Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Mine Stability Evaluation From Microseismic Activity (5cc6a13d-fd4e-4c74-a7d1-2213b7f2a1da)

    By Brian R. A. Wood

    Any defect activity resulting from an applied stimulus on a structure will generate a stress wave which travels in the medium under the laws of acoustics, thus the name of acoustic emission (AE). AE t

    Jan 1, 1992

  • SME-ICGCM
    J?Crete: An Engineered Cementitious Composite Rock Coating

    By Alan A. Campoli

    The mining industry has long been searching for an effective structural application that prevents weathering and falls of loose rock, debris, and sediment. J-Crete is a fiber-reinforced, engineered, c

    Jan 1, 2012

  • SME-ICGCM
    Potential Of A Void Diffusion Model To Predict Longwall Subsidence In The Illinois Coal Basin

    In this paper, the authors attempt to apply a simplified non-homogeneous void diffusion model (NHVDM) to predict surface subsidence for longwall mining in Illinois. A generalized error function subsid

    Jan 1, 1990

  • SME-ICGCM
    Mining Through In-panel Entries and Full-face Recovery Room Without

    By John Smyth

    Mining through in panel entries and the full face recovery method has been successfully practiced at U.S. Stwl, Mine 50. Suppat of the cut-through entries and recovery room is critical. Traditionally,

    Jan 1, 1998

  • SME-ICGCM
    Assessment and Mitigation of Subsidence Effects on a Tall Self-Supporting and Free-Standing Communication Tower

    By Yi Luo

    A longwall mining operation went under a tall, self-supporting and free-standing wireless communication transmission tower. In anticipation of that the ground subsidence process might affect the trans

    Jan 1, 2008

  • SME-ICGCM
    Outcomes of the Landmark Longwall Automation Project with Reference to Ground Control Issues

    By Michael Kelly

    Inertial navigation technology has, for the first time, allowed the position of a longwall shearer to be mapped in three dimensions. Following the success of the technology in highwall mining and succ

    Jan 1, 2005

  • SME-ICGCM
    The Forensics Of Underground Roof Falls (c5c31282-77d4-44b1-8aa1-d01534eb267d)

    By Steve Tadolini

    Underground roof falls can have devastating effects on the safety of operations personnel, and equipment, and seriously impact production. Immediate steps are usually taken to danger off and secure t

    Jan 1, 2009

  • SME-ICGCM
    Weak Floor Stability During Perimeter Mining In The Illinois Basin Coal Mines (40fab914-2257-4efe-b587-9358b9303f41)

    By Murali M. Gadde

    Perimeter mining is a special form of very productive partial extraction method practiced at some mines in the United States. In the Illinois Basin mines where all major coal seams have weak underclay

    Jan 1, 2009

  • SME-ICGCM
    Subsidence Misconceptions And Myths

    By Richard E. Gray

    Subsidence due to coal mining is poorly understood by non-specialists. This has led to numerous misconceptions and myths based on limited observations and lack of knowledge. The three most common are:

    Jan 1, 1996

  • SME-ICGCM
    Integrated Instrumentation Method of Stress State, Material Property, and Deformation Measurement for Stress Control Method of Mining

    By Shosei Serata

    The application of conventional rock mechanics methods to complex ground is very difficult. Yet. In most underground mining, the ground is complex. Therefore. conventional methods are not only difficu

    Jan 1, 1986

  • SME-ICGCM
    Techniques To Investigate Subsidence Events Over Inactive Room-And-Pillar Mines (f8b483c2-2524-4334-950b-cd6315d7aeaa)

    By Yi Luo

    Subsidence events occurred over inactive room and pillar (R&P) mines, including abandoned mines or sealed portions of active mines, are classified as unplanned subsidence because of their timing and d

    Jan 1, 2009

  • SME-ICGCM
    Calcium Aluminate Kiders in Hard Rock and Coal Mining

    By Bernard Woolley

    The history of the use of calcium aluminates in mining is discussed including a review of very rapid hardening concretes, anchoring using cement capsules and pumped ground control systems. Specific re

    Jan 1, 1997

  • SME-ICGCM
    Rapid Assessment Of Gateroad Roof Stability By Simple Monitoring Techniques

    By Peter Cain

    In response to the appearance of excessive convergence of bolted gateroads in the front abutment zone of retreating coal faces at Phalen Colliery, staff from the CANMET Cape Breton Coal Research Labor

    Jan 1, 1996

  • SME-ICGCM
    Surface damage due to longwall mining - A case study

    By P. M. Lin

    A subsidence monitoring program over a longwall panel was established (1) to explore the impacts of dynamic subsidence on the ground surface and structures and (2) to correlate the movements between t

    Jan 1, 1989

  • SME-ICGCM
    Technique To Measure Resultant Load Vector On Shield Supports (b937ef33-c51b-4de4-a956-dc8be749fea8)

    By Thomas M. Barczak

    The resultant load vector is the representation of the forces applied to a longwall roof support element by caving strata into a single, quantifiable measure of support resistance. The relatively comp

    Jan 1, 1984

  • SME-ICGCM
    Intrinsic Response Of Borehole Pressure Cells Laboratory Calibration And Nonlinear Fem Simulation

    By D. Su

    This paper presents the details and results of a preliminary investigation into the response of borehole pressure cells (BPCs) in soft coal. Two parallel approaches, laboratory calibration and nonline

    Jan 1, 1990

  • SME-ICGCM
    Cavability Study Of A Competent Roof - A Case Study

    By T. N. Singh

    An evaluation was made on the cavability of the roof formation of Dishergarh seam including caving sequence, caving span, and load on powered support.

    Jan 1, 1994

  • SME-ICGCM
    The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)

    By Stephen Tadolini

    A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar

    Jan 1, 2007

  • SME-ICGCM
    Development of Mains in Challenging Ground Conditions

    By Kot F. v. Unrug

    The present combination of coal market prices and reserves, situated in the Central Appalachian Coal Field, is such that mining of smaller coal reserve blocks has become economically attractive. In

    Jan 1, 2006

  • SME-ICGCM
    Calibrating the Lamodel Program for Site Specific Conditions

    By Keith A. Heasley

    The LaModel program has been used successfully in the United States for many years to design pillars to ensure global stability of pillar recovery operations. However, the recent Crandall Canyon Mine

    Jan 1, 2012