Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Application of Chain Conveyor Cutter (Ccc) to Highwall Mininig System

    By Takashi Sasaoka

    Chain Conveyor Cutter (CCC) is a chainsaw-type machine and originally developed for the construction of underground walls and/or ground improvements. CCC was developed from the accumulated technology

    Jan 1, 2012

  • SME-ICGCM
    Multiple Seam Mining Feasibility in the Illinois Basin (USA): LaModel Stress Analysis Programs

    By Rebecca Hardy

    The escalating demand for coal, in addition to the steady depletion of reserves, has produced increasingly difficult mining conditions for coal mining companies within the United States, resulting in

    Jan 1, 2006

  • SME-ICGCM
    Feasibility Study And Design Of A New Underground Coal Mine Developed From Open Cut Highwall In Indonesia (25d3d094-fa9d-4970-a166-6a4fe20badce)

    By Takashi Sasaoka

    About 200 M tons of coal were imported into Japan in 2007 and Indonesia was its second largest exporter, accounting for about 30 M tons (12% of the total imported coal). Indonesia produced about 200 M

    Jan 1, 2009

  • SME-ICGCM
    Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies

    By David H. Tang

    Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite

    Jan 1, 1990

  • SME-ICGCM
    Deriving Input Parameters for Numerical Modeling of Fully Resin Grouted Rock Bolts

    By Michael Alber

    Resin grouted rock bolts are the major support measure in coal mining. They are rather easy and foolproof to install, take immediately load and are the least time consuming support measure for control

    Jan 1, 2006

  • SME-ICGCM
    Aspects of Chain Pillar Design in Relation to Longwall Mining

    By B Whittaker

    The paper examines the role of chain pillars in longwall mining layouts as used in several countries. The application of chain pillars in relation to their expected design role is discussed. An import

    Jan 1, 1987

  • SME-ICGCM
    Prediction of surface movement with emphasis on horizontal deformation due to mining

    By Mao Bai

    In predicting the integrity of under-mined structures, surface horizontal displacements and curvatures are frequently of greater importance than the more homogeneous vertical displacements. Accurate e

    Jan 1, 1989

  • SME-ICGCM
    Towards a Real Time Response to Changing Strata Conditions on a Longwall

    By P. Trueman

    A project is underway to convert a validated methodology to a system that will permit the near real time interpretation of loading data from longwall powered supports, allowing rapid adaptation of min

    Jan 1, 2006

  • SME-ICGCM
    Correlation of Acoustic Emission (A.E.) with Physical and Mechanical Properties of Different Types of Rock and Coal Specimens

    By Brijes Mishra

    This paper presents a correlation of acoustic emission (A.E.) with physical and mechanical properties of different types of rock and coal specimens which were tested under aegis of a consultancy proje

    Jan 1, 2006

  • SME-ICGCM
    Improved Source Location And Evaluation Of Seismic Events Over A Deep Coal Mine

    By D. S. Choi

    This paper describes an improved source location technique for microseismic events related to coal mining. A system of non- linear distance equations is solved with the use of the Newton-Raphson metho

    Jan 1, 1990

  • SME-ICGCM
    Development and Field Tests of Look-Ahead Radar and Horizon Sensing for Coal Cutting Drums

    By Gerald L. Stolarczyk

    Safe and efficient coal extraction requires advanced radar subsystems that can be mounted on cutting drums of coal cutting machines. A look-ahead radar (LAR) must solve the radio geophysics problem o

    Jan 1, 2006

  • SME-ICGCM
    Roof Bolter Rocker Pad Deflector Systems (6ff5d1f9-2211-4169-8a90-2ad9493ee24a)

    By Arnold Hammons

    Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby

    Jan 1, 2009

  • SME-ICGCM
    Coal Mine Geology in the U.S. Coal Fields: A State-of-the-Art-Review

    By Frank E. Chase

    During the past quarter century, coal mine geologists have evolved from providing a qualitative description of drill core and coal reserves into quantitative geotechnical specialists who bridge the ga

    Jan 1, 2006

  • SME-ICGCM
    A Simple Tool to Measure Stress in Mine Backfill

    By A. MacG. Robertson

    A cone penetrometer has been used to assess the level of stress existing in hydraulically placed mine backill. The test apparatus was fabricated at the mine and consisted of a steel cone, connector ro

    Jan 1, 1986

  • SME-ICGCM
    Global Trends in Coal Mine Horizontal Stress Measurements

    By Christopher Mark

    Knowledge of in situ stresses is fundamental to many studies in earth sciences, and coal mine ground control is no exception. During the past 20 years, it has become clear that horizontal stress is

    Jan 1, 2008

  • SME-ICGCM
    Effects of Rock/Coal Interface Property on Coal Pillar Strength

    By Jun Lu

    There are many factors affecting the strength of pillar, including width-to-height (W/H) ratio, mechanical properties of coal and surrounding rocks, property of partings in the coal, and the interface

    Jan 1, 2008

  • SME-ICGCM
    On Rock Failure Criteria for Coal Measure Rocks

    By Murali Gadde

    Design of underground excavations in coal mines involves two major tasks: estimation of stresses and determination of rock mass strength. Owing to the complicated nature of rock mass, progress in its

    Jan 1, 2007

  • SME-ICGCM
    Application Of Short-Term Time-Dependent Plate Loading Tests For Estimation Of In-Situ Elastic And Viscous Parameters Of Weak Floor Strata

    By Gang Chen

    This paper explores the possibility of using short-term time-dependent plate loading tests to estimate the elastic and viscoelastic parameters of the weak floor strata typically associated with coal s

    Jan 1, 1990

  • SME-ICGCM
    Development of Timedependent Surface Subsidence Over the Total Extractions Areas of the Potash Beds Stoped with Interchamber Yield Pillars

    By M. P. Nesterov

    The method of predicting the time-dependent surface subsidence for gently-inclined potash deposits where total extraction using various sizes of yielding bamier pillars was discussed.

    Jan 1, 1998

  • SME-ICGCM
    Upgraded Comprehensive and Integrated Subsidence Prediction Model CISPM - W

    By Yi Luo

    In dealing with various subsidence cases, accurate predictions of mining induced subsidence are the basis for correct assessment of subsidence influences and subsequent mitigation efforts. There is a

    Jan 1, 2008