Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    A Tool for Benchmark Study of Roadway Development Performances

    In responding to why some longwall roadway development rates are different among mines, the Roadway Development Task Group (RDTG) of Australian Coal Association Research Program (ACARP) has initiated

    Dec 6, 2010

  • AUSIMM
    Precision Surface Mining - Choosing the Best Tool for the Job

    Precision surface mining is increasingly occupying a significant role in open pit mining. Improvements in technology now allow continuous surface mining of material well above 140 MPa (20 300 psi) eff

    Dec 6, 2010

  • SME
    NAT 2010 Full Proceedings - NAT2010

    By Bradford F. Townsend, Matthew E. Fowler, Michael F. Smithson, Lawrence R. Eckert

    All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho

    Dec 1, 2010

  • AUSIMM
    A Case Study on Mine Subsidence Due to Multi-Seam Longwall Extraction

    The case study has identified and characterised additional subsidence arising from longwall mining above or under existing longwall goaf. It suggests that the magnitude, mechanisms and prediction meth

    Nov 25, 2010

  • AUSIMM
    Managing Geotechnical Risk Through Non-Destructive Rock Reinforcement Testing Trialled at the George Fisher Mine, Mt Isa

    Corrosion affects the performance of rock support and reinforcement at various underground mines, including the George Fisher Mine, where recent studies showed that this risk to mining operations is g

    Nov 25, 2010

  • AUSIMM
    Laboratory and Field Tests on Point Anchored Resin Bolts at the Ridgeway Deeps Block Cave

    The design of excavations in high displacement mining environments requires consideration of both the load and displacement capacity of the ground reinforcement and support systems. This paper is a ca

    Nov 25, 2010

  • AUSIMM
    Validation Test of Ground Control for a Vertical Rise

    Entry of personnel under a vertical raise bored hole is not standard practice in Australia. Where access is required below a rise, mining operations must be confident that they understand the capacity

    Nov 25, 2010

  • AUSIMM
    Successful Raiseboring in Poor Ground Conditions, Kencana Mine, Indonesia

    Ground conditions at the Kencana mine, Indonesia, are generally poor and an underhand cut and fill mining method is used for extraction. Due to these poor ground conditions, all vertical development h

    Nov 25, 2010

  • AUSIMM
    Analysing and Rehabilitating Rock Mass Failure in Critical Mine Infrastructure

    To optimise the haulage of the large tonnages produced from stopes in this high production gold mine, an ore pass and feeder system was introduced. This ore pass was designed and developed in 2006 and

    Nov 25, 2010

  • AUSIMM
    Numerical Modelling of Confinement Effects on Mechanical Properties and Failure Pattern of Brittle Rocks in Triaxial Tests with PFC3D

    One of the most important goals of the experiments is to determine deformation and strength of the rock specimen under applying triaxial load, the status of failure condition is one of the subjects wh

    Nov 25, 2010

  • AUSIMM
    Pillar Design in Hard Rock Mines - Can we do this with Confidence?

    This paper gives an overview of the difficulties associated with determining the strength of hard rock pillars. Although a number of pillar design tools are available, pillar collapses still occur. Re

    Nov 25, 2010

  • AUSIMM
    The Geotechnical Input into the Mining Process at George Fisher South Mine

    Geotechnical input is interwoven into the mining process at George Fisher South Mine from the planning and design of working areas to the closure of worked out areas and maintenance of life of mine an

    Nov 25, 2010

  • AUSIMM
    Optimising Geotechnical Logging to Accurately Represent the Geotechnical Environment

    Typically, large volumes of data are collected during geotechnical investigations for mining projects but rarely is this done in a comprehensive manner that enables all aspects of the geotechnical env

    Nov 25, 2010

  • AUSIMM
    Recent Secondary Extraction Experience at Cook Colliery in a Multi-Seam Environment

    Cook Colliery currently mines in the Argo Seam, beneath old workings in an overlying seam. The Argo seam is up to 4.8 m thick and a continuous haulage system behind an ABM25 is used to develop first w

    Nov 25, 2010

  • AUSIMM
    Calibrated Geotechnical Measurement to Provide a Quantitative Understanding of Rock Mass Conditions at the Tasmania Gold Mine, Beaconsfield, Tasmania

    Judicious placement of a range of geotechnical instruments was employed at the Tasmania gold mine, Beaconsfield, Tasmania, as a key strategy in the monitoring of rock mass conditions over the past fou

    Nov 25, 2010

  • CIM
    From Boom to Bullion, Imaging Technology in Mining

    By Tom C. Palangio

    The mining industry has come to rely on imaging devices to monitor and record all kinds of activities. We use them to measure, improve the process, ensure security, increase production and automate ma

    Oct 1, 2010

  • CIM
    Strategies for Mining in the Vicinity of the Creighton Fault at Vale?s Copper Cliff Mine

    By Mehdi Razavi

    Scope of the Study The possibility and risk associated with mining two stopes at the same time The influence of Creighton Fault on the stability and dilution The effect of irregular shape of stope

    Oct 1, 2010

  • CIM
    PT Redpath Indonesia and PT Freeport Indonesia Past and Future Development of Underground Mines

    By Bruce Mennie

    PT Freeport Indonesia (PTFI) operates copper and gold mining operations in a mountainous area of the Mimika regency, near Tembagapura, Papua (formerly, Irian Jaya), Indonesia. The mining and concent

    Oct 1, 2010

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    Navigating Change for Success

    By Julie Dénommé

    Today few in business would argue with the idea that we are living in a world that is Volatile, Uncertain, Complex, and Ambiguous. Coined VUCA by the US Army War College, these four words define the ?

    Oct 1, 2010