Search Documents

Search Again

Search Again

Sort by

  • SME-ICGCM
    Passive Seismic Imaging for Determination of the Longwall Rear Abutment Location

    By Erik Westman

    Few studies have been conducted regarding the location, movement, and relative magnitude of the rear abutment of a longwall coal mine. The rear abutment, or the abutment pressure arch in the gob area,

    Jan 1, 2012

  • SME
    Optimizing Usage Of Installed Size Reduction Power At Minera Peñasquito

    By S. Dixon

    The Peñasquito deposit in Mexico is one of the largest grassroots precious metal discoveries developed in recent years. Goldcorp Inc. acquired the gold-silver-lead-zinc property with the acquisition o

    Jan 1, 2012

  • SAIMM
    Evaluation Of The Behaviour Of High-Density Tailings Deposition - CODELCO Pilot Plant - Synopsis

    By J. Engels

    CODELCO is considering the implementation of high-density tailings management at the Chuquicamata mine in northern Chile for its long term disposal plan. To achieve this, CODELCO commissioned the desi

    Jan 1, 2012

  • CIM
    Significant Canadian Developments in Mineral Processing Technology 1961-2011

    By J. E. Nesset

    "I had been requested earlier this year by MetSoc, our sister society of CIM, to contribute a chapter on technical developments in Canadian mineral processing over the past 50 years to their 50th Anni

    Jan 1, 2012

  • CIM
    In-Plant Hydrogeochemical Mapping: A Tool to Localise Potential Deleterious Reactions Due to Water Quality in a Process

    By Mohamed Ourriban, Stéphanie Somot, Éric Proulx, Jean-Sébastien Marois, Marjolaine Drouin, Paul Blatter, Ahmed Bouajila, Claude Gagnon

    "The mining industry has to face increasing restrictions concerning the use of fresh water in Québec and throughout the world. Increasing recirculated water usage could lead to a better control of the

    Jan 1, 2012

  • SME
    Lessons Learned From Mineral Appraisal With Subsequent Market Sale ? Introduction

    By M. L. Chapman

    When originally accepting the assignment, the Client had described the property as vacant land. A prior appraisal was later discovered and revealed that the property included a mineral rights apprais

    Jan 1, 2012

  • SME-ICGCM
    New Monitoring Technologies for Measuring the in-situ Performance of Rock Bolts

    By Hani Mitri

    Understanding the interaction between rock bolts and underground rock movement is critical for safe and cost effective underground excavation design. Although early research on this subject involved a

    Jan 1, 2012

  • CIM
    Membrane Technology Applications in Mineral Processing

    By Rory Cameron, Chuck Edwards

    "Stringent environmental performance criteria and regulations, and the desire to minimize water use have made membrane-based treatment and separation processes an attractive option. This has lead to m

    Jan 1, 2012

  • CIM
    Nanoparticle Flotation Collectors for Pentlandite

    By Manqiu Xu, Songtao Yang, Zongfu Dai, Robert Pelton

    "Hydrophobic polystyrene nanoparticle suspensions were evaluated as potential flotation collectors for pentlandite. Experiments involving both clean model mineral suspensions and complex ultramafic ni

    Jan 1, 2012

  • CIM
    The Limitations of Activated Carbon in CIL Circuits Handling Preg Robbing Solids

    By Yeonuk Choi, Gus Van Weert

    "In regular CIL circuits, activated carbon is used for two purposes: avoiding solid/liquid separation after cyanide leaching, and minimizing gold losses in the tails. The carbon distribution and gold

    Jan 1, 2012

  • CIM
    Structure, Stratigraphy, U-Pb Geochronology and Alteration Characteristics of Gold Mineralization at the Detour Lake Gold Deposit, Ontario, Canada

    By B. Dubé, R. Friedman, J. Oliver, R. Aubertin, M. Burson, G. Panneton, M. Hamilton, J. Ayer

    "The Detour Lake gold deposit is located within the northwestern limit of the Archean Abitibi Subprovince of the Superior Province. Mineralized zones are hosted by a sequence of pillowed and massive f

    Jan 1, 2012

  • SAIMM
    Characterization And Alternative Dissolution Of Tantalite Mineral Samples From Mozambique ? Synopsis

    By M. Nete

    Qualitative analysis of three mineral samples from northern Mozambique was accomplished by X-ray diffraction (XRD), microscopy, scintillation, and magnetic determination. Chemical characterization was

    Jan 1, 2012

  • SME
    New Chances From Old Shafts - Risk Management In Abandoned Mine Sites In Germany ? Introduction

    By J. Kretschmann

    Around the world, mining has been done for thousands of years for the benefit of humankind. The winning process in mining operations ends with the depletion of the deposit or its closure if the operat

    Jan 1, 2012

  • SME
    Thermal Stability Of Low Melting Point NaNO3-NaNO2-KNO3 Ternary Molten Salts For Thermal Energy Storage

    By T. Wang

    A new generated NaNO3 ? NaNO2 ? KNO3 ternary thermal energy storage system which has low melting point as 124°C and high specific heat capacity was studied for the short and long?term thermal stabilit

    Jan 1, 2012

  • CIM
    Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)

    By Dayang Datu Khalil, Charle Amoah, Fred Kock

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • CIM
    Improvements in HPGR and Grinding Mill Technology

    By Cosmin Carpinisan, Erich J. Hofmann, Stephen J. Hall

    "Since presenting a technical paper regarding their unique capabilities in Forged Steel Mill Gearing at the SAG-2006 Conference, Australian heavy engineering company Hofmann Engineering has pioneered

    Jan 1, 2012

  • SME
    Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel

    By Michael Rehbock-Sander

    The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked

    Jan 1, 2012

  • CIM
    Goldex, the GRG Jewel

    By G. Belzil, F. Robichaud, M. Fullam

    "The Goldex mining and milling complex is operated by Agnico-Eagle Mines Ltd. and is located in the Abitibi greenstone belt of Northwest Quebec, Canada. The mill operates presently at a throughput of

    Jan 1, 2012

  • CIM
    Secondary Recovery of Bitumen Using Jameson Downcomers

    By R. Siy, O. Neiman, B. Hilscher

    "A full-scale prototype of “Jameson Downcomer” technology has been installed and tested on a Tailings Oil Recovery (TOR) vessel in Syncrude’s Mildred Lake extraction plant. Jameson Downcomers are a ty

    Jan 1, 2012

  • SME
    CFD-Based Floatation Model For Prediction Of Pulp Recovery Rate

    By S. Ragab

    The objective of flotation models is to predict the recovery rate of minerals from a flotation cell. In this paper a CFD?based flotation models is presented. The model uses first order rate equation,

    Jan 1, 2012