Subsidence analysis and prediction based on a real caseBy B. Solar Menéndez, M. B. Díaz Aguado, I. Á. Fernández, C. González Nicieza
The analysis of subsidence due to the opening of an underground void (mining, water exploitation or civil works hole) is a problem usually hard to solve. First of all, it requires a predictive model,
Jan 1, 2003
-
On Localizing Uniform Conditioning EstimatesBy O. Rondon
Localized uniform conditioning is a technique developed to spatially locate selective mining unit grades that have been derived using uniform conditioning for the assessment of recoverable resources.
Jan 1, 2014
-
Correlations of Grinding Mill Structural Design ProceduresBy V. Svalbonas
When the Trelleborg Divisions of Boliden Allis and Mineral Processing Systems (MPSI) merged, a unique opportunity occurred for two independent mill fabricators to compare design pro¬cedures and the re
Jan 1, 1992
-
Predicting Nickel Recoveries at the Thompson Mill from Feed MineralogyBy F. D. Ford, Z. Dai, A. Byers
Manitoba Mining and Milling operations consist of three underground mines (Thompson T1, T3 and Birchtree), feeding the Thompson Mill. Three years ago, a collaborative effort involving Mines Exploratio
Jan 1, 2015
-
A Novel Approach To The Performance Evaluation Of Driven Prestressed Concrete Piles And Bored Cast-In-Place PilesBy Sridhar Krishnan
This paper presents the results of a comprehensive pre-production pile testing programme for the US$ 800 million 1400MW Coal-Fired Jimah Power Plant Project in Negeri Sembilan, Malaysia. The testing p
Jan 1, 2006
-
Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration - SpringerBy Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer
Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph
-
Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and ExplorationBy Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer
Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph
-
Small Scale Carbonization and Coke Studies in Coalfield Exploration and Mine DevelopmentReliable and discriminating small, laboratory scale methods of study have been developed and used successfully in the critical evaluation and interpretation of the carbonization characteristics of a w
Jan 1, 1969
-
Geophysical Surveys in Eastern VictoriaBy Rose W. J
Geophysical prospecting was first recognized in Australia as an important aid to mining enterprises in 1927, when, on the suggestion of Sir Herbert Gepp, the "Imperial Geophysical Experimental Su
Jan 1, 1933
-
RI 3545 Progress Reports - Metallurgical Division ? 41. Matte Smelting Of Manganese ? IntroductionBy C. E. Wood
Because of the renewed importance of the strategic metal manganese the Bureau of Mines in conducting further research on pyrometallurgical methods of beneficiating manganiferous iron ores and low-grad
Jan 1, 1940
-
Cleaner Tail Recycling to Minimize Phosphate LossBy A. K. Fallaw, G. Wang, L. R. Moore, S. Dobson, Y. Xiong, J. Gu
"As ores degrade, mining techniques and chemistries change to meet market demand and maintain product quality. The balance of recovery and grade is a significant challenge in the Crago Process where a
Jan 1, 2016
-
OFR-79-93 Vol. II Cross-Ridge Mountaintop Mining Demonstration - Volume IIBy Robert L. Lappi
Volume I of this report described the demonstration of cross-ridge mountaintop coal mining. This document, Volume II, is intended for use as a supporting document to Volume I. This report describes th
Jan 1, 1984
-
Evaluation Of Movement Data And Ground Conditions For The Åknes Rock SlideBy V Kveldsvik, N Ragvin, T Eiken, G Grøneng, G V. Ganerød
Catastrophic rock slope failures have caused destructive tsunamis in Norwegian fjords. At the Åknes rock slope the tsunami generating potential is large due to the potential large volume involved in a
Jan 1, 2006
-
Pilot-Scale Frother Testing at Highland Valley CopperBy S. D. D. Welsby
"A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over
Jan 1, 2014
-
A Cyclone Furnace for Slag FumingLaboratory scale equipment was developed to recover zinc as oxide fume from granulated lead blast furnace slag. The cyclone furnace process is characterised by high treatment rates combined with conti
Jan 1, 1964
-
Some Important Factors Controlling the Crystal Macrostructure of Copper Wire BarsBy L. H. DeWald
During the examination of various commercial brands of copper wire bars, which had exhibited different degrees of adaptability for being drawn into fine gages of wire by the present-day high speed mac
Jan 1, 1931
-
Deep neural network models for improving truck productivity prediction in openpit minesBy Wei Victor Liu, Omer Faruk Ugurlu, Chengkai Fan, Bei Jiang
Accurate prediction of truck productivity plays a pivotal role in improving the efficiency and profitability of openpit mining operations. This paper proposes a deep neural network (DNN) model to over
Jul 1, 2024
-
Quantification Of Stope Fracture Zone Behaviour In Deep Level Gold MinesBy J. A. L. Napier
This paper presents an overview of work carried out by the CSIR Division of Mining Technology and formerly by the Chamber of Mines Research Organization (COMRO) to quantify the behaviour of the stope
Jan 1, 1997
-
Technology, Economics, Government, and ProgressBy Harold G. Moulton
IT is highly significant that engineers should seriously consider the interrelations of technology, economics, and government. It is indicative of the emergence of maladjustments and problems that per
Jan 1, 1938
-
Differences of Opinion in the Recent Geological Report on Broken Hill, N.S.W.IN the recent monograph on Broken Hill, N.S.W., by E. C. Andrews,* two independent petrological reports appear as Appendices 1 and n, by W. R. Browne and F. L. Stillwell respectively. In these conside
Jan 1, 1924