Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Fuzzy Model of a Multigrade Structure for Support of Decision-Making and Management in Mineral ProcessingBy M J. Pejovic, I Miljanovic, A Milutinovic4, T Benovic, A Petrovski
The paper presents a model of a multigrade monitoring-management structure for support to decision making and management in real and extended time in mineral processing (MP). The model was created as
Sep 26, 2011
-
Mamatic Evolution and Exhalative Ores: Evidence from the SW PacificThe earliest suggestions that some metallic ore deposits might have resulted from seafloor volcanic exhalation seem to have been those of Elie de Beaumont in 1847 and Henry de la Beche in 1851. In
Jan 1, 1987
-
A Logical Approach to Determination of Density and Porosity Values for Iron Ore DepositsThe importance of the accurate determination and interpretation of the bulk density and porosity of a given iron ore deposit is very often disregarded or neglected. Large amounts of time and money are
Jan 1, 2007
-
Simulation Aided Engineering – Integration of Monitoring, Modelling and PlanningBy D Beck
Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o
Mar 21, 2011
-
The Social Licence to Operate and Drivers for Change – Resource Reporting and Mine Material CharacterisationBy J Heyes, G A. Maddocks, R J. Stewart, G D. Corder
Mining is an international business and vital contributor to national and global economies. It depends on the trust and confidence of investors and stakeholders for its financial and operational well-
Jun 28, 2016
-
Environmental Performance of Large Open Pits in Western Australia - A PerspectiveBy Lindbeck K
The mining industry in Western Australia is a large sector of the WA economy providing $12 billion (1993) of the export income for the State. Historically, mining in WA developed from traditional pr
Jan 1, 1994
-
Removing some Subjectivity from Traditional BS 848 and ISO 5802 In Situ Fan Flow TestsTraditional in situ fan flow test methods under accepted standards require determinations to be made of both static pressures and total pressures during testing. This is to determine the resultant vel
Jul 1, 2013
-
Infrastructure Development for the Ulan ProjectExtensive infrastructure construction works were required for the development of the underground and open-cut coal mine at Ulan to a production capacity of 5 million tonnes of steaming coal per an
Jan 1, 1983
-
Injection of Coal-Oil Mixture into Blast FurnaceBy Tamura S, Maekawa M, Nagai C, Deguchi M
Heavy fuel oil has been injected into blast furnaces in order to reduce the coke rate, to improve productivity and to control the furnace heat condition. However, in the first oil crisis at the en
Jan 1, 1981
-
Characterisation of mineral flotation along industrial circuits using mineralogical analysisBy J Cortinez, P Vallejos, J Yianatos, M Rodriguez
Nowadays, one of the main problems in current flotation plants and new projects is the significant decrease in feed grades and changes in the mineral composition, which has an important effect on the
Aug 24, 2022
-
The Application of Automated Samplers in Copper/Nickel ProcessingBy J E. Powalisz
"The application of automated sampling techniques can help to provide a representative sample of process fluids and slurries that provide data for controlling process, custody transfer and quality ass
Jul 29, 2014
-
Improving Safety and Production – The Transition to Electronic Detonators at George Fisher MineBy M Breen
In 2009, George Fisher mine began to seriously consider the transition from pyrotechnic detonators to electronic detonators. Initially, the electronic detonators were used for complex crown shots or a
Nov 8, 2011
-
Design of Copper-Cobalt Hydrometallurgical CircuitsCopper-Cobalt hydrometallurgy has seen a resurgence in recent years with the development of projects in Zambia and the DRC. Many of the flow sheets are unique in their use of hydrometallurgical techni
Jan 1, 2008
-
Computerised in Project ManagementWith the advent of the mini computer and the relational database project management has experienced a new lease of life. The project manager no longer has to wait days for his reports, and he doesn
Jan 1, 1983
-
Landforms And Revegetation After Mineral Sand MiningBy Lewis J. W
The mineral sand orebodies of the east coast of Australia occupy approximately three per cent of the dune-heath-wetland coastal environment. They are associated with coastal plant communities rangi
Jan 1, 1976
-
Development of the Hawsons Low-Grade MagnetiteBy R L. Koenig
The rediscovery and recognition of the magnetite potential of the iron mineralisation at the Hawsons Project area 60 km south of Broken Hill has the potential for the development of a new series of ma
Jul 11, 2011
-
Control and Monitoring of International Organization for Standardization Compliance for Industrial Sampling SystemsBy R Shaw, T T. Neidel, C Adams
Sampling equipment manufacturers endeavour to ensure that the mechanical equipment installed in sampling systems are designed and manufactured to adhere to the requirements of the International Organi
Jul 29, 2014
-
Decarburisation of Steel by Directly Reduced Ore Under Controlled AtmospheresAn examination has been made of the rate and extent of removal of carbon from scrap metal charges when the melt is exposed to atmospheres which are reducing or oxidising with respect to FeO at uni
Jan 1, 1984
-
Management' as Presented to Engineering StudentsCurrently all engineering schools face a common problem, an ever expanding technological base which must be presented to students within a fixed time period. Traditionally the programmes of study
Jan 1, 1980
-
Melbourne Main Sewer Project – Construction Phase – Soft Ground Tunnelling in the Yarra DeltaBy P Clark
This paper discusses the challenges, solutions and lessons learnt as tunnelling work continues on the Melbourne Main Sewer Replacement (MMSR) project.The MMSR project is a $220 million dollar project
Mar 8, 2011