Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Use of Computational Fluid Dynamics and Discrete Element Modeling to Understand the Effect of Cell Size and Inflow Rate on Flotation Bank Retention Time Distribution and Mechanism PerformanceBy Richard Peaker, Jens Lichter, Alexander V. Potapov
"The recent combination of Computational Fluid Dynamics (CFD) and Discrete Element Modeling (DEM) can provide considerable insight into the performance of flotation cells. One area of interest from a
Jan 1, 2007
-
Rheological Behaviors In Wet Ultrafine Grinding Of LimestoneThis paper investigates the effects of solids concentration and the addition of Dispersant S40 on the flowability of original and ground limestone slurries. A rotational viscometer with a concentric c
Jan 1, 2007
-
Identification Of Noise Sources On Longwall Panels Using Multiple Time-Synchronized Dosimeters (29ca0bb5-2d84-41df-acdc-84917631e72e)By D. Babich, L. Alcorn, E. Spencer, A. Smith
Noise is one of the most pervasive health hazards in mining. A compilation of Mine Safety and Health Administration (MSHA) noise survey data for Fiscal year 1990 shows that approximately 40% of the t
Jan 1, 2007
-
Roadway Strata Management in the New South Wales Underground Coal Mining IndustryBy Rob Thomas
Strata management is a critical and now necessary requirement in the New South Wales underground coal mining industry. As a formal and structured process, strata management allows ground supp
Jan 1, 2007
-
Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approachesBy A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak
A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic
Jan 1, 2007
-
Using Major Hazard Risk Assessment to Appraise and Manage Escapeway Instability Issues: A Case Study (d1d3dd49-2f0a-44af-8ddf-69de3f441c2d)By Anthony Iannacchione
A Major Hazard Risk Assessment (MHRA) was developed in Australia after a series of mine disasters in the 1990?s. A MHRA is used to help prevent major hazards, i.e. fire, explosion, wind-blast, outbur
Jan 1, 2007
-
Environmental and ventilation benefits for underground mining operations using fuel cell powered production equipment (0d6b8fbf-8199-4422-8088-a542f4b15d8b)By D. Eastick, S. Hardcastle
"Over the last few years, a multi-faceted feasibility study has been evaluating the introduction of hydrogen fuel cell-powered equipment into underground mines to replaced diesel engine-powered equipm
Jan 1, 2007
-
Ferro Silicon Operation At IMFA ? A Critical AnalysisBy Dhananjaya Senapati, E. V. S. Uma Maheswar, C. R. Ray
Carbothermic process of Ferro Silicon production is primarily a slag-less process. However, slag formation is observed in the regular operation as experienced by almost all the Ferro Silicon Producers
Jan 1, 2007
-
Occupational health and safety in mining?status, new developments, and concerns - SynopsisBy M. A. Hermanus
This paper examines the occupational health and safety performance (OHS) of the South African mining sector against the backdrop of changes in the composition of the sector, international trends in OH
Jan 1, 2007
-
Niagara Tunnel ProjectBy Doug Harding
The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.
Jan 1, 2007
-
Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels ProjectBy Chris Tattersall, Tomyuki Kudo, Peter Raleigh, Nestor Garavelli, Steve Redmond, Michael J. Lehnen
Twin bore running tunnels driven approximately 4,500 route feet by a Mitsubishi Heavy Industries (MHI) EPB Tunnel Boring Machine link the West Portal and East Portal on this complex Light Rail Project
Jan 1, 2007
-
Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New ZealandBy Charlie Watts, Ken Smales, Ron Fleming
The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace
Jan 1, 2007
-
Assessing The Uncertainty Due To Grades And Grade Shell Limits For The West Leeville Underground DepositBy C. Deutsch
Resource estimation for the West Leeville deposit is prepared using a conventional explicit approach. The geologic model is developed using interpretive methods based on visual logging. Grade shells
Jan 1, 2007
-
Internal Corrosion Of Slurry Pipelines Caused By Microbial Corrosion: Causes And Remedies (823fbe7e-37bc-47a1-8382-1714937f7253)By C. Ringas
Pipelines are used extensively in industry to convey various products. Internal corrosion of pipelines can lead to perforation and leakage of the product. A growing problem, not often accurately recog
Jan 1, 2007
-
Larox Horizontal Vacuum Belt Filter With Side Vacuum - 1. IntroductionBy R Kroukamp
Horizontal belt filters are typically used for separation of relatively free filtering solids where good post treatment is required. He horizontal belt filter is a continuous filter with an endless cl
Jan 1, 2007
-
MLA: The New Sherlock Holmes of the Mining and Metallurgical Engineering IndustryBy Paul Miranda, Corby Anderson
"The Center for Advanced Mineral and Metallurgical Processing (CAMP) has recently obtained a Mineral Liberation Analyzer (MLA). CAMP has utilized the technology for several projects with excellent res
Jan 1, 2007
-
Analysis Of Airborne And Waterborne Particles Around A Taconite Ore Processing FacilityBy Charles W. Axten
Since the mid-1970s, samples of airborne and waterborne fibrous particulates have been collected in the area of the Northshore Taconite Ore Processing Facility by the Minnesota Department of Health (M
Jan 1, 2007
-
Online Cyanide Analysers Optimise Cyanidation and Ensure Cyanide Code Compliance for Plant TailingsBy D Kotzen
Online cyanide analysers have been successfully used to control free cyanide in the gold/silver leach process for over 15 years. Use of such analysers leads to cyanide savings and improvement in recov
Jan 1, 2007
-
Evaluating Ground Conditions Ahead of a TBM Using Probe Drill DataBy Steven K. Duke, Jay Arabshahi
An economic, real-time probe drill monitoring system was developed for Metropolitan Water District’s Arrowhead Tunnels project to quantitatively evaluate ground conditions ahead of a TBM. This system
Jan 1, 2007
-
Structural Controls on Massive Sulfide Deposition and Hydrothermal Alteration in the South Sturgeon Lake Caldera, Northwestern OntarioBy A. H. Mumin, A. K. Somarin, K. S. Oran
"Synvolcanic structures played a fundamental role in the genesis, morphology, and siting of volcanogenic massive sulfide ores and associated hydrothermal alteration in the Archean South Sturgeon Lake
Jan 1, 2007