    The Design And Formation Of Bored Displacement Piles - A United Kingdom Perspective

    By David J. Baxter

    Use of bored displacement piles has experienced significant growth in the UK piling market sector, largely due to their environmental advantages over other piling methods and through cost benefits. Bo

    Jan 1, 2006

  • DFI
    Evaluation For Stone-Column Composite Foundation In Rayleigh Wave Method

    By Zhang Baoshan

    In this paper, the forced features and dynamic behaviors of stone-column composite foundation are concisely related. The characteristics of Rayleigh wave method is summarised. This method is proposed

    Jan 1, 1991

  • DFI
    Helical Pile Foundation Anchors As A Practical Alternative

    By Dilip Khatri

    Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ

    Jan 1, 2003

  • DFI
    Settlement Behaviour Of Pile Foundation ? Synopsis

    By W. Y. Xu

    In comparison with shallow foundation, usually higher bearing capacity, smaller average settlement and better stability are the engineering characteristics of pile foundation. Besides, a smaller diffe

    Jan 1, 2010

  • DFI
    Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - Synopsis

    By A. B. Desai

    The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across

    Jan 1, 1996

  • DFI
    The Application Of Interlocked Steel Pipe Pile And Steel Sheet Pile For An Industrial Port ? Synopsis

    By M. Tominaga

    An industrial port complex was constructed on the west coast of Leyte Island The work was started in December 1981 and completed in May 1984. This port complex includes a 665 m long wharf and can acco

    Jan 1, 2010

  • DFI
    The Synergy Between Theory And Practice In Geo-Engineering

    By Bas R. Hemmen

    GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper

    Jan 1, 2006

  • DFI
    Design Parameter For Jacked Pile

    By Sugie Prawono

    Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr

    Jan 1, 1999

  • DFI
    Prediction Of Jet Grout Column Diameter In Cohesive Soil

    By Chu E. Ho

    Current methods of determining jet grout column diameters are highly empirical and site specific, and do not take into account the jet hydrodynamics and soil parameters explicitly. A theoretical model

    Jan 1, 2006

  • DFI
    The Settlements Of Buildings On Pile Foundations

    By Mait Mets

    In Estonia, the deformations monitoring of 1500 buildings are currently under investigation, buildings on pile foundations make up 10 per cent of these. In the following text we will be considering th

    Jan 1, 2002

  • DFI
  • DFI
    Differing Site Conditions

    By James J. Tansey

    A Deep Foundations Institute meeting with the University of Michigan at Ann Arbor in March of 1984 featured legal rights under Differing Site Conditions. A workshop conducted by the authors and Gerard

    Jan 1, 1985

  • DFI
    Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - Summary

    By William D. Spielvogel

    The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t

    Jan 1, 1994

  • DFI
    Maritime Structures

    By D. Waite

    The Chairman opened the session by wondering why so few papers on Maritime Structures had been received for this conference. Perhaps because the marine environment is so hostile and the access so diff

    Jan 1, 1991

  • DFI
    Single Pile Settlement Prediction And Analysis For Driven Piles

    By David R. Beadman

    The Fleming method is widely used for the analysis and prediction of single pile behaviour under maintained loading. The method does not distinguish between bored and driven piles. Driven piling avoid

    Jan 1, 2006

  • DFI
    Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing Structure

    By L. F. Albert

    The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory

    Jan 1, 1989

  • DFI
    Results Of Dynamic And Static Load Tests On Helical Piles In The Varved Clay Of Massachusetts

    By Jorge Beim

    Helical Piles are increasingly being used to support and rehabilitate structures subjected to compressive axial loads. Traditionally, empirical correlations between installation torque and load capaci

    Jan 1, 2012

  • DFI
    Soil Profiles Along The Alignment Of The I-880 Replacement Project

    By Mark A. Willian

    The purpose of this short paper is to present soil profiles and basic soils information for the portion of the I-880 Replacement Project alignment where highway structures are to be built. The informa

    Jan 1, 1996

  • DFI
    A Study in Extreme Event Large Displacement Analysis of Large Diameter Piles

    By Bret N. Lingwall, Byron Foster

    The problem of reliable extreme event modeling of large diameter piles under enormous structural or kinematic loads has gained more attention in recent years. In particular, the soil response around t

    Jan 1, 2018

  • DFI
    Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway Bridges

    By Kouichi Tomisawa

    Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri