Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Estilos de mineralización en el Complejo PascoBy Hebert Arias, Christian Mendoza, Mervin Tapia
El Complejo Pasco —ubicado en la Cordillera Oriental de los Andes de la sierra central del Perú, en el distrito de San Francisco de Asís, provincia y departamento de Pasco— está constituido por las un
May 22, 2019
-
Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)By Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2013
-
The Reliability Of Conventional Design Methods For Driven Piles In Sand - SynopsisBy Kenneth Gavin
The accurate prediction of the shaft capacity of drives piles in sand continues to present problems for foundation designers. Research in this field has been carried out for many years and has yielded
Jan 1, 1996
-
Slurry Shield Tunneling in Portland—West Side CSO Tunnel ProjectBy James J. Kabat, James A. McDonald
Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial mat
Jan 1, 2007
-
53rd Annual Conference of Metallurgists - Conference Proceedings"WELCOME/BIENVENUE TO THE COM 2014 IN BEAUTIFUL VANCOUVER!On behalf of the organizing committee, I would like to extend my thanks to you for participating in this year’s Conference of Metallurgists. R
Jan 1, 2014
-
The Geology of the Golden Cross Mine, Waihi, New ZealandBy P C. Couper, P C. Keall, S J. Mathews, A Francis
An epithermal gold-silver deposit is presently being developed at the Golden Cross Mine in the Waitekauri Valley, 8 km northwest of Waihi, New Zealand. Highest grade mineralisation underground is main
Jan 1, 1991
-
Leaching Characteristics of Australian Uranium OresThe leaching characteristics of a number of Australian uranium ores were determined under acid and alkaline conditions. Ores from the Ranger, Nabarlek and Koongarra deposits in the Northern Territory
Jan 1, 1979
-
Relationships between comminution energy and product size for a magnetite ore - SynopsisAn extensive laboratory grinding study was carried out on a magnetite ore in order to assess the grinding behaviour of magnetic concentrate and tail from low intensity magnetic separation (LIMS).The t
Jan 1, 2010
-
-
Automated Quantitative Micro-Mineralogical Characterization For Environmental ApplicationsCharacterization of ore and waste-rock material using automated quantitative micro-mineralogical techniques (e.g., QEMSCAN® and MLA) has the potential to complement traditional acid-base accounting an
Feb 27, 2013
-
Isothermal Reduction Kinetics and Mechanism of Pre-oxidized Ilmenite Mining, Metallurgy and ExplorationBy Mingyang Li, Yan Lv, Xiaolong Ma, Xudong Gao, Jie Zhao, Yingyi Zhang
The reduction process of pre-oxidized ilmenite concentrate powder in 30%CO–70%N2 atmosphere was characterized by thermogravimetric and differential thermogravimetric (TG-DTG) analysis system at the te
-
Isothermal Reduction Kinetics and Mechanism of Pre-oxidized Ilmenite Mining, Metallurgy and Exploration (9bd09701-4fce-4153-aadd-0723612382a9)By Mingyang Li, Yan Lv, Xiaolong Ma, Xudong Gao, Jie Zhao, Yingyi Zhang
The reduction process of pre-oxidized ilmenite concentrate powder in 30%CO–70%N2 atmosphere was characterized by thermogravimetric and differential thermogravimetric (TG-DTG) analysis system at the te
-
Planning For Value In The Mining Value Chain - Mine Planning To Deliver Value - A Complex ProblemBy A. Vorster
The objective with mine planning is to consistently deliver production conforming to quality and quantity requirements throughout the life of the mine. The complexity of the operational context of the
Jan 1, 2001
-
Modelling and Determining the Technical Efficiency of a Surface Coal Mine Supply ChainBy M. D. Budeba
Determining the efficiency of a surface coal mine operation is an essential activity, which can help in deciding on the optimal use of input resources, including effective capital allocation, in gener
Jan 1, 2014
-
MLA: The New Sherlock Holmes of the Mining and Metallurgical Engineering IndustryBy Paul Miranda, Corby Anderson
"The Center for Advanced Mineral and Metallurgical Processing (CAMP) has recently obtained a Mineral Liberation Analyzer (MLA). CAMP has utilized the technology for several projects with excellent res
Jan 1, 2007
-
Development of a Cadmium Removal Process for Vale’s Long Harbour Hydrometallurgy PlantBy P. C. Holloway, A. Tshilombo, T. Xue, M. J. Collins, R. Lopetinsky, I. Mihaylov, I. M. Masters
The Voisey’s Bay deposit contains a trace amount of cadmium, which reports to solution during pressure leaching of the nickel concentrate at Vale’s Long Harbour Hydrometallurgy Plant, and must be remo
Jan 1, 2019
-
Empirical Approaches For Weak Rock Masses (15cf9004-760f-47b2-8d56-8025fc15bd1d)By Rimas Pakalnis, Tom Brady, Lewis Martin
A major focus of ground control research presently being conducted by the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) is to incorporate weak rock m
-
Static-Load Hydraulic Piledriving: An Alternative System For Noise & Vibration-Sensitive Applications ? IntroductionBy Robert A. Field
Static-Load Piledriving systems utilize hydraulic push to advance piles into the ground. Dynamic systems (ie. hammers and vibratory equipment) utilize impact, or vibration, to advance the piles. S
Jan 1, 1995
-
A Depositional Model for the Morley Coal Measures, Ohai Coalfield, Southland - Applications to Coal Exploration and MiningThe Morley Coal Measures (Upper Cretaceous) at Ohai Coalfield were deposited in an intermontane basin alluvial environment of entirely terrestrial aspect. Within this regional setting, three distinct
Jan 1, 1985
-
Seismic Retrofit Of Bridges; Geotechnical Design Considerations And Case HistoryBy Aly M. Mohammad
State and federal agencies during rehabilitation of existing bridges may require the existing bridges to be evaluated under seismic conditions. If the bridge does not perform under the seismic event,
Jan 1, 2006