Search Documents

  • DFI
    Seal Slab / Steel Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen

    Jan 1, 2013

  • IIMP
    Riesgos ambientales asociados a depósitos de relaves inestables

    By Luis Haro

    Puesto que el deslizamiento de relaves constituye uno de los principales riesgos para la vida y seguridad de los embalses, se desarrolló un programa que rehabilite los depósitos de los relaves a travé

    Sep 13, 2001

  • CIM
    A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine Areas

    By Anil K. Beersing

    Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring

    Apr 1, 2005

  • SME-ICGCM
    The Effect Of Gas Pressure On Coal Strength

    By Najdat I. Aziz

    There are different schools of thoughts about the influence of gas pressure on coal strength. Researchers have reached contradictory results with regard to the effect of confining gas pressure on tens

    Jan 1, 1996

  • AUSIMM
    Towards More Sustainable Minefills - Replacement of Ordinary Portland Cement with Geopolymer Cements

    By G F. Brent, R D. Hart, C Carr, F Felipe

    In underground operations, where copper, gold and other metals are mined, the open stopes can be backfilled to stabilise surrounding workings. This fill may consist of tailings from the processing pla

    Jan 1, 2007

  • SME
    An Empirical Study Of Effects Of Mesh Selection Procedures On Efficiency Of Mine Ventilation Analysis Methods

    By J. H. Kim

    Since the Hardy Cross numerical algorithm was applied to the solution of mine ventilation networks, there have been numerous developments in ventilation network analysis procedures. The Newton-Raphson

    Jan 1, 1992

  • SAIMM
    In-Pit Crusher Location as a Dynamic Location Problem

    By M. Paricheh, M. Rahmanpour

    "The cost efficiency and high reliability of semi-mobile or combined in-pit crushing-conveying (IPCC) and truck systems, compared to conventional truck-shovel systems alone, make them more attractive

    Jan 1, 2017

  • SME
    Mining Industry Responds to Crystalline Silica Regulations

    By W. J. Miles

    Many years ago, a relationship was established between dust inhalation and pneumoconiosis. Since then, various government agencies have regulated crystalline and amorphous forms of silica material in

    Jan 1, 1990

  • SME
    Acquiring Capital Funds for Coal Mining

    By Dale S. Hursh, William A. Brooks

    Introduction US dependence on external energy sources is dangerous because of unstable political situations existing in key energy exporting countries. So, recent national energy policies call for

    Jan 9, 1982

  • ISEE
    Alternative Velocity Loading Techniques and Detonations in a Production Environment

    A simple and cost effective technique to increase fragmentation and burden velocities without making major modification to the overall blast design is with ALTERNATE VELOCITY LOADING OR BOOSTERING OF

    Jan 1, 1989

  • AUSIMM
    The softening and melting behaviour of single and mixed iron ore burdens

    By B B. Du, Y N. Lu, L X. Wang, S L. Wu

    The cohesive zone in the blast furnace is largely affected by the softening and melting behaviour of ferrous burden because of its vital role in the blast furnace process. The Visual High Temperature

    Jul 24, 2017

  • SAIMM
    Phasing Out Reverberatory Furnace Operations At KCM Nkana

    By M. Natarajan, C. J. Cutler, E. Mponda

    Keywords: Pyrometallurgy, furnace, KCM Nkana, Zambia The Nkana smelter was initially commissioned in 1931, with two reverberatory furnaces, two Peirce-Smith converters, and blister copper casting

    Jan 1, 2006

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • CIM
    Petroleum Oil Refining

    By R. L. Dunsmore

    Introduction If one had been called upon to describe petroleum oil refining seventy-five years ago, he could have acceded to the request quite satisfactorily in about fifteen minutes. Fifteen years

    Jan 1, 1931

  • AUSIMM
    Internal Air Temperature Measurements in Tyres-A Major Advance in Earthmover Tyre Pressure Control

    Tyre costs constitute 20-40 per cent of the operating cost of large haulage trucks, and tyre pressure maintenance is an important factor in minimizing costs.In the past, control over the hot (built-up

    Jan 1, 1979

  • AUSIMM
    The sampling characteristics of grains contaminated by mycotoxins

    By G J. Lyman, S A. Tittlemier

    International regulations exist to manage the concentrations of mycotoxins such as Ochratoxin A (OTA) and deoxynivalenol (DON) in grains and prevent health risks from excessive exposure to OTA and DON

    May 9, 2017

  • CIM
    Upgrading of aluminum dross by selective comminution and sizing

    By K. J. Fair, H. W. Smith, D. R. Francis, J. M. Toguri

    "Bench-scale batch milling and screening tests were carried out on secondary aluminum dross 10 produce an aluminum concentrate. To complement these tests, an analysis of a commercial plant was also pe

    Jan 1, 1987

  • AUSIMM
    A Comparison of the Mechanism of Breakage in Full Scale and Laboratory Scale Grinding Mills

    By P. S. B. STEWART

    As part of a continuing study of mechanisms of breakage, the grinding at Nairne Pyrites Pty. Ltd. was traced by the addition of barytes and the results compared with parallel small scale laboratory te

    Jan 1, 1971

  • SME
    Expanding The Limitations Of The MFire Simulation Model

    In 2002 the authors updated the MFire model developed by the US Bureau of Mines. MineFire, developed by Mine Ventilation Services, Inc. (MVS), uses the MFire model to perform mine fire simulations on

    Jan 1, 2011

  • AUSIMM
    A Comparison of Massive Sulphide Deposits Forming at the PACMANUS (Manus Basin, PNG) and Jade (Okinawa Trough, South China Sea) Seafloor Hydrothermal Fields

    By R A. Binns, S Murao

    The PACMANUS and Jade deposits are two active hydrothermal fields that are forming massive sulphide deposits at the Pacific rim margin. Both are associat

    Jan 1, 1995