Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Safety And Economics Of Working Platforms – A Uk Perspective

    By David Corke

    The paper presents the development of Federation of Piling Specialists (FPS) calculation of rig track loading, the production of the Building Research Establishment document “Working platforms for tra

    May 1, 2022

  • DFI
    Capacity Of Piles And Settlement Of Pile Foundations

    By M. Mets

    Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo

    Jan 1, 2000

  • DFI
    Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, La

    By Antal Partos

    ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring

    Jan 1, 1992

  • DFI
    Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case History

    By Gregory A. Stephan

    A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is

    Jan 1, 2003

  • DFI
    Earth Retention Using Augered Cast-In-Place Piles - A. Introduction - 1. Applications

    By William S. Heckman

    a. When to use: high surcharges, vertical capacity required, limit noise and eliminate vibrations, low headroom, eliminate vibration induced settlements. b. Advantages: eliminates impact noise and

    Jan 1, 1997

  • DFI
    Minipiles And Postgrouted Bored Piles - Two Techniques For Special Site Conditions - Summary:

    By Stefan K. Schwank

    The paper describes the two foundation techniques - mini piles and postgrouted bored piles. The mini pile system is presented with its design and installation parameters, especially the drilling techn

    Jan 1, 1991

  • DFI
    Stresses And Settlement In Soil Due To Axially Loaded Piles And Pile Group - Synopsis :

    By Virendra Singh

    The load settlement behaviour of single pile or pile group may be obtained using computer based methods such as the finite or boundary element techniques. An alternative method of obtaining the vertic

    Jan 1, 1996

  • DFI
    Use Of Helical Piles Set Into Soft Rock For 1500-Ton Screw Press Foundation

    By David C. Kraft

    A major manufacturer and user of machine tools had the need to install a screw press machine at its plant site with the following design load requirements: (1) Vertical Compression Live Load = 2000 ki

    Jan 1, 2003

  • DFI
    Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - Introduction

    By Jon H. Gould

    This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub

    Jan 1, 1992

  • DFI
    Application Study On Non-Destructive Static Test Pile

    By Han Xuanjiang

    Through whole analysis of static testing piles information of a teaching building, this paper put for ward that when the ratioes of unload rebound amount to residual deformation and to total settlemen

    Jan 1, 1991

  • DFI
  • DFI
    Determination Of Pile Lengths Under Existing Structures

    By Mohamad Hussein

    Low strain dynamic tests are performed to evaluate the structural integrity of driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed b

    Jan 1, 1992

  • DFI
    Case History: Estimating Ground Vibrations Caused By Pile Driving

    By Tracy Brettmann

    A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat

    Jan 1, 1999

  • DFI
    Construction Of The Deepest Kelly System Foundation Piles In Kuala Lumpur, Malaysia

    By Vijayakumar Viramuthu, Martin Heinrich

    Tower of Lot L, L1 & M, Kuala Lumpur City Centre when completed would stand 700 m tall. This Mega tall Skyscraper would merely be less than 500 m away from the world tallest Twin Tower, the Petronas T

    May 1, 2022

  • DFI
    Real Time Monitoring the Historic Old South Church, Boston, Massachusetts

    By Pierre Gouvin, Michael Oakland

    "This paper covers the rapid response methods used to monitor the emergency response to damage to an historic structure. An architectural gem, the latest incarnation of the old south Church was comple

    Jan 1, 2017

  • DFI
    House & Commercial Building Foundation - Introduction & History

    By Roger A. Bullivant

    As the UK's foremost domestic foundation underpinning contractor over the last 25 years it has become abundantly clear that the size of the repair market, some £500m per annum is a significant wa

    Jan 1, 1995

  • DFI
    Cost and Technical Comparison of Non-Destructive Test Methods for Drilled Shafts

    By Ronnie Melker, Joel Webster, Daniel Belardo, Thomas Hyatt

    Quality assurance of drilled shafts is highly dependent upon the construction practices used during the excavation and concrete placement process. When performed under slurry, challenges are presented

    Jan 1, 2019

  • DFI
    Auger Pressure Grouted Displacement Piles: An Acceptable Alternative

    By Osama El-Fiky

    There are many types of deep foundations currently being used in the San Francisco Bay Area, one of the most common being driven precast, prestressed concrete (PC/PS) piles. PC/PS piles are frequently

    Jan 1, 2002

  • DFI
    List Of Exhibitors

    A technical exhibition was held in conjunction with the 4th DFI International Conference on Piling and Deep Foundations, Stresa. The exhibition was located in the ground floor of the Conference Hall.

    Jan 1, 1994

  • DFI
    Base Grouted Piles - Mr. P. M Cashman, Independent Consultant

    By W. J. Kingwell

    My comments and questions are addressed to Mr. Troughton. It seems to me that the tests were very well tailored to determine long term effects on performance of bearing piles as groundwater pressures

    Jan 1, 1991