Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Metallic fiber reinforced refractory concretes

    By T. Cutard, E. Cailleux, F. Nazaret, G. Bernhart

    This paper deals with the study of the mechanical behavior in the 20°C-900°C temperature range of refractory concretes reinforced with metallic fibers. Fibers are introduced to improve the damage resi

    Jan 1, 2004

  • CIM
    Monitoring Wear and Corrosion With Integrated Ultrasonic Transducers

    By Silvio E. Kruger

    Real time measurement of wear and corrosion provides crucial information needed to determine an optimal schedule for corrective maintenance and is a powerful tool to maximise equipment availability an

    Aug 1, 2013

  • CIM
    Characterisation of the Hydrogeological and Geochemical Behaviour of Waste Rock Piles

    By Michel Aubertin

    Mining activities can produce large volumes of waste rock, which are typically deposited in piles on the soil surface, above the water table. Such piles can cover areas of several tens of hectares and

    Nov 1, 2008

  • CIM
    The Role Of Technical Experts in Sustainability and Corporate Social Responsibility

    By Dina Aloi

    The need to be seen as responsible neighbours and good corporate citizens is a critical success criteria for mining companies. To be seen as responsible requires both achieving responsible performance

    Jan 1, 2010

  • CIM
    Processing of High-Nickel Slimes at the CCR Refinery

    By M. Doucet

    The introduction of high-nickel anodes to CCR in 2006 resulted in an increase of nickel in anodic slimes. Removal of the nickel in these slimes to below 3.0% is necessary in order to prevent slag visc

    Jan 1, 2007

  • CIM
    Spinel formation in careless induction furnace linings

    By K. D. Peaslee, J. M. Soto, IéDé Smith, A. D. Saikia

    Spinel-forming refractories reduce penetration of metal and slags through a tightening of the lining resulting from the volume expansion associated with spinel formation. Sintered spinel is often adde

    Jan 1, 2004

  • CIM
    Handling and Treatment of Custom Ore at Malartic Gold Fields Mill

    By Percy Coulter

    "GeneralThe Malartic Gold Fields mill is presently treating ore from four different companies. The ore is delivered by truck, by the shipper, and dumped into the Malartic Gold Fields ore bin. This ore

    Jan 1, 1966

  • CIM
    Microscopy for Millmen (Condensed)

    By E. P. Cadwell

    "Throughout the years Cyanamid has been a supplier of cyanide and a supplier of information to the mining industry. In general, the knowledge of mineralogy is greatly overlooked. Mineral deposits in t

    Jan 1, 1964

  • CIM
    Innovative fibre-free ladle pre-heaters at Corus Steelworks Ijmuiden

    By M. Specht, D. Pörzgen, W. Lorenz, A. /. Buhr, R. P. Racher

    The introduction of the near net-shape casting process at CORUS Staal IJmuiden in January 2000 required changes of secondary metallurgy processes including a development towards more aggressive slag c

    Jan 1, 2004

  • CIM
    Time for a Mining Truth and Reconcilitation Process in South Africa?

    By Tracy-Lynn Humby

    A recent report commissioned by the South African Chamber of Mines, Mining Vision 2030, identifies the South African mining industry?s negative legacy, its exploitation of people and the environment,

    Aug 1, 2013

  • CIM
    Gold Phytomining. Novel Developments in a Plant-based Mining System

    By Christopher W. N. Anderson

    Induced hyperaccumulation of gold by plants was first reported in 1998 by researchers from Massey University in New Zealand who proposed the idea of mining gold using plants (phytomining). Since that

    Oct 1, 2003

  • CIM
    High Grade Flotation of Copper Concentrates at Est Malarctic

    By George Hope, Dave Green, Jacques McMullen

    The Est Malartic mill has been treating massive sulphide, copper/gold ore from the Bousquet 2 mine since 1989. The need to minimize copper content in flotation tails which are leached for gold recover

    Jan 1, 1994

  • CIM
    Advanced design of refractory components for continuous casting

    By Y. Vermeulen, J. Simoes, P. Guillo, A. Di Donate

    New design techniques have been developed to optimize continuous casting (CC) refractory components. The overall objective is to increase CC productivity as well as steel quality by using optimized re

    Jan 1, 2004

  • CIM
    Using Multivariable Analisys for Cathode Quality Improvement in C. M. Doña Ines De Collahuasi Ew Plant

    By F. Romero

    In the last four years, Compañia Minera Doña Ines de Collahuasi has been working in the application of advanced multivariate statistical techniques for the improvement of the metallurgical processes.

    Jan 1, 2007

  • CIM
    The Eastern Contact Zone of the Coast Range Batholith on the Stikine River

    By Forrest A. Kerr

    The subject of the Coast Range batholith and its eastern contact zone needs no introduction to British Columbia mining men. Because of its reputed potentialities, this zone has aroused much interest.

    Jan 1, 1928

  • CIM
    The use of Rubber Liners in a Regrind Mill

    By Phil Molloy

    "In March, 1968, Skega Ruh her Liners were used to reline the shell of an 8' x 12' Allis Chalmers ball mill.This mill is used to regrind the cyanided pulp from 58i -200 mesh to 92% -200 mesh prior to

    Jan 1, 1974

  • CIM
    Prepriming at Vale?s Stobie Mine

    By Jennifer Pakula

    Productivity improvements in underground mining are becoming harder to find. Most mines quickly identify deficiencies in their processes and then struggle to make productivity gains beyond that platea

    Nov 1, 2011

  • CIM
    Ventanas Refinery: Continuous Improvement Using Conventional Technology

    By R. Abel

    During the last eight years, the Ventanas electrolytic refinery has been improving its results by applying a series of new operational practices, such as the reduction of electrode spacing from 115 mm

    Jan 1, 2007

  • CIM
    Improving Pore Water Quality in Reactive Tailings with Phosphate Mining Wastes

    By M. Kalin

    Tailings deposits are frequently the source of ground water contamination due to the transport of contaminated tailings pore-water. If amendments to tailings covers could be made to facilitate a preci

    Jan 1, 2004

  • CIM
    Effects of dolomite addition on durability of coating materials for BOF

    By S. -H. Sohn, M. -K. Cho, G. -G. Hong

    In order to evaluate the properties of coating materials for BOF, the effects of dolomites (dolomite and light burned dolomite) addition on durability of coating materials were investigated. In all co

    Jan 1, 2004