Search Documents

  • AIME
    Present Value in Its Relation to Ore Reserves, Plant Capacity, and Grade of Ore

    By Edwin Berry

    THE consideration of the present value of a mine is of great importance when planning for the operation of a property,, and it is particularly so in the case of mines that have large ore reserves. At

    Jan 7, 1922

  • NIOSH
    Improved Electromagnetic System For Locating And Talking To Trapped Miners -(This Technology News Replaces Issue No. 10.) - Objective

    Improve the Bureau-developed system for locating and communicating with miners trapped underground following a mine disaster. Approach Include in the wireless system a portable second-generati

    Jan 1, 1981

  • NIOSH
    RI 6057 Transfer Of Heat From Helium At High Temperatures - Physical Characteristics Of Ceramic Heat Exchangers ? Summary And Introduction

    By John J. S. Sebastian

    A laboratory-scale investigation was made of the basic problems involved in developing a ceramic heat exchanger to operate at high temperatures for using nuclear heat from gas-cooled process-heat reac

    Jan 1, 1962

  • CIM
    Occupational Standards and Certification for Mineral Processing Technicians in the Northwest Territories

    By Mary Ann Bennett, Val Nichols, Colleen Proctor

    "In 1997 when Royal Oak Mines Inc. went into receivership, the mineral processing technicians (mill operators) who had been working at Giant Mine in Yellowknife, Northwest Territories for most of thei

    Jan 1, 2005

  • AUSIMM
    Increasing Net Present Value by a Third at an Operating Sublevel Cave Mine Using Draw Strategy Optimisation

    By A D. Campbell, G R. Power

    The objective of the draw strategy in a caving mine is to maximise economic return by minimising waste dilution3 and maximising ore recovery4. The draw strategy must also include suitable controls for

    May 9, 2016

  • NIOSH
    OFR-22(2)-77 Inherently Safe Mining Systems (Conventional) - Phase III - Volume II - Appendixes

    By D. O. Hamiltion

    The ISMS program provided for the development and demonstration of equipment modifications in both conventional and continuous coal mining systems. This report describes activities during the demonstr

    Jan 1, 1976

  • SME-ICGCM
    Coal Mine Geology in the U.S. Coal Fields: A State-of-the-Art-Review

    By Frank E. Chase

    During the past quarter century, coal mine geologists have evolved from providing a qualitative description of drill core and coal reserves into quantitative geotechnical specialists who bridge the ga

    Jan 1, 2006

  • NIOSH
    OFR-73(1)-80 Topsoil Rock Removal Technology

    By Walter W. Kaufman

    This report summarizes a study conducted to determine the state of the art of various rock removal systems and their capabilities. The objective of the study was to determine if currently manufactured

    Jan 1, 1979

  • NIOSH
    OFR-43(1)-77 Mine Fire Protection For Underground Maintenance Shops - Introduction

    Large quantities of combustible materials are often found in underground metal and nonmetal mines, with support timber most often the predominant combustible material. Oils, lubricants, paper, cartons

    Jan 1, 2011

  • SME
    Directing responses to mine fires and explosions

    By J. E. Urosek

    Decisions made during a response to a mine fire or an explosion greatly affect the final outcome. The safety of miners should be the primary concern with accounting for all of the miners the first is

    Jan 1, 2009

  • NIOSH
    Emerging Technologies And The Future Of Geotechnical Instrumentation

    By E. L. McHugh, J. M. Girard

    This paper discusses the results of two recent case studies in which high-tech prototype instruments were used. The first case study describes the results of a ground-based hyperspectral imaging tool

  • AIME
    Reservoir Engineering - General - Steam Zone Growth in a Preheated Reservoir

    By P. J. Closmann

    Steam zone growth as a function of time has been calculated for the case of constant rate steam injection into a preheated reservoir. To simplify the calculation a linear temperature profile has been

    Jan 1, 1969

  • AIME
  • NIOSH
    OFR-87(2)-79 High And Medium Voltage Trailing Cable Splices And Connections - Vol. II - Trailing Cable Couplers

    By M. L. Fenger

    This report describes a study of the factors which affect medium voltage (661 - 1000 volts) and high voltage (1001 - 7500 volts) trailing cable couplers for use in underground coal mines to connect tr

    Jan 1, 1978

  • CIM
    Taxation of a Canadian Gold Mining Company

    By E. D. Fox

    Introduction The financial statement of the hypothetical Gold Mining Company, which forms the background of this survey, was designed for the Institute with the express abject of having it assessed i

    Jan 1, 1934

  • SME
    Rock Mechanics Of The Davis Detector Cavern ? Introduction

    By W. G. Pariseau

    This contribution describes rock mechanics features of the Davis Cavern at the former Homestake Mine in Lead, South Dakota, U.S.A. The mine is located in the northern Black Hills of South Dakota. In

    Jan 1, 2012

  • SME
    The Economic Recovery Of Zinc From Mining Influenced Water For Fertilizer Applications

    By K. Whysner

    The recycling of metal resources in mining influenced water (MIW) requires a paradigm shift from within the mine water treatment industry. The potential to recover zinc for beneficial use in the micro

    Feb 27, 2013

  • DFI
    Research Advances In Barrettes: Installation Effects And Load-Carrying Behaviour

    By Guo H. Lei

    Over the last four decades, barrettes have been ever-increasingly adopted as the foundations for tall buildings and heavy infrastructure projects all over the world. Many findings have been gained fro

    Jan 1, 2006

  • NIOSH
    OFR-28-73 Muffler For Pneumatic Drill

    By Robert E. Manning

    At present, a need exists for more effective noise control in the coal-mining industry. In particular, new muffler designs with the required acoustic performance are needed for percussive pneumatic dr

    Jan 1, 1973

  • SME
    Are Estimators Getting It Right? Comparing Actual And Estimated Costs

    By J. Leinart

    As is readily apparent, the reliability of the early-stage costs estimated for any mining project are critical to the viability of that project. An estimate too high might leave a potentially profitab

    Feb 27, 2013