Search Documents

Search Again

Search Again

Sort by

  • SME
    Ground Improvements for CSO Connections to a Large Tunnel, Cleveland, Ohio

    By Narendra N. Khatri, Michael Deutscher, Jozef F. Zurawski

    Five sewer connections were required to divert Combined Sewer Overflow (CSO)from existing outfalls to an old underutilized large diameter brick sewer (the Easterly Interceptor). The connections were p

    Jan 1, 2005

  • TMS
    Preparation Of Monodispersed NiO Precursor Particles By Induced Precipitation Of Solid Oxalate Acid

    By Huang Kai

    By adding the solid oxalate acid powder into the solution of nickel chloride or its ammonia coordinated solution, the uniform compound particles were prepared and the precipitated particles were trans

    Jan 1, 2005

  • CIM
    Designing For Paste Thickening

    By Tim Edwards, Richard Triglavcanin, Ian Arbuthnot, Darren Colwell, Brad Garraway, Ken Roberts

    "In the mineral processing industries, there is an increasing need to design thickeners which are able to produce high density underflows usually referred to as “paste”.The behaviour of a flocculated

    Jan 1, 2005

  • SAIMM
    Rockpasses: A Guide To Excavation Methodology

    By U. Sachse

    This paper explores a systematic approach for mining decision-makers to use when faced with choosing which method to use for a specific rockpass length. The different excavation methods available in t

    Jan 1, 2005

  • SAIMM
    Mining Grade And Sampling Theory - The Logical Way To Evaluate Ore Reserves

    By P. I. Page

    In mineral exploration the place that yields the first significant result is marked and two questions are posed immediately. Where should the next sample be drawn and how big should it be? At present

    Jan 1, 2005

  • RMCMI
  • SAIMM
    Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No.3 Shaft.

    By M Lipalile, A B. Tunono, A W. Naismith

    Konkola No 3 shaft experienced severe mining induced stress and time related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow

    Jan 1, 2005

  • SME
    Adventures in Microtunneling

    By Joseph Clare, Elizabeth Anderson, Mike McGinley, Ron Hines, Judy Cochran

    The South Lake Union Pipelines contract for King County Wastewater Treatment Division and Seattle Public Utilities in Seattle, Washington included three 1.8 m (72-in)inside diameter microtunneled pipe

    Jan 1, 2005

  • SAIMM
    The Relationship Between The Client, Clients Project Team And The EPCM Project Team

    By C. A. F. Sweet

    The inter-relationship between these parties and the effect on the outcome of the project is often grossly underestimated. There are numerous success stories where the parties have worked as com

    Jan 1, 2005

  • DFI
    Design Of The Marine Foundation For The Skyway Project Of The San Francisco Oakland Bay Bridge

    By Gerry Houlahan

    The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde

    Jan 1, 2005

  • SAIMM
    7.1 Spangenberg - Sampling Standards In Anglogold Ashanti Gold Mines In Sa

    By Conné Spangenberg

    Contents ?Introduction ?Metal accounting environment ?Problem statement ?Investigations & Achievements ?Metal Accounting ?Principles ?Standards ?Audits ?Questions

    Jan 1, 2005

  • SME
    The Green Mining Technique in Chinese Collieries

    By Minggao Qian, Jialin Xu, Wenqi Lai, Weibin Zhu

    This article advances an innovative concept explaining the connotation and technical system of "green" mining. The important theoretical foundations of "green" mining are the distribution and developm

    Jan 1, 2005

  • CIM
    High Pressure Grinding of Gold Ore HPGR Demonstration at Newmont’s Lone Tree Mine

    By Polysius AG

    "The Lone Tree demonstration was an important milestone in bringing High Pressure Grinding Roll (HPGR) technology into hard rock applications in the mining industry. HPGRs have become standard equipme

    Jan 1, 2005

  • SAIMM
    Sulphur From Smelter Gases And Sulphate-Rich Effluents (447c1963-4549-4273-ab9d-d556c7518bc3)

    In extracting base metals from orebodies, sulphide as well as oxide, the main environmental concern is sulphur, whether in the form of sulphurous gases or sulphate in liquid form. Generally sulphur is

    Jan 1, 2005

  • SME
    Metal-slag equilibria and behavior of impurity oxides in ilmenite smelting

    By J. Pesl, R. Hurman Eric

    Metal-slag phase compositions of molten iron and ilmenite smelting slags or solid titanate phases were determined between 1500° and 1700°C. The influence of oxygen partial pressure and impurity oxide

    Jan 1, 2005

  • SME
    Northeast Interceptor Sewer Case History

    By Brett Zernich, Michael Krulc, Brett Robinson

    This paper provides an account of the efforts undertaken to construct the Northeast Interceptor Sewer (NEIS) project, which is a portion of a much larger program in Los Angeles, California to upgrade

    Jan 1, 2005

  • SAIMM
    A Technical And Operational Audit Of The First Ten Years Of The Teniente Converter Operations At Nkana Smelter

    By M. Syamujulu

    In 1994, Nkana smelter commissioned a multimillion US Dollar Chilean Teniente converter (CT) in its operations in order to improve its smelting technological base. The main objective was to reduce the

    Jan 1, 2005

  • SAIMM
    Fundamental Analysis Of The Interaction Between Overburden Behaviour And Snook Stability In Coalmines

    By J. N. Van der Merwe

    In the process of pillar extraction, pillars are seldom if ever extracted completely. The pillar remnants, or snooks, play an important role in the extraction process. At the working face, they need t

    Jan 1, 2005

  • SME
    Short Tunnels with Shallow Cover

    By David Smith

    Construction of a new transportation link frequently requires crossing under an existing highway or railroad. Although traffic diversions may permit a cut and cover structure to be built, ‘zero impact

    Jan 1, 2005

  • SME
    Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO

    By Carl Johnson, D. R. Todd

    The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie

    Jan 1, 2005