Search Documents

  • NIOSH
    Development Of Multiple Regression Functions For Performance Prediction Of Gob Gas Ventholes For Sealed And Active Longwall Mines

    By Heather N. Dougherty

    In the absence of values for each influencing parameter and a known relationship of input-output space, novel approaches should be implemented as proxy solutions to mathematically complicated problems

    Jan 1, 2010

  • AIME
    Corrections

    Jan 1, 1960

  • CIM
    Energy Initiatives Ontario Operations

    Ontario Operaations Mining Garson Stobie Copper Cliff North Copper Cliff South Creighton Mcreedy East Milling Clarabelle Mill Smelting Smelter Matte Processing Anode Casting Refining Co

    May 1, 2007

  • AIME
    Friday Morning Session, April 26 1940 - Minutes

    By Open-Hearth Steel

    I received a telegram yesterday from Mr. J. H. Nead saying that he regretted circumstances had come up which prevent his attending the meeting, but that arrangements have been made and Mr. T. S. Washb

    Jan 1, 1940

  • NIOSH
    RI 8105 Ferric Chloride-Brine Leaching of Galena Concentrate

    By F. P. Haver

    Primary lead is produced in the United States by the pyrometallurgical smelting of lead sulfide (galena, PbS) concentrates, which poses sulfur dioxide and lead air pollution control problems. The Fede

    Jan 1, 1976

  • NIOSH
    RI 8563 Recovery of Byproduct Heavy Minerals From Sand and Gravel Operations in Oregon and Washington

    By G. M. Martinez

    The Bureau of Mines has investigated methods for the recovery of byproduct heavy minerals from sand and gravel operations in Oregon and Washington. These heavy minerals are not currently recovered exc

    Jan 1, 1981

  • IOM3
    Geology and genesis of Lago volcaniclastic-hosted Zn-Pb deposit, northwest Spain

    By L. Villa, O. Suarez, D. Arias, L. G. Corretge

    The deposit comprises two vertical, lenticular bodies emplaced in the allochthonous block of a Variscan thrust. Epigenetic mineralisation occurs as replacement of carbonated volcaniclastic rocks of Ca

    Jun 19, 1905

  • CIM
    Treatment of Carnallite Potash Ores by Selective Flocculation

    By Samantha Beeson, Collin Poole

    "This paper examines the development of two new selective flocculation techniques for recovering KCI values from low grade carnallite potash ore.Direct recovery of KCI was achieved using one of two mi

    Jan 1, 1997

  • NIOSH
    OFR-110(2)-84 Relationship Of Underground Diesel Engine Maintenance To Emissions - Volume II

    By Ronald Branstetter

    Gaseous and particulate exhaust emissions from 20 diesel engines in service at five underground mines were measured with high accuracy instrumentation. The engines that were tested were checked for fa

    Jan 1, 1983

  • NIOSH
    Hand Force-Dependent Modeling Of The Hand-Arm Under Zh-Axis Vibration - Introduction

    By P. -E. Boileau, P. Marcotte, Y. Aldien, S. Rakheja

    A number of biodynamic models of the hand-arm system have evolved on the basis of measured driving-point mechanical impedance (DPMI) responses to facilitate analyses of the coupled hand-tool system [1

    Jan 6, 2006

  • DFI
    Static Uplift and Lateral Load Testing of Piles for a New Power Plant

    By José L. M. Clemente, John R. Davie

    "Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi

    Jan 1, 2014

  • CIM
    Two-Mass Vibrating Screens for High Tonnage Applications

    By Steve Massman, Edward Wipf, Gary Beerkircher

    "As mine size and tonnage continues to increase, material handling/processing equipment has also increased in size with 400 MT haul trucks, 2000 KW crushers, 12 M SAG/AG mills, 8.5 M ball mills, 3000

    Jan 1, 2017

  • CIM
    Mass Balances in Mill Metallurgical Operations

    By R. Tipman, T. C. Burnett

    "A general computer program has been written to calculate material balances using multiple regression techniques. The program can handle metal assays or size distribution data obtained in multiple sur

    Jan 1, 1978

  • TMS
    Unsteady State Heat Transfer Analysis Of Lower Parts Of Blast Furnace With Liquid Flow

    By Tsunehisa Nishimura

    Stable operation of the blast furnace needs adequate control of the lower part. To clarify the behavior of the lower part of the blast furnace with accurate consideration of the property of slag and i

    Jan 1, 2006

  • AUSIMM
    Beneficiation of Coal Fines from Tailing Ponds of Tuntbilek Washing Plant

    Beneficiation of Coal Fines from Tailing Ponds of Tuntbilek Washing Plant

    Sep 13, 2010

  • IOM3
    Highwall mining: practical estimates of coal-seam strength and the design of slender pillars

    To maximise recovery by highwall mining, pillars must be designed which are long, slender and of relatively low width-to-height ratios. The strength of pillars with width/height less than 2 depends pr

    Jun 21, 1905

  • NIOSH
    RI 7501 Autoclave And Ambient Pressure Leaching Of Lake Superior Manganiferous Ores

    By Vance G. Leak

    Leaching of manganese from low-grade Minnesota ores was studied over the temperature range 25° to 225° C at atmospheric and elevated pressures to demonstrate that good recoveries of manganese could be

    Jan 1, 1971

  • SME
    Construction Aggregates Industry Trends Inspire Innovation

    By Bruce W. Woolpert

    During the SME Board of Directors’ midyear meeting in Monterey, CA Aug. 25, I discussed trends in the construction aggregates industry. Many construction-material suppliers may not have yet fully int

    Jan 1, 2002

  • AUSIMM
    Computerised Mineral Data

    Three computerised sets of minerals information are being developed by New Zealand Geological Survey in co-operation with the Resource Management and Mining group of the Ministry of Energy: 1. Geolog

    Jan 1, 1986

  • CIM
    Effluent Treatment with Toxicity Control at Placer Dome (CLA)’S Dome Mine

    By Trevor Yeomans, David Yaschyshyn

    "Placer Dome (CLA) operates the 90-year-old Dome Mine, in South Porcupine, Ontario.The milling operation currently processes 5 million tons of ore per year, from both the underground and Open pit mini