Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Dam foundation design considering scattering of its deformabilityBy M. Nakamura, T. Akamatsu
Embankment dams are often constructed on soft rock foundations in Japan, so it is important to precisely predict deformation of the foundations due to fill placement at the design stage. In order to a
Jan 1, 2003
-
Developments In Kimberlite Emplacement TheoryBy E. M. W. Skinner
Various models of near-surface kimberlite pipe emplacement have been proposed over the years. These include a top-down, phreatomagmatic model, a bottom-up, embryonic pipe model and three top-down expl
Jan 1, 2010
-
Blast Fragmentation Optimization At Tarkwa Gold Mine Using 6 Sigma Methodologies (eb3a89f0-790c-4421-b609-1441478ffc19)By Alexandra Amiel
Tarkwa Gold Mine is owned by Gold Fields Ghana, IAMGOLD and the Government of the Republic of Ghana in a 71%, 19% and 10% ratio. The mine is operated by Gold Fields Ghana. This large, low-grade, open
Jan 1, 2008
-
Geostatistical Simulation of a Commercial Polymetallic Nodule Mining SiteBy J. -M. Chautru
A geostatistical simulation of a typical mining site for polymetallic nodules in the North Pacific Ocean is presented. This is the first stage in the design of an industrial mining system. Two varia
Jan 1, 1987
-
Dealing with Expansive Rocks in the Los Quilos and Chacabuquito Water Tunnels Andes Mountains of Central ChileBy S. O. Castro, R. E. González, L. E. Velasco, J. M. Van Sint, P. V. Lois
Abstract Several zones with expansive rocks were encountered during construction of two tunnels of the water conduction system for the Chacabuquito Hydropower Plant, located in the Aconcagua river
Jan 1, 2003
-
Characterization and recovery of gold associated with fine, activated carbonBy J. Rowe
The attrition of activated carbon, and the loss of gold associated with it, is of significant economic importance to the operation of a CIP/CIL circuit The focus of this study was on activated carbon
Jan 1, 2009
-
Reinforced Cemented Tailings FillBy L. Dison
There are many potential uses in gold mining for an initially stiff element of backfill that will yield at a predetermined load and maintain that load to beyond a compression of 30%. Such elements cou
Jan 1, 1988
-
Mathematical And Computational Modelling Of The Dynamic Behaviour Of Direct Current Plasma Arcs - SynopsisBy Q. G. Reynolds
The problem of direct-current plasma arc behaviour, interaction, and dynamics is considered in the context of metallurgical DC arc furnace applications. Particular attention is paid to the transient f
Jan 1, 2010
-
The life, death and revival of the central Rand Goldfied - IntroductionBy M. Viljoen
South Africa has produced more than a third of the total gold mined throughout history and remains a major although, until recently, no longer the largest producer of gold. South African gold producti
Jan 1, 2009
-
The Use of Simulation Tromp Partition Curves in Developing the Flowsheet of Plant Extensions at Grootegeluk Coal MineBy T. De Lange
Extensions to the beneficiation plant at the Grootegeluk Coal Mine are currently being planned in order to provide power station coal for Escom's Matimba Power Station, presently under constructi
Jan 1, 1987
-
Dozer ‘Side-Cutting’ Versus Excavator Side-Casting on the Highwall in Dozer Bulk Push OperationsBy N. Sinclair
"In open pit dozer bulk push operations, the material left resting against the highwall after blasting poses an issue. This is because dozers cannot physically get in behind the waste to begin the bul
Jan 1, 2019
-
A Technical And Operational Audit Of The First 10 Years Of The Teniente Converter Operations At Nkana Smelter.By Milton Syamujulu
In 1994, Nkana smelter commissioned a Multimillion US$ Dollar Chilean Teniente converter (CT) in its operations in order to improve its smelting technological base. The main objective was to reduce th
Jan 1, 2005
-
Optimization of an Integrated Flowsheet for Barite ProcessingBy R. Ciccu
This paper examine the optimization of a beneficiation plant for recovering marketable barites from crude ores of different characteristics. The plant, part of a mining complex in Sardinia, consists o
Jan 1, 1987
-
Progress In Implementing The Mineral And Petroleum Resources Development Act 28 Of 2002 (MPRDA) Provisions For The Employment Of Women In Mining ? Synopsis (cabbf7d2-17cb-416d-80b6-331f47f41a80)By C. Botha
The South African democratically-elected government instituted policies and legislation that are intended to bring about change and transformation in the country and have drastically affected differen
Jan 1, 2012
-
Strategic factors and a model of enterprise restructuring in the coal industry in Europe with emphasis on experiences in a Slovenia-Velenje coal mine case - SynopsisBy E. Dervaric
The main purpose of this paper is to introduce the main strategic restructuring aspects of companies that are directly (coalmines) or indirectly (companies that depend on coalmines) linked to coalmini
Jan 1, 2008
-
Analysis of the correlation between bending phenomena and physical-mechanical and petrographic parameters of Carrara marble slabsBy C. A. Garzonio, A. M. G. Affuso
The paper describes the analyses and the tests carried out on representative slabs of white Carrara marble which have highlighted the correlation between the micro fabrics and physical and mechanical
Jan 1, 2003
-
Integrated Production Of Liquid Sulphur Dioxide And Sulphuric Acid Via A Low-Temperature Cryogenic ProcessBy M. Verri
The paper describes the design options available for the simultaneous production of liquid sulphur dioxide, via cryogenic condensation, and sulphuric acid in a sulphur-burning sulphuric acid plant. Th
Aug 1, 2013
-
Preconcentration Of UG2 Platinum Ore: Economic Benefits - SynopsisBy F. Smit
Mining and plant practices can benefit from preconcentration of UG2 platinum ores in a dense medium separation (DMS) plant. The main benefit of DMS is the selective discard of waste from the feed stre
Jan 1, 2013
-
Phase Transformations And Surface Characterization Of The Platinum-Chromium Coated System ? Synopsis (cd7f692e-c8f8-43df-8e10-650656e74357)By N. Hanief
This research involves the investigation of phase transformations in the platinum-chromium coated system. Single-layer 0.1 µm platinum coatings were deposited via electron beam deposition on 99.98 per
Jan 1, 2012
-
Expert Systems Technology: Just a Flash in the Pan?By R. Layton
Expert Systems Technology (EST) is becoming more and more widespread in both its range of applications and the public interest. It appears to be capable of performing tasks unmatched by other techniqu
Jan 1, 1987