Underground Longhole Blasting near Large-diameter Booster FansBy Norm Disley, Kingsley Hortin, Gertjan Bekkers
As part of the expansion of the Kidd Creek Mine to 2,682 meters (8800 feet) below surface, two largediameter 3000kW (4000HP) booster fans were installed at the 6000 level. Shortly after commissioning
Jan 1, 2008
-
Correlation of Shot Design Parameters to FragmentationBy Mark S. Stagg, Norman S. Smith, Rolfe E. Otterness, Stephen Rholl
Blast design parameters were studied in an attempt to quantify their relationship to rock fragmentation. The Bureau of Mines conducted a series of 29 reduced-scale shots at the University of Missouri-
Jan 1, 1991
-
Blasting to Initiate Block-Caving in SerpentineBy Terry Matts, Henry Heidrich, Cluny Randell, Carl Kottmeier
Until 1990, all production of asbestos ore at Cassiar was by open-pit methods. With the impending exhaustion of open-pit reserves, a decision was made in February 1988 to continue mining underground,
Jan 1, 1992
-
Reactivity and Spontaneous DetonationBy Alastair Torrance, Italo Onederra, Do Sun Kim, Kush Patel, Gary Cavanough
Reactivity of ammonium nitrate-based explosives is associated with the presence of sulphide in the ground reacting with explosive products and in some instances causing spontaneous reactions which can
Jan 1, 2019
-
The Comminution Theory Applied to Rock BlastingBy Carlos Agreda
A general review of the comminution theory and also the general differential equation of the comminution are described, analyzed and discussed in order to be applied to rock blasting. Some size distri
Jan 1, 1994
-
"We Agree to Provide Indemnification, Now What?"By Jeff Friedman
This paper addresses certain problems to be encountered when a blasting contractor agrees to provide indemnification. Nearly 100% of all blasting work is performed pursuant to a contractual agreement.
Jan 1, 2004
-
Be Prepared, Respond Quickly to Blast ComplaintsBy David R. Ziegler
Blasting complaints are as unpredictable as human nature. Being prepared to speak to the complainant, and having a good idea of what you should say, or what NOT to say, may affect the evolution, and
Jan 1, 1998
-
Modern Blast Engineering to Improve Mine ProfitabilityBy Josh Campbell
Modern blast engineering involves the use of modern technology to provide more efficient blasts. Through the use of improved measurement techniques more information can be obtained on many of the phys
Jan 1, 1998
-
Journal: Blastserve A Discussion Forum for ISEE Members / Effects of Line or Channel Drilling on VibrationHello, everyone. Way back in 1965, Devine and others at the US Bureau of Mines showed that a presplit fracture plane did not affect vibration levels transmitted across the plane (RI 6695).
Jan 1, 2010
-
Journal: Dynamite DazeBy S. S. Bud Jenkins
I went to an underground limestone mine recently to demonstrate the use of borehole liners. The liners were for horizontal holes in a normal “V” cut tunnel round. I hadn’t been in this mine for about
Jan 1, 2010
-
Journal:Security Matters / Procedures to Follow When Explosives Are Missing From Inventory (e.g., Disposition Unrecorded/Unknown)Prepare ATF Report of Theft or Loss (ATF Form 5400.5). A Report of Theft or Loss - Explosives Materials must be prepared when it is discovered that explosive materials are missing from inventory. Subm
Jan 1, 2008
-
Case Study Using 3-D Blast Modeling to Develop Design for Blasting in Close Proximity to Pit PumpBy Stuart Brashear, Steven Bell, Donald Smith
This Limestone site required the removal of a bench containing high quality rock located in close proximity to sump and pit pump. The sump and associated electrical box were below the bench that neede
Jan 21, 2025
-
Preparing for the Inevitable: How to respond to potential law suits and prepare for your day in courtBy G Alan Foster
Because of the marked human response to blast effects and inherent defects present in many modern structures the real possibility of being named as a defendant in a law suit faces most blasters. Until
Jan 1, 1989
-
Measurement of Pressure VariancesBy Jason Baird, Philip Mulligan, Caleb Baumgart
This report details the pressure variances, measured at four pressure sensors placed equidistant from the center of an airburst explosion, as the blast pressure from a single charge expands radially.
Jan 1, 2014
-
Drilling and Blasting PracticesBy Thomas P. Mahoney
Phelps Dodge Corporation's Tyrone Mine is a large open pit copper operation located in the southwestern corner of New Mexico. The Tyrone concentrator processes approximately 50,000 tons per day of cop
Jan 1, 1986
-
Explosives Casting Technology in Surface MiningBy D E. Shaw, J B. Case, J Gusek
Explosive casting of overburden is defined as the use of explosives in blasting to move overburden to a spoil pile without rehandling. Studies of the economic feasibility of the method, and the formul
Jan 1, 1980
-
Fewer Surprises When You Measure the SizesBy Tom C. Palangio
Commercially available online particle size analyzers (OPSA) are in their third decade of development (Palangio, T.C., 1985), (Franklin, J. A., Maerz, N.H., 1987), (Maerz, N.H., Franklin, J.A., and Co
Jan 1, 2016
-
ANFO’S Behavior in Height-To-Detonation and other Thermal Stimulus TestsBy E. Contestabile, B. von Rosen, P. Lightfoot
As part of an accident investigation ANFO was subjected to various abusive tests. A tractor-trailer carrying 18,000 kg of blasting explosives, caught fire, burned for approximately 30 minutes, and the
Jan 1, 2001
-
Blasting Techniques to Prevent Coal Loss and DamageBy Visitor Makiyi, Chris Batten
Poor coal recovery due to coal damage or loss caused by blasting can have a significant impact on a mining operation. Increasing coal recovery by reducing blast damage can provide a significant opport
Jan 21, 2025
-
Rock Spillover Interaction Between Two Active Mining SectorsBy R. J. Cefalo
Blast and mining spillover between phases or critical areas of the pit is a continuing problem in the mining industry and a safety concern for operating mines. The challenge for many mines is to produ
Jan 1, 2024