OFR-122(4)-80 Alumina Process Feasibility Study And Preliminary Plot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume IV - Appendix B - General Specification - Section 1 - Building Description1.0 Control House (DWG. NO. 56-401-G) - 1.1 Physical Description The Control House is a single story, 2728 square foot building with an adjacent transformer yard. A four foot overhang provides shad
Jan 1, 1979
-
OFR-101-80 Environmental Assessment Of In Situ MiningBy Dennis R. Kasper
This study evaluates selective environmental impacts of two distinct in situ mining techniques. In situ leaching of uranium, porphyry copper and native copper and in situ borehole (slurry) mining of u
Jan 1, 1979
-
OFR-19-81 Improved Fire Safety Of Coal Mine Hydraulic SystemsBy Frederick C. Kohout
An advanced water-in-oil emulsion hydraulic fluid has been developed which meets defined laboratory performance criteria and which has given fully satisfactory results in a one-year underground mine t
Jan 1, 1979
-
OFR-87-80 A Technical Basis For The Development Of Deep Ocean Mining RegulationsBy Philip B. Grote
The deep ocean mining industry is in a pre-commercialization stage of development. In the context of a proper legal/regulatory regime, deep ocean mining system design, site survey, and operation techn
Jan 1, 1979
-
OFR-122(2)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume II - Appendix A - Equipment List, Specifications - And Quotations - Areas 1 - 7 ? IntroThis appendix contains the list of equipment selected for the capitol cost estimate, with the respective quotations from their vendors/manufacturers. A vendor response report along with a separate equ
Jan 1, 1979
-
OFR-102-82 Development And Testing Of Self-Drilling Roof BoltsBy F. S. Kendorski
This report presents the results of a search for viable-self-drilling roof bolt concepts, detailed development, design, and manufacture of such bolts that drill their own holes, and testing in the lab
Jan 1, 1979
-
-
DiscussionThe Role of the Drilling Contractor BY FERRIS E. SAINSBURY Ron Haxby, Occidental Minerals What is the best method for drilling a 12-in. diam hole to a depth of 1200 ft and maintaining the deflecti
Jan 1, 1979
-
Contractors' Experience With The Hydroshield Tunneling SystemBy Erich J. Jacob, Volker O. Meldner
INTRODUCTION Our company has made persistent efforts to utilize the very latest cost-saving technology in tunnel design and construction. However, we were relatively late in joining the clan of slu
Jan 1, 1979
-
Blasthole Drilling Doesn't Have to Be BadBy Betty J. Laswell, Gerald W. Laswell
Rotary drilling in modern open-pit mining is usually considered the lead phase which not only establishes the production rates but frequently limits them. From this viewpoint alone, the drilling phase
Jan 8, 1978
-
Who's Who in Mineral Engineering - The 1978 Membership Directory of the Society of Mining Engineers of AIMEWho's Who in Mineral Engineering - The 1978 Membership Directory of the Society of Mining Engineers of AIME
Jan 7, 1978
-
The Pro's and Con's of Rotary Blasthole Drill DesignBy Betty J. Laswell, Gerald W. Laswell
The stepped-up pace of US open-pit and surface mining during the 1970's is a direct response by mining firms and equipment manufacturers to rising costs and declining ore grades. In the race for
Jan 6, 1978
-
Mining Engineering's 1977 Annual ReviewIt is probably safe to say that, as the economic well-being of the mining industry goes, so goes the fortunes of mineral explorationists. And in 1977 the industry was not well at all. The year-long de
Jan 5, 1978
-
Mineral Indicators - AluminaKaiser Aluminum & Chemical Corp. announced that it planned to spend $66 million to increase the efficiency of its Baton Rouge, Louisiana, alumina plant. The improvements are designed to reduce energy
Jan 1, 1978
-
OFR-10(3)-79 Noise Control Modification Manual - Jeffrey 94-L Bridge ConveyorBy Tom Retka
This three volume final report summarizes the activities and conclusions of this contract. The objective of the contract was to develop noise control modifications on a retrofit basis, for auger miner
Jan 1, 1978
-
Raise Boring Machines with Solid-State DC DrivesBy Lyle F. Smith
With the demand for larger diameter raises under all ground conditions and the increasing price of drill rods and operating costs, it was evident that there was a need for a raise borer with a variabl
Jan 1, 1978
-
IC 8764 Transducer Preparation And Gage Assembly Of The Bureau Of Mines Three-Component Borehole Deformation GageBy David L. Bickel
The following instructions and descriptions are presented in two parts to assist an individual to make the borehole deformation gage transducer, and to assemble and test the three-component borehole d
Jan 1, 1978
-
OFR-108-79 Dust Sampler Tamper-Proof Filter CassetteBy Charles H. Etheridge
A new filter cassette is described which can be used with Coal Mine Dust Personal Sampler Units (CFR, Title 30, Part 74). The sealed cassette design reduces the chances of sample loss due to reverse f
Jan 1, 1978
-
OFR-30-79 Development Of An Improved Tamper-Proof Filter CassetteBy Gene F. ] [Faufaul
This contract was concerned with the design, development, fabrication and testing of an improved tamper-proof filter cassette assembly for use in the, collection and evaluation of dust particulates, p
Jan 1, 1978
-
Leaching of Some Australian Nickeliferous Laterites with Sulphuric Acid at Atmospheric PressureSulphuric acid leaching at atmospheric pressure of a number of Australian nickeliferous laterites was examined in detail. The results obtained indicate that nickel can be extracted from these ores, al
Jan 1, 1978