Development of a Two-Stage Middlings Circuit at Inco's Clarabelle Mill PART 2: On-Site Pilot plant Testwork and Full Plant ImplementationBy A. Bouchard
"Based on laboratory testwork, a two-stage cleaner / re-cleaner circuit with feed regrind was proposed to replace an existing single-stage middling circuit treating a scavenger concentrate at Inco’s C
Jan 1, 2001
-
Application of Continuous Improvement, 5S and Standard Work in an Underground Mining EnvironmentBy G. Molloy
The purpose of this paper is to demonstrate the value of applying continuous improvement, in particular 5S and standard work, in an underground environment. 5S and standard work are two aspects of Lea
Aug 1, 2013
-
Friction bolt anchored wire rope for rock support in burst-prone groundBy P. K. Kaiser, D. D. Tannant
"A support system for large ground convergence conditions or burst-prone ground must contain holding elements (rockbolts, cable bolts, etc.) that are strong yet capable of sustaining large deformation
Jan 1, 1995
-
Some notes on the Mining Law of Manitoba, and on the Mines Act of 1930By H. F. Maulson
For the benefit of those who are not familiar with the history of the western Provinces-Manitoba, Saskatchewan, and Alberta-as regards our natural resources, a few words of explanation may be in order
Jan 1, 1930
-
Canada Fluorspar (NL) Inc. St. Lawrence Fluorspar Project – Project DescriptionBy M. A. Stogran-Baker, S. Cole
"Fluorspar mining occurred in the St. Lawrence area from the 1930s until the mid 1980s. In 2013, CFI discovered a new ore body, the AGS vein, which proved amenable to more economic open pit mining met
Jan 1, 2018
-
Rehabilitation of the Sydney Steel CorporationBy D. W. R. Haysom
"I AM CONSCIOUS of the honour you pay me by having invited me to address you on the subject of the Rehabilitation of the Sydney Steel Corporation. The true architect of the revival and rehabilitation
Jan 1, 1972
-
Steam Genera ting and Power Plants, Company, Nova Scotia Light LimitedBy A. R. Harrington
BEFORE discussing some of the technical aspects of the steam generating plants of Nova Scotia Light and Power Company, Limited, it might be of interest to go back through history and see the developme
Jan 1, 1958
-
The Bulk Terminal in Today's Traffic PatternBy T. G. Phillips
"This paper gives an inside look at a bulk terminal and describes the preparations that must be made by a company in developing such a terminal and its position in today's traffic pattern. The followi
Jan 1, 1968
-
The Ecstall Story: The Transition from Pit to UndergroundBy Peter N. Blakey, Jean-Paul Paquette, Barton A. Thomson
"FROM THE BEGINNING OF THE PIT, it was known that the surface mining method had a projected life of about ten years, and that the ore extended to depths recoverable only by underground mining. When se
Jan 1, 1974
-
A study of blasthole drilling accuracy: Monitoring instrumentation and practiceBy F. Boudreault, C. Hendricks, M. Scobie
Drilling accuracy represents an important quality control factor in minimizing dilution. Apart from geology, the factors governing drilling accuracy are largely within the control of the mine. Setup l
Jan 1, 1994
-
Geology of the Brazeau AreaBy J. O. G. Sanderson
THE Brazeau river is a relatively short foothills stream in western Alberta and its drainage area is limited to approximately 2,400 square miles. It rises near the head of the North Saskatchewan river
Jan 1, 1939
-
Mining In Space; Technology Transfer: Examples and ApplicationsElectric Vehicle Controllers Ltd. ?EVC started in 1981 ?Underground electric locomotive drive systems ?Developed tandem load sharing system and radio ELOS controls ?Locomotive autonomy systems
May 1, 2009
-
Iron Bleed in the Maboumine ProcessBy Philippe Ribagnac, Bruno Courtaud, Jean-Marie Lambert, Valérie Weigel
Mabounié is a polymetallic deposit in Gabon containing niobium (1.2 wt.%), tantalum (0.03 wt.%), rare earth elements (REE) (1.4 wt.%) and uranium (0.03 wt.%) that are mostly carried by pyrochlore mine
Jan 1, 2016
-
Penasquito Project ?Achieving Success in Challenging TimesCHALLENGES TO SCHEDULE/BUDGET Shortage of people (contractors, vendor support, engineering, staff) 2007 projects off the shelf Increase in metals prices Shortage of large tires Reserve increase
May 1, 2010
-
Two-Stage Treatment of High Arsenic Synthetic Mine Water at Cold TemperatureBy A. L. Mackie
Arsenic is a highly toxic element and a known human carcinogen. It is often a contaminant in mine water discharges, particularly from gold mining and roasting operations, and has been found at concent
Aug 1, 2013
-
Potassium-Argon Ages of Some Ore Deposits in British ColumbiaBy N. C. Carter, Wm. H. White, J. E. Harakal
"Of twenty-one ore deposits in British Columbia which are either in production or advanced stages of exploration, five have potassium-argon ages in a range of 165-205 m.y., eight are in a range of 44-
Jan 1, 1968
-
Quantitative Modeling of a Neutralization and Co-Precipitation Process with Ferrihydite for the Simultaneous Removal of As (V) and Hg(II)By S. Hobo, M. Yagisawa, T. Uchida, C. Tokoro, T. Kato
In this study, quantitative modeling was carried out for the treatment of simulated waste water containing As(V), Zn(II) and Hg(II) as toxic elements, and Fe(III), Na(I) and sulfate as coaxing ions. T
Jan 1, 2016
-
A Year of GPS at Fording Coal Limited, Greenhills operationsBy Robin Sheremeta
Fording Greenhills first acquired GPS (Global Positioning System) technology with the commissioning of a GPS-based dispatch system in December 1994. The second exposure to satellite technology came wi
Jan 1, 1996
-
Conventional Shaft Sinking Unconstrained by Equipment AvailabilityBy S. W. Henley
"Shaft sinking design is typically driven by what has been successful in the past and the availability of sinking plant. This document considers a project where the sinking design and methodology is u
Jan 1, 2019
-
Larger Tonnages, Larger Crushers?By Ian Orford, Ken L. Boyd
"Can the ever-increasing tonnages of ore and waste being mined today be accommodated simply by using bigger and better crushers? This paper updates the principal author’s earlier publication, “Crushin