Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Review of the Cut and Fill Method of Underground Mining

    By Thompson IR, Solomons SS

    Underground mining with the cut and fill method has been declining during the past decade or so, being replaced mostly by sublevel open stoping methods. During 1983 the Australian Mineral Industries R

    Jan 1, 1985

  • AUSIMM
    Mineralogical Domains in the Victorian Gold Province, Maldon, and Carlin-Style Potential

    By Gregory L. M, Phillips G. N

    Although it has long been recognised that there is a diversity of minerals associated with Victorian gold deposits, the degree to which this mineralogy is systematic or haphazard has remained uncer

    Jan 1, 1997

  • AUSIMM
    Ultra Fine Grinding in an Impact Grinding Machine and its Limits of Application

    The investigations described in this paper aim at the development of a new impact mill. The objective is to produce particle size distributions below 10 .tm without using an air classifier. Circumf

    Jan 1, 1993

  • AUSIMM
    Problems of Forecasting Metal Prices

    There are serious problems in forecast- ing accurately and achieving this goal depends on good quality information, correct assumpt- ions and sound analysis. planner. The forecaster must focus attent

    Jan 1, 1983

  • AUSIMM
    DynoMiner<sup>TM</sup> APS Underground Explosive Loading System

    This paper introduces a new, safer bulk emulsion loading system for underground mining operations. The features and benefits of the equipment, along with the use of Dyno Nobel Inc patented gassed emul

    Jan 1, 2004

  • AUSIMM
    Material Flow in Acceleration Zone and Throughput of High Pressure Roller Mills

    By Schonert K

    The throughput of a HP-roller mill is determined by the acceleration of the feed material within acceleration zone and introduction into the compression zone. Both processes depend on the internal

    Jan 1, 1993

  • AUSIMM
    Coal - Paper No. 4 Rank And Type Variations In Coals From The Southern And South Western Coalfields, New South Wales, And Their Influence Upon Coking

    By Wilson R. G

    The Bulli and Wongawilli Seams, the two principal sources of coking coal for the Port KKembla steelworks of Australian Iron and Steel Pty. Ltd., vary in rank and in type over the Southern and -Sout

    Jan 1, 1969

  • AUSIMM
    Coolgardie Gold NL - William Ford Decline: Narrow Vein Sub-Level Up-Hole Mechanised Stoping and Long Hole Rise Blasting Practices

    By Will D

    This presentation is to outline the current practice of mechanised stoping a one-metre wide, gold bearing ore body to optimise fragmentation, minimise dilution and reduce stoping costs.Coolgardie unde

    Jan 1, 1993

  • AUSIMM
    The Application of Computer Modelling for Blasting and Flow in Sublevel Caving Operations

    By P Dare-Bryan

    Many mines have an interest in improving fragmentation at their sublevel caving operations in order to produce better ore recovery, lower dilution and less overbreak. The primary requirement for the e

    Jan 1, 2005

  • AUSIMM
    An innovative application of gravity separation technology to beneficiate ultrafine iron ore

    By J Lyons, M Hasan, D Pepper, C Vadeikis

    Processing of large volumes of ultrafine ores has long challenged mineral processing operators because of lower recoveries and increased tailings. This has led to many deposits, or parts of existing d

    Nov 8, 2021

  • AUSIMM
    Mineralogical Evaluation of PGE Behaviour in Fe-Ni-S and Cu-Ni-S Mattes and Fayalite Slag: Geological Implications

    By Selischop F, Tredoux M

    The distribution of platinum-group elements (pGEs) has been investigated in matte and slag samples from Waterval Smelter (Rustenburg Platinum Mines). The study showed that a strong preference of PGEs

    Jan 1, 1994

  • AUSIMM
    Geology - Paper No. 1 Computer-Assisted Geological Mapping

    By Marshall B, Gee R. D

    Geological data processing by machine enables&apos;an increased rate of coverage, better supervision and control of field programmes, increased effectiveness of field operators, and vastly improved

    Jan 1, 1969

  • AUSIMM
    Parametric assessment of tailings liquefaction and earthquake induced embankment deformations using FLAC

    By B Ghahreman‐Nejad, M Munro

    Design of embankment dams often requires seismic analyses, or an assessment of earthquakeinduced ground and dam movements. There are a large number of cases where earthquakes have triggered sliding an

    Jul 1, 2021

  • AUSIMM
    Metallurgical Properties of Synthetic Calaverite

    By Lawson F

    Synthetic calaverite (Au Tez) has been prepared and its physical properties checked.Simple flotation tests indicate that the recovery of calaverite should be possible using n-butyl or sec-butyl xantha

    Jan 1, 1991

  • AUSIMM
    The Permian Coal Deposits of New South Wales

    By Shiels O. J

    The major Permian coal deposits of N.S.W. are in the Sydney-Bowen Basin and associated small deposits occur in structurally isolated areas; a further deposit is present in the Oaklands Basin. - The S

    Jan 1, 1975

  • AUSIMM
    The Manufacture of Hot and Cold Finished Seamless and Welded Steel Tubing

    By Cotton P. L

    Although the terms &quot;pipe&quot; and &quot;tube&quot; are normally considered synonymous, a distinction is often drawn, the former term being applied to the hot finished product and the latter to c

    Jan 1, 1951

  • AUSIMM
    Flow of Iron in Blast Furnace Hearth

    By Hara Y, Arino S, Nakamura M, Tachimori M

    The theoretical and experimental studies have been done to clarify the hearth flow of iron and slag. The results of dissections show that the hearth can be treated as a packed bed of coke hav- ing

    Jan 1, 1981

  • AUSIMM
    Liner Optimisation to Improve Availability of the Ridgeway SAG Mill

    By P Griffin

    Mill relining is a major contributor to overall plant downtime. Reducing the number of mill liner pieces removed from and replaced in the mill has a direct impact on the overall reline time and in tur

    Jan 1, 2007

  • AUSIMM
    Cut and Cover Tunnelling on the Melbourne Underground Rail Loop Project

    By Johns A. L

    The concept of the Melbourne Underground Rail Loop and the organ- isation to achieve its construction are covered in the companion papers (Reference 1, 2) and will not be repeated here. The Victor

    Jan 1, 1981

  • AUSIMM
    Advances in Petroleum Exploration Technology 1963-1982

    A major tool in the search for petroleum is reflection seismic mapping. The period which has seen most of the exploration in Victoria is also one which has seen major advances in this technology,

    Jan 1, 1982