Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Current Trends In Explosives Use

    By Smith I. T

    Mine operators have long recognised that the results achieved in primary blasting are critical to subsequent mining activities. With the introduction of "in the hole" drills under- ground and the ad

    Jan 1, 1977

  • AUSIMM
    Underground Downhole Geophysics at CSA Mine, Cobar

    By Erickson M. E, Smith C. K, Carswell J. T

    Thirteen holes totalling 3200m were surveyed using a downhole time domain Geonics EM37 system at the 830 metre level within the CSA Mine, Cobar, New South Wales, in order to search for blind, electric

    Jan 1, 1990

  • AUSIMM
    History and Present Operation of the Heavy Medium Separation Plant at Renison Limited, Tasmania

    In 1972, metallurgical testwork on Renison ore indicated a significant proportion of low specific gravity, tin-barren material ideally suited to heavy medium separation (HMS). Further technical an

    Jan 1, 1978

  • AUSIMM
    Review of Shear Strength Results - Western Australian Gold Mines

    Shear strength testing of rock discontinuity surfaces has been undertaken at a considerable number of open pit gold mining operations in Western Australia, as part of geotechnical studies of pit wall

    Jan 1, 1992

  • AUSIMM
    Blast Vibration Control and Assessment Techniques

    By Moore A. J, Evans R

    Blast vibration control and assessment techniques have been developed which supplement traditional charge mass scaling methods. The improved techniques, which can be used to predict air and ground v

    Jan 1, 1994

  • AUSIMM
    Mining Subsidence of an Urban Area in Ipswich, Queensland

    By Wardle L, Wright G

    This paper describes the investigations and results of monitoring of deformations of houses located within the area of influence of a pillar collapse over the Westfalen No. 3 coal mine near Ipswich

    Jan 1, 1992

  • AUSIMM
    Traceability of native seed for mine rehabilitation

    By A Grant, H Thomas, C Clarke, B Fuller

    Native seed and plants are often a core input into the rehabilitation process of mine closure. Native plant establishment rate and performance is a function of many input elements including seed quali

    Aug 2, 2023

  • AUSIMM
    Process mineralogy of Tarkwaian paleo placer gold deposit in Ghana

    By E A. Agorhom, M Beyuo, C Owusu, I Quaicoe

    Understanding the mineralogy and liberation of gold particles in an ore is key to the development and optimisation of gold processing operations, being cyanidation or gravity separation. This can be a

    Aug 24, 2022

  • AUSIMM
    An Underground Air Blast - Codelco Chile - Division Salvador

    By M Fishwick Tapia

    This paper was prepared and translated from the final report of the investigation into the Codelco Chile Salvador DivisionÆs air blast which occurred in the Inca-West area. In this section of the bloc

    Jan 1, 2000

  • AUSIMM
    The application of critical chain project management to sublevel open stoping at Olympic Dam

    By J Light

    Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t

    Mar 29, 2023

  • AUSIMM
    Potential and Applications of Underground In Situ Bioleaching

    By R Schlueter, H Mischo

    The mining industry is facing a variety of geological, technological and social challenges. Future deposits show a general tendency towards increasing depth with complex ores and decreasing grades. On

    Nov 4, 2015

  • AUSIMM
    Ventilation Upgrade at the FrogÆs Leg Mine - Case Study

    By A Llewellyn, M Varvari

    The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.

    Jul 1, 2013

  • AUSIMM
    Influence of Cognitive Biases on Project Evaluation

    By S Love, M Anderson, M Boland

    "The high rate of failure of new mine developments to meet feasibility study expectations has been the subject of many fine technical papers. Yet failure rates remain stubbornly high.Similarly, the co

    Mar 8, 2016

  • AUSIMM
    Selection Sizing and Developing the Optimum Gravity Gold Circuit for Your Project

    Gravity gold recovery has been practiced for thousands of years, making it one of the oldest forms of mineral processing. Gold is 19 times heavier than water although the barren rock is generally only

    Aug 1, 2010

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    The risk management and cost benefits of using a total monitoring approach to managing slope instability hazards in open pit mines

    By C Jacobsen, N Harries

    Assessing and managing instability hazards is an essential activity when working with unstable natural slopes and excavated open pit mining slopes. Slope monitoring has become the standard technique f

    Nov 29, 2022

  • AUSIMM
    Integrated Landforms for the Storage of Tailings and Waste Rock at Magnetite Mines in Western Australia

    By D R. Anstey

    The mining of magnetite iron ore in Western Australia will generate large volumes of waste rock and tailings over many decades. The need to dispose of these materials will result in massive waste land

    Jan 1, 2009

  • AUSIMM
    Benchmarking – Does it have a Role in Improving the Performance of Mining Geology?

    By M Berry

    Many mining companies routinely use benchmarking to review their operational activities and associated costs. The aim is to measure operational performance against industry norms, and identify areas w

    Aug 18, 2014

  • AUSIMM
    A review of floor heave mechanisms in underground coal mine roadways

    By H Ramandi, H Masoumi, I Canbulat, B Hebblewhite, J Oh, S Saydam, W Timms, S Mo

    This paper reviews the floor heave mechanisms in underground coal mine roadways. Previous studies have reported three main failure mechanisms: bearing capacity failure, buckling and swelling. The buck

    Nov 30, 2018

  • AUSIMM
    Mineralogical Quantification of Iron Ore Sinter

    By S Hapugoda, J Manuel, E Donskoi, L Lu

    Sinter can constitute up to 80–85 per cent of the total ferrous burden in modern blast furnace ironmaking operations. The mineralogy and microstructure of iron ore sinter play an important role in det

    Jul 13, 2015