Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Automation Of Material Handling Equipment

    By G. C. Kachel

    Significant effort has been expended and considerable success has been realized m the application of instrumentation and automatic control equipment in the mining and ore processing industries. This e

    Jan 1, 1973

  • SME
    Gold Hunter Deep: From Prospect To Production

    By Glen L. Black

    Choosing a mining method for an underground orebody is a complicated and often iterative process. Advances in technology have given design teams an array of possibilities for methods and equip¬ment.

    Jan 1, 1999

  • SME
    Case History of the Orme Street Combined Trunk Relief Sewer Phase III

    By Kenneth Denton, Michael Cutts, Andrew Bursey, Eric Eisold

    Phase III of the Orme Street Combined Trunk Relief Sewer project connects two existing 2.13 m diameter combined sewers to a new 3.66 m diameter relief sewer at 7locations along a 970 m alignment in do

    Jan 1, 2003

  • SME
    Separated Kriging And Stochastic Simulation In Planning And Coal Content Production Control

    By Simona Markic

    With the aim of environment protection the program package HOMOGEN is used for realizing the planning and noxious components control in the coal produced. Using the program package PRIPREMA the divisi

    Jan 1, 1992

  • SME
    Real Time Mine Ventilation Simulation (e40463fa-8a83-443e-b343-8d29a25a8e95)

    By K. H. McDaniel

    This paper describes the development of a Windows-based interactive mine ventilation simulation software program at the Waste Isolation Pilot Plant (WIPP). To enhance the operation of the underground

    Jan 1, 1997

  • SME
    Application Of Grace Umbrella Technique To Processing Of Phosphate Rock

    By Phil W. Welch

    At first glance, the similarity between the fine grinding of cement clinker and coarse grinding done in other mineral processing industries may seem remote. However, it is interesting to note that the

    Jan 1, 1975

  • SME
    Design and Stability of Excavations

    By Robert H. Merrill

    7.1-STABILITY OF SLOPES IN SOIL AND ROCK ROBERT H. MERRILL 7.1.1-DESIGN ANALYSIS APPROACHES The analyses of slopes in soil or rock can be made through application of soil- or rock-mechanic

    Jan 1, 1973

  • SME
    Production And Marketing Of Perlite In The Western United States

    By George S. Austin

    Perlite is rhyolitic glass with 2 to 5 percent by weight (wt.%) bound water held within the silicic-glass structure. It is often distinguished by vitreous, pearly luster and concentric perlitic fractu

    Jan 1, 1995

  • SME
    Directional Rock Mass Classification: A Potential Method to Establish the Presence of Anisotropic Ground Conditions

    By Michael M. Maier

    The manuscript of this paper was not available for publication when the Proceedings went to press. Should the author elect, he may distribute copies at the time of the Symposium.

    Jan 1, 1986

  • SME
    A Respirable Dust Index For U. S. Coals ? Introduction

    By Pramod C. Thakur

    Coal is a major source of energy in the world today and will, undoubtedly, continue to be so for the next few centuries. Naturally, a great number of studies has been made of its physical and chemical

    Jan 1, 1973

  • SME
    Foundation Conditions, Cart Creek Bridge Daggett County, Utah

    By Wilbur J. Morin

    Construction of Flaming Gorge Dam in northeastern Utah necessitated the construction of a new state highway, Utah-260, to provide access to the dam and the town of Dutch John. A 550-foot arch structur

    Jan 1, 1963

  • SME
    The Use Of Mathematical Programming For Strip Mine Planning And Scheduling

    By Mark E. Gershon

    The development of long term plans and schedules for strip mines now faces many companies, especially those developing large properties in the West. The rule of mining the lowest strip ratios first, w

    Jan 1, 1983

  • SME
    Dynamic Fractured Flow Simulation Model

    By A. S. C. Owili-eger

    An efficient state-of-the-art dynamic model to simulate and predict the rate of water production in longwall coal mining operations was developed as a tool for mine planning purposes. The model can al

    Jan 1, 1987

  • SME
    Orebody and Mine Planning Assessment Based on Alternative Recoverable Resource Model Techniques and Options

    By M Aboagye, K Appau, W. Assibey-Bonsu, C. Muller

    A case study based on two recoverable resource modelling techniques (indirect and direct or localised methods) have been derived using typical feasibility study or new mine drilling data configuration

    Jun 25, 2023

  • SME
    Statistical Multivariate Analysis For Improved Plant Control at C. M. Doña Ines De Collahuasi SCM, Chile

    By F. Romero, L. Yacher, M. Orchard

    Specific software tools for Statistical Multivariate Analysis combined with real time process data were applied to Concentrator Plant at Compañía Minera Doña Inés de Collahuasi SCM in Chile, basically

    Jan 1, 2003

  • SME
    Geology And Geostatistics Applied To Grade Control At The Mercur Gold Mine, Mercur, Utah (8c954093-d991-43b1-8c09-d51a0de1ae04)

    By R. A. Metz, M. A. Bryant, J. C. Goodwin, T. B. Faddies, L. D. Kornze

    The Mercur Gold Mine is located 56 km (35 air miles) southwest of Salt Lake City in north central Utah. In July 1981 Getty Mining Company made the decision to put Mercur into production. The first gol

    Jan 1, 1992

  • SME
    Simplified Tailings Recovery Utilizing A Lewis Econosizer

    By W. M. Lewis

    Product losses to tailings ponds have long been a source of frustration for the mining and utilities industries. The utilization -of the Lewis Econosizer to recover lost products has proven to be very

    Jan 1, 1998

  • SME
    Hydrogen Sulfide Controls for Slurry Shield Tunneling in Gassy Ground Conditions - A Case History

    By Larry Taylor, Thomas Zdeb, Brian Jacobs, Dennis Jensen

    Subway tunnels proposed for the Los Angeles County Metropolitan Transportation Authority (LAMTA) East Side Extension are to be excavated below the groundwater through an area of Los Angeles, Californi

    Jan 1, 1999

  • SME
    Probabilistic Quantification Of Uncertainty In Predicting Mine Pit-Lake Water Quality (8bb3ab18-1516-4bf4-9057-f861e8ded8f0)

    By J. H. Kempton

    The scrutiny given to model predictions of pit-lake water quality has focused attention on the uncertainty associated with long-term predictions. Although comparison of probabilistic predictive modeli

    Jan 1, 1998

  • SME
    TBM's - U.S. - Where Are We - What Can We Do About It?

    By John W. Leonard

    The typical tunnel boring machine in use on today's tunnel project uses 15'2-inch diameter cutters at a nominal load of 45 kips per cutter. The cutterhead rotates at a speed of 120 over D re

    Jan 1, 1981