrity Profiling Measurements

    By Seth Robertson, Daniel Belardo, Travis Coleman

    Thermal Integrity Profiling (TIP) is a non-destructive method used to evaluate drilled deep foundation integrity. This integrity testing method is specified more frequently, and is becoming an indust

    Sep 8, 2021

  • DFI
    Capitol Complex Phase 1 Expansion

    By Eric S. Lindquist, Charles A. Luxford

    The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par

  • DFI
    Behavior of Settlement Reducing Piles under Static and Seismic Loadings

    By Marwa Nabil, Alaa A. Ata

    "Recent developments in the analysis of piled rafts has incorporated the load sharing of the raft and the piles to support the superstructure. In the piled-raft system, piles are cast monolithically w

    Jan 1, 2016

  • DFI
    Monopile Construction Technique For Mumbai Coastal Road Package 1 - Mumbai

    By T Vijayakumar, Vipul Dobhada, Rajesh Patel, Swarnadip Dey, Naveen Babu D

    The most challenging scope of any bridge project in marine or inter tidal zone is to construct sub structure like well Foundation, group pile, pile cap etc. Similarly, it also affects the marine envir

    Sep 1, 2022

  • DFI
    Transformation From Classical 2D To Digital 3D Thinking Process In The Design Of Geotechnical Structures: Perspective Of A Geotechnical Consultant

    By Harald Vogel, Johannes Lachenski, Friedemann Koetzel, Sebastian Schnell

    In this paper, a digital subsoil approach, a work-in-progress, will be presented describing the transformation from a classical 2D to digital 3D thinking process in the design of geotechnical structur

    May 1, 2022

  • DFI
    Underwater Concrete In Drilled Shafts: The Key Issues And Case Histories

    By Sam X. Yao

    In construction of drilled shafts under water, placing concrete in the shafts is technically demanding and involves complex construction logistics. Past construction experience has demonstrated that h