Search Documents

  • AUSIMM
    The Zinc Refluxer at Cockle Creek (c0e1d8b7-f87d-4e4a-82d7-04847e44425f)

    Plant based on the New Jersey refluxing process was installed at the Cockle Creek Works of Sulphide Corporation Pty. Ltd. to refine portion of the zinc output from the Imperial Smelting furnace.Refini

    Jan 1, 1970

  • ISEE
    Trench Blasting Guidelines & Pitfalls

    By Vic Sterner

    As cities and towns continue to grow, the need to install sewer, water, gas and other utilities becomes a necessity and the blasting of trenches for these service lines probably constitutes one of the

    Jan 1, 2004

  • AUSIMM
    Increasing Grinding Circuit Robustness with Advanced Process Control

    By A Rantala, K Aberkrom, O Haavisto, P Blanz

    More complex ore bodies with lowering grades increase the challenges of maintaining high throughput, energy efficiency and required particle size for optimal downstream processing in grinding circuits

    Sep 7, 2015

  • AUSIMM
    Alluvial Platinum-Group Minerals in Southern New Zealand

    Platinum-group minerals (PGM) are recorded from a number of localities along theWaiau River, western Southland, and the south coast of the South Island, New Zealand. At each locality, small amounts of

    Jan 1, 1995

  • CIM
    The Use of Design of Experimentation Software in Laboratory Testing and Plant Optimization

    By Corby G. Anderson

    "Laboratory testing, plant optimization, and the interpretation and application of metallurgical technologies can be tedious, time consuming and costly. This paper outlines the use of proven statistic

    Jan 1, 2006

  • ISEE
    Presplitting and Controlled Blasting Techniques

    The objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.

    Jan 1, 1990

  • NIOSH
    RI 5441 Damping Capacity--Its Measurement And Significance ? Summary

    By J. W. Jensen

    This report was prepared as a background reference for future publica¬tions concerning the damping capacity of metals and alloys. It contains a broad description of the theory and methods of measuring

    Jan 1, 1959

  • AUSIMM
    Teach Yourself Economic Evaluation

    By P B. Card

    "The website www.economicevaluation.com.au, which had its origins at the Project Evaluation Conference 2009, provides a free way for industry professionals to teach themselves economic evaluation. At

    Mar 8, 2016

  • AUSIMM
    Evaluation of Remote Sensing Technology as a Tool for Mining Applications

    By D Laurence, L Ge

    This paper demonstrates use of remotely sensed imagery in promoting sustainable mining. Remote sensing technology can be used during all phases of a mining project û from evaluating the resource, to m

    Jan 1, 2009

  • NIOSH
    RI 4333 Zinc Smelting In The Horizontal Retort Fired With Natural Gas 1. Development Of Firing Schedules

    By G. L. Oldright

    The Metallurgical Branch of the Bureau of Mines, as a part of its duties under the Organic Act, works to prevent wastes in industry and to disuse inmate information on the fundamentals of metallurgica

    Jan 1, 1948

  • SME
    Investigations on the Charge Motion and Breakage Effect of the Magnetic Liner Mill Using DEM Mining, Metallurgy and Exploration (9cf37b4b-e4a2-4dea-af46-58cb4a935ca1)

    By Jue Kou, Lei Yu, Bern Klein, Lusheng Zhou, Chunbao Sun, Genzhuang Li, Reem Roufail, Amit Kumar

    Magnetic liners can improve the performance of ball mills by increasing grinding efficiency, extending service life, and reducing maintenance costs. Despite their importance, the fundamental understan

  • SME
    Investigations on the Charge Motion and Breakage Effect of the Magnetic Liner Mill Using DEM

    By Jue Kou, Lei Yu, Bern Klein, Lusheng Zhou, Chunbao Sun, Genzhuang Li, Reem Roufail, Amit Kumar

    Magnetic liners can improve the performance of ball mills by increasing grinding efficiency, extending service life, and reducing maintenance costs. Despite their importance, the fundamental understan

    Jun 12, 2019

  • SME
    Investigations on the Charge Motion and Breakage Effect of the Magnetic Liner Mill Using DEM Mining, Metallurgy and Exploration

    By Jue Kou, Lei Yu, Bern Klein, Lusheng Zhou, Chunbao Sun, Genzhuang Li, Reem Roufail, Amit Kumar

    Magnetic liners can improve the performance of ball mills by increasing grinding efficiency, extending service life, and reducing maintenance costs. Despite their importance, the fundamental understan

  • NIOSH
    RI 7716 Use Of Cryogens To Reclaim Nonferrous Scrap Metals

    By E. G. Valdez

    Three cryogenic systems that utilized liquid nitrogen, dry ice, and methanol with dry ice were investigated in conjunction with crushing and classifying techniques. The systems were used to aid in sep

    Jan 1, 1973

  • AUSIMM
    Operating Experience with Gasification Plant, Morwell

    Yallourn brown coal and its characteristics have been the subject of innumerable papers and discussions. The Lurgi process adopted for the production of Towns gas by the gasification of brown coal has

    Jan 1, 1960

  • NIOSH
    OFR-42(1)-74 Protection And Troubleshooting Of Coalmine Electrical Cables - Shuttle Car Reel Test Unit - I. Introduction

    Severe whipping of shuttle car trailing cables occurs when the car stops suddenly or reverses direction. This causes cable damage, and can seriously injure personnel near the cable. FMC has contra

    Jan 1, 1972

  • SAIMM
    Recovery Of Cobalt From Slag In A DC Arc Furnace At Chambishi, Zambia

    By R. T. Jones

    The 20 Mt reverberatory furnace slag dump at Nkana in Zambia contains a substantial quantity of cobalt. A 40 MW DC arc furnace has been built at Chambishi for the purpose of recovering cobalt from the

    Jan 1, 2002

  • CIM
    Environmental planning in mine waste management — The Huckleberry Mines experience (CIM BULLETIN)

    By H. F. Letient, D. C. Johnson

    At the 25th Annual B.C. Mine Reclamation Symposium in September 2001, Huckleberry Mines Limited received the Jake MacDonald Reclamation Award for its exemplary mine waste management plan, conceived to

    Jan 1, 2004

  • IOM3
    Ore reserves: the mining aspects

    By H. K. Taylor

    Ore reserves are inadequately defined. Geological reconnaissance and pre-feasibility mining work generate a broad range of valid tonnage estimates, many published for the benefit of various interests,

    Sep 1, 1991

  • CIM
    The Cigar Lake project - mining, ore handling and milling (1463a4ec-6903-4c1d-b800-831570ba9799)

    By C. R. Edwards

    "The Cigar Lake project will develop the world’s second largest high grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U

    Jan 1, 2002