Search Documents

Search Again

Search Again

Sort by

  • CIM
    La Fabrication de fer Préréduit Pour Utilisation au Four à Arc Électrique

    By A. H. Marquis

    Since the start-up of its first Direct Reduction Module in April 1973, S1DBEC has produced over 2 million tons of prereduced iron. During this period, SIDBEC has acquired comprehensive experience in t

    Jan 1, 1979

  • CIM
    Operation of Enviro Clear Thickeners in Series as CCD Units

    By L. W. Hamel

    "Two 35 foot diameter enviro clear thickeners were tested in series as CCD units from June until October, 1978. Up to shutdown in July, we ran with automatic bed level control via the level probes and

    Jan 1, 1979

  • AIME
    Instrumentation, Automation, and Process Control (666a6871-2a0b-4569-b186-7269b1528cd0)

    By Kenneth K. Humphreys

    INTRODUCTION What is automation? Why automate? Webster's New Collegiate Dictionary defines automation as "the automatically controlled operation of an apparatus, process, or system by mechani

    Jan 1, 1979

  • AUSIMM
    The Washability of Australian Coals

    Australian coals tend to be young in geological age and high in ash by world standards; preparation of the coal before marketing is almost universal. On the basis of float and sink data from 39 locati

    Jan 1, 1979

  • NIOSH
    Mineral Indicators - Aluminum (e5e165f2-54ae-49aa-b7f1-31cefd1ab623)

    On July 1, the Bonneville Power Administration announced a 25% power cutback because of lower than normal stream flow. In September, the Aluminum Company of America (Alcoa) announced plans to shut dow

    Jan 1, 1979

  • AUSIMM
    Cuprous Hydrometallurgy. Part V. Leaching of Copper-Lead Matte with Copper(II) Sulphate in Aqueous Acetonitrile

    By Parker A. J, Giles D. E

    Solutions of copper(II) sulphate in acidified aqueous acetonitrile leach copper from copper-lead matte derived from the drossing of lead with sulphur to produce solutions of copper(I) sulphate. The re

    Jan 1, 1979

  • NIOSH
    OFR-62-80 Development Of A Rapid Response Radon Monitor

    By Richard I. Miller

    Science Applications, Inc. has developed for the U.S. Bureau of Mines a rapid response radon monitor capable of accurately responding within three minutes to changing radon levels of magnitude from 10

    Jan 1, 1979

  • NIOSH
    OFR-27-82 Propagation Of UHF Radio Waves In Limestone Room And Pillar Mines

    By Robert L. Lagace

    This report presents a mathematical model for the propagation of UHF radio waves in the large cross-section tunnels of a room and pillar limestone mine, and describes the analysis of a small amount of

    Jan 1, 1979

  • CIM
    Chemical Additives for Improving the Wet Grinding of Ores

    By R. Samuels, R. Klimpel

    "IntroductionLaboratory and industrial grinding tests have shown that the process of size reduction of metal containing ores can be significantly influenced by chemicals added to the slurry being grou

    Jan 1, 1979

  • AUSIMM
    Technical Note on Recovery of Manganese from Low Manganese Content Ferromanganese Slag

    By Rao P. K, Sahoo P. K

    The main constituents of ferromanganese slags are silicates of Mn, Ca and AI. Factors affecting the recovery of manganese from a low manganese content ferromanganese slag (about 16 per cent MnO) durin

    Jan 1, 1979

  • NIOSH
    Driver Visibility System For Large Mining Trucks - Objective

    Reduce the number of accidents in which large mining trucks crush objects that were not visible to the driver. Approach Improved rear view mirrors, light-bending plastic lenses, and a closed cir

    Jan 1, 1979

  • SME
    ARMCO Autometrics Particle Size Measurement And Control

    By Albin E. Anderson

    The PSM System has been available to the mining industry for nine years. During this time, many of the more than 160 Systems sold have been put to practical use and have provided the owners a handsome

    Jan 1, 1979

  • NIOSH
    IC 8797 Mine Health And Safety Contract Research, Development, And Demonstration In Fiscal Year 1979

    This publication summarizes, for potential contractors and other interested parties, the research, development, and demonstration contract projects programed by the Bureau of Mines for fiscal year 197

    Jan 1, 1979

  • SME
    Design And Construction Of Norad Expansion Project "Excavation Phase"

    By Gerald G. Griswold, Allan G. Provost

    INTRODUCTION The Norad Expansion Project was located 10 miles southwest of Colorado Springs, Colorado, within Cheyenne Mountain. The expansion areas to be excavated would be adjacent to the existin

    Jan 1, 1979

  • SME
    Stockpiling And Reclaiming Systems In Mill Design

    By Michael J. Miller

    In the design of a modem mill, a stockpile storage system for raw and/or semi-processed ore has become almost indispensable. This paper discusses the benefits of such stockpile storage as well as the

    Jan 1, 1979

  • CIM
    The Texasgulf Concentrator Expansion

    By A. M. Hill

    "This is an account of the expansion of Texasgulf's Timmins concentrator by the building of a fourth circuit.The original capacity of the mine and concentrator was 3.6 million tons per year of ore. In

    Jan 1, 1979

  • NIOSH
    IC 8804 Quarrying Near Urban Areas: An Aid To Premine Planning

    By J. M. Pugliese

    The Bureau of Mines, in support of its overall goal of helping to meet future U.S. demand for minerals, undertook this study to aid the quarry entrepreneur and/or operator in developing quarries near

    Jan 1, 1979

  • NIOSH
    IC 8796 Cost Of Producing U308 From Ammonium Bicarbonate In Situ Leach Solution By The Multiple-Compartment Ion-Exchange System

    By Masami Hayashi

    The Bureau of Mines estimated the cost for ,3 uranium ion-exchange recovery system using five grades of 17.0, leach solution producing 815,570 pounds of U 0? per year from an ammonium bicarbonate in s

    Jan 1, 1979

  • NIOSH
    Mineral Indicators - Aluminum (3c9a6c0f-f8d7-4a06-8832-e98398516b54)

    Workers at the Consolidated Aluminum Corp. primary aluminum smelter at Lake Charles, LA walked out at midnight March 31 when their contract expired. Management personnel operated the smelter and preba

    Jan 1, 1979

  • NIOSH
    1978 Raw Nonfuel Mineral Production

    The value of raw nonfuel mineral materials production totaled an estimated $19.7 billion in 1978. The record 1978 value exceeded by 13 percent the 1977 value of $17.5 billion. This raw mineral output

    Jan 1, 1979