Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimising Cut-Offs Over Time

    By Wharton C. L

    This paper describes a new computer program which can significantly increase the Net Present Value of either an open cut or underground mine by optimising the cut-offs used during the operating lif

    Jan 1, 1995

  • AUSIMM
    A Simple Method of Measuring Rock Fracture Toughness using the Brazilian Test Method

    By Aziz NI

    There are a number of methods available for the determination of the fracture toughness of rock. Some of the most recognised methods include the hollow pressured cylinder, the short-rod, the chev

    Jan 1, 1992

  • AUSIMM
    Integrated Drill and Shovel Performance Monitoring Towards Blast Optimization

    By Scoble M, Peck J

    This paper reviews the instrumentation and monitoring of blasthole drills and electric mining shovels at a surface coal mine in western Canada. The drill monitoring component involved the developmen

    Jan 1, 1990

  • AUSIMM
    Developing Process Control Standards for Optimal Plant Performance at PanAust Limited

    By D Baas, D Bennett

    This paper describes how Brisbane-based PanAust Limited develops process control strategies that are implemented at all operations and are used in functional descriptions for plant upgrades and new pr

    Sep 1, 2014

  • AUSIMM
    Land Reclamation Trials and Practices at Martha Hill Gold Mine, Waihi, New Zealand (81918f20-43ae-4806-8567-9e3a20ae8542)

    By Gregg PEH, Stewart RB

    Reclamation field trials commenced in 1985, two years before the granting of the Mining Licence. The level of pasture production on varying soil depths (0 cm, 5 cm, 15 cm and 25 cm) overlying both ta

    Jan 1, 1995

  • AUSIMM
    Management of High-pressure Groundwater in Underground Development at Ernest Henry Mine

    By T Purvis, J Calverd, A-K Greve

    The Ernest Henry Mining (EHM) underground mine is situated adjacent to the Great Artesian Basin in North Queensland and within a fracture zone. Underground development commenced in February 2008 and h

    Mar 24, 2014

  • AUSIMM
    The Identification and Elimination of the Threat Posed by a Thickened Tailings Deposit in a Seismic Area

    By Phillips J. T, Hutton W. A

    This paper discusses why Argyle Diamonds adopted thickened tailings disposal in 1985 and how the system was developed over the next seven years. A wide ranging review of the thickened tailings disp

    Jan 1, 1996

  • AUSIMM
    Tectonics of Southern Pacrim

    Four data sets are required to put constraints on the tectonic evolution of the southern rim of the Pacific Ocean basinI . data bearing on the dispersal of the major Gondwanaland continental fragments

    Jan 1, 1990

  • AUSIMM
    Fluorine Removal From Ok Tedi Copper/Gold Concentrates

    By J W. Glatthaar, M Mavotoi

    The occurrence of fluorine in the copper/gold concentrates produced by Ok Tedi Mining Limited has provided a series of challenges to metallurgists since 1988. Although fluorine is distributed througho

    Jan 1, 2003

  • AUSIMM
    Integrated Expert Control System for Grinding and Flotation

    By Jarvensivu M, Ylinen R, Jamsa-Jounela S-L

    The paper presents a new integrated system for control of concentration processes. The system is based on cluster-based modelling taking the ore quality into account and a new on-line particle size

    Jan 1, 1993

  • AUSIMM
    Outlook for Oil Demand in the Pacific Basin Region (9b865cd3-308f-4c90-b186-680dbd93823b)

    Large GDP increases in the Pacific Rim countries have been accompanied by similarly large increases in demand for oil products. In the case of residual fuels, this demand has been tempered by the subs

    Jan 1, 1990

  • AUSIMM
    Evolution and technical considerations to manage tailings at the RPP- 140 mining title (Antioquia - Colombia)

    By García B., Wolff E.

    In Colombia, northeast of Antioquia, there is a gold deposit that has produced continuously since the middle of the XIX century, located within mining title RPP-140, property of Gran Colombia Gold Seg

    Jun 17, 2024

  • AUSIMM
    The Use of Continuous Materials Handling Equipment in an Open Cut Iron Ore Mine

    The scarcity of truck tyres combined with decreases in the availability of labour, increases in fuel costs and a buoyant international economy driving project budget blowouts, have all combined to cha

    Jan 1, 2007

  • AUSIMM
    Impact of Electronic Blasting Detonators on Rock Quarry Environment, Productivity and Energy Savings

    By M Bilodeau, G Caro, R Beaudoin, D Labrie

    In 2005, Dyno Nobel Canada Inc, DynoConsult and CANMET-MMSL used their pool of expertise in blasting, ground control, open pit and underground mining, mineral processing, information technology and ap

    Jan 1, 2007

  • AUSIMM
    Pacific Rim of Australia: The 600 Million Year Partnership of Gondwanaland and the Ocean

    The eastern third of Australia contains an unrivalled Phanerozoic rock record generated by the regional interaction of Gondwanaland with the Pacific and by the global effect of the 400 m.y. Pangaea -

    Jan 1, 1990

  • AUSIMM
    Saprolites, Structures and Slope Angles - Applying Site-Specific Geotechnical and Mining Knowledge to Achieve the Final Design

    By E C. F Hamman

    Sunrise Dam Gold Mine is a large open pit mine 730 km NE of Perth, Western Australia. Contract mining commenced in the open pit in September 1996 in lake clays and saprolites with the first fresh rock

    Jan 1, 2007

  • AUSIMM
    The Development of Gold Mining in Morobe, New Guinea

    By Morley I. W

    In the year 1926, Edie Creek, in the Morobe District of the Mandated Territory of New Guinea, saw the greatest gold rush of recent years. Situated 35 miles inland from the coast, and at an altitude of

    Jan 1, 1933

  • AUSIMM
    Transition of mechanical cooling refrigerants

    By T Roberts

    The transition of mechanical cooling refrigerants from their inception in the 1800s through to the current day has been driven by several factors. Original refrigerants such as sulfur and carbon dioxi

    Oct 12, 2022

  • AUSIMM
    Adding value with reverse circulation drilling at Pueblo Viejo

    By L Ventura, M Almond

    The Pueblo Viejo project in the Dominican Republic installed an innovative sample system on its reverse circulation (RC) drilling rig during commissioning and subsequent commencement of operations. As

    Sep 20, 2017

  • AUSIMM
    Recovery and Removal of Uranium by Using Biosubstances

    By Nakajima A

    Some attempts were made to recover uranium from aqueous systems by using various biosubstances including microbial biomass. Of hundreds species of microorganisms tested, extremely high uranium absor

    Jan 1, 1993