Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Hierarchical Systems Analysis Of Potential Environmental Impacts Of Aggregate Mining Activities

    By K. E. Kolm, W. H. Langer

    Developing natural aggregate resources (sand, gravel, and stone) creates environmental impacts. A systems analysis method has been designed to characterize the components of the environmental system,

    Jan 1, 2001

  • SME
    73rd Street TARP Relocation McCook Cup Reservoir: Contract 97-156-2H

    By Brent Duncan, Doug Harding, Bob Stier

    The 73rd Street Tunnel Project is part of “The Tunnel and Reservoir Plan” (TARP)also known as the Deep Tunnel Project, and is located in the Village of Bedford Park, County of McCook, State of Illinoi

    Jan 1, 2003

  • SME
    High Speed Communications In Harsh Environments

    Extending an organization?s knowledge base throughout the entire enterprise can improve operations. Until recently, though, field operations were often left out of the information loop, as extending

    Jan 1, 2009

  • SME
    Monitoring Acidophilic Microbes With Real-Time Polymerase Chain Reaction (PCR) Assays - Preprint 09-014

    By F. F. Roberto

    Many techniques that are used to characterize and monitor microbial populations associated with sulfide mineral bioleaching require the cultivation of the organisms on solid or liquid media. Chemolit

    Jan 1, 2009

  • SME
    Enhancement Of Bacterial Iron And Sulfate Respiration For In Situ Bioremediation Of Acid Mine Drainage Sites: A Case Study (9e023564-700d-405d-941a-989b38ed4fb9)

    By A. A. Bilgin

    The prevention of acid mine drainage (AMD) in situ is more attractive than down-gradient treatment alternatives that do not involve source control. AMD source control can be achieved by shifting the m

    Jan 1, 2007

  • SME
    On The Lateral Stiffness Of Gearless Mill Bearings

    By R. L. Guerguerian

    Nowadays, most grinding mills driven by a wrap-around ring motor are operating successfully. Some of the earlier problems could be attributed to the lateral stiffness and stability of their bearings.

    Jan 1, 2000

  • SME
    Exploration Review

    By D. R. Wilburn

    This summary of international mineral exploration activities for the year 2007 draws upon available information from industry, literature and U.S. Geological Survey (USGS) specialists. The summary pr

    Jan 1, 2008

  • SME
    Putting Computational Fluid Dynamics To Work On Mining And Metals Projects

    By D. M. Lane, J. M. Berkoe

    Engineers and Owners share a common desire to build reliable, efficient plants on schedule at reasonable costs. This paper describes one tool that Bechtel finds can integrate these objectives by “pu

    Jan 1, 2000

  • SME
    Mining Engineering – Shovel and Excavator Survey

    By Lane White

    In mid-April 1992, MINING ENGINEERING mailed a survey questionnaire relating to mining shovels and hydraulic excavators to 125 SME members working at surface mines or at the headquarters of companies

    Jan 1, 1992

  • SME
    Study on Strata Control Based on Pillar Stress and Surface Cracks in Shallow Multi-Seam Mining

    In order to ensure safe mining and reduce surface damage in shallow multiple-seam mining, the failure characteristics of interburden strata with different coal pillar offset distances between pillars

    Jul 28, 2020

  • SME
    Steel-Fiber-Reinforced Shotcrete For Tunnel Linings: The State Of The Art

    By Don Rose

    INTRODUCTION A number of tunnels supported and permanently lined by steel-fiber-reinforced shotcrete (SFRS) have been built in North America in the 1980s. The material is more economical than, and

    Jan 1, 1985

  • SME
    Coal Mining Subsidence and Golden Eagle Habitat

    By Val E. Payne

    Issues between resource utilization and resource preservation often develop in connection with coal mining. One such conflict exists in eastern Utah where PacifiCorp and Energy West Mining Company are

    Jan 1, 1986

  • SME
    Problem of Tunnel Construction in Himalayan Region: An Actual Encounter

    By M. D. Khattar

    Problems discussed concern encountering of high temperatures [up to 66°C] and heavy flow of water [150 L.P.S] during the construction of the 10.15 MØH.R.T. for the 2500 MW Nathpa Jhakri Hydro Power Pr

    Jan 1, 1999

  • SME
    Technological innovations that capture project value at Peña Colorada

    By R. E. Vivas, J. A. Villa

    "Located in the state of Colima, Peña Colorada is one of the largest iron ore operations in Mexico. The project is owned in equal parts by ArcelorMittal and Ternium. Though boasting a production capac

    Feb 1, 2017

  • SME
    Notes On The Efficacy Of Wet Versus Dry Screening Of Fly Ash

    By B. Valentim

    The methodology used to obtain fly ash subsamples of different sizes is generally based on wet or dry sieving methods. However, the worth of such methods is not certain if the methodology applied is n

    Jan 1, 2008

  • SME
    Design And Construction Of The Lenihan DAM Outlet Tunnel And Shaft

    By Hemang Desai

    A damaged outlet pipe beneath Lenihan Dam has restricted reservoir discharges, severely constraining the owner?s groundwater recharge program. The solution, a new outlet pipeline through the dam?s rig

  • SME
    Coal Quality And Resources In The Us Gulf Coastal Plain

    By J. C. Willett, J. R. Sanfilipo, P. D. Warwick

    The U.S. Geological Survey has conducted an assessment of the Nation’s coal deposits that potentially could be mined during the next 30 or more years. For the Gulf Coastal Plain region, the assessmen

    Jan 1, 2001

  • SME
    The Practical Use Of Sandfill In Creating Pillar Stability And Preventing Subsidence

    By W. K. Callaway

    The need to increase ore recovery and pillar stability caused the Magmont Mine staff to investigate the use of sandfill to accomplish both tasks. The use of hydraulically stowed classified mill tailin

    Jan 1, 1986

  • SME
    Dewatering for the Lenox Avenue Subway Reconstruction Project

    By Paul C. Schmall, Thomas Tuozzolo, Arthur B. Corwin

    The Lenox Avenue Reconstruction Project involved the excavation and replacement of 750 m (2,500 ft) of deteriorated subway invert concrete, 5 to 7 m (15 to20 ft) below water table in very permeable gr

    Jan 1, 2001

  • SME
    Hoisting Systems (a4900c29-13ab-4c51-a9d4-095a976b1923)

    By Christopher J. Bise

    INTRODUCTION The transportation of men, supplies, and mined material from an underground operation is the connecting link between the mine plant and the surface plant. Unless the mine is accessed by

    Jan 1, 1986