Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Government Versus Voluntary Sediment Pond Design Standards and Achieving Discharge/Receiving Water Quality for Total Suspended Solids at Mine Sites

    Keeping the sediment on the mine site and out of the water course is essential from the regulatory, environmental and sustainability perspectives. Regulation of this aspect of mining is embedded in en

    Aug 1, 2013

  • CIM
    Strengthening a Mine with the Power of their Employees: A case study with Teck- Highland Valley Copper (HVC) and Westwind Performance

    Strengthening a mine with the Power of their Employees: ?Imagine if the global economy collapses, your head office calls, and tells you to shut down for 3 months... now what do you do? ? HVC Busin

    Nov 1, 2011

  • CIM
    Mineral-potential Assessment by Consistency-driven Pairwise Comparisons

    By Waldemar W. Koczkodaj, William O. MacKasey

    Abstract - A consistency-driven pairwise comparisons method for mineral potential assessment is presented, using a simplified case of volcanic-associated massive sulfide type deposits as an example. G

    Jan 1, 1997

  • CIM
    Mineral-potential Assessment by Consistency-driven Pairwise Comparisons (2bc87143-d633-40e3-8191-14dd0bf10841)

    By Waldemar W. Koczkodaj, William O. MacKasey

    A consistency-driven pairwise comparisons method for mineral potential assessment is presented, using a simpli?ed case of volcanic-associated massive sul?de type deposits as an example. Geological, ge

    Jan 1, 1997

  • CIM
    Operation of Centrifugal Pumps

    By Mark W. Booth

    THE Dominion Steel and Coal Corporation, as a coal mining concern and as a steel industry, has much pumping to do, and the conditions are as varied as it is possible to make them. We are faced with ha

    Jan 1, 1944

  • CIM
    Tailings Disposal, Generation of Acidity from Pyrrhotite and Limestone Neutralization of Wastewater at Falconbridge's Onaping Mines

    By L. S. Rivett, U. M. Oko

    The Strathcona mine, with a large new underground operation and concentrator, was recently brought into\ production by Falconbridge Nickel Mines Ltd. The tailings disposal and water utilization proble

    Jan 1, 1971

  • CIM
    Mining Pitching Seams under Dangerous Roof Conditions

    By J. B. De Hart

    This paper has been confined to the consideration of the working of thick seams, from six feet to sixteen feet, which are pitching at about thirty degrees to the horizontal. The discussion has been li

    Jan 1, 1930

  • CIM
    Dynamic Management of Road Construction Operations on Site

    By R. Heikkilä

    Today road construction sites utilize more and more information modeling in design phases as well as model based 3-D machine control systems in site operations. For main contractor, the management and

    Aug 1, 2013

  • CIM
    The Hematite Process - New Concepts for Increased Throughput and Clean Hematite Production

    By T. C. Cheng, G. P. Demopoulos

    It is the object of this paper to discuss various options for improving the hematite process in terms of increased throughput hence lower capital cost and production of saleable quality hematite. With

    Jan 1, 2004

  • CIM
    Kupol Mill Leach Operation In 2008-09

    By G. Kolosay, J. Rajala, G. Deschênes, A. Romanov

    ABSTRACT: The Kupol project, located in Far East Russia, treats a high-grade, free-milling ore containing 25.5 g/t Au, 298.3 g/t Ag, and 0.5% pyrite,with a P70of 53 microns. Most of the gold occurs as

    Jan 1, 2011

  • CIM
    Using Operational Readiness and Plant Trials to Successfully Implement a Process Flowsheet Change

    By C. H. Buck, A. J. Taylor

    "In 2015 Vale’s Clarabelle Mill began the process change to enable a higher degree of Cu separation. The flowsheet modification was part of a complete divisional flowsheet change being implemented in

    Jan 1, 2018

  • CIM
    Reduction of Arsenic Releasing In Aqueous Environment by Scorodite Encapsulation

    By S. D. F. Rocha1, L. Katsarou, G. P. Demopoulos

    "Crystalline scorodite (FeAsO4·2H2O) has been pointed out as the most stable compound to immobilize arsenic for disposal due to its good stability performance according to EPA’s TCLP test. However, in

    Jan 1, 2012

  • CIM
    Machine mining of narrow, hardrock orebodies

    By J. Peck, F. Brackebusch, M. Scobie

    "A number of alternative strategies exist to improve narrow orebody stope productivity and safety through mechanization. Particular attention is given to one of these: the development of an in-stope m

    Jan 1, 1990

  • CIM
    Programme Des Études De Suivi Des Effets Sur L?environnement ? Mines De Métaux

    En quoi consistent les études de suivi des effets sur l?environnement (ESEE)? Les ESEE constituent une méthode de suivi scientifique que l?on peut employer pour déterminer la santé des écosystèmes aq

    Nov 1, 2002

  • CIM
    Effect of Particulate Characteristics on the Balling Behavior and Properties of Fly Ash Pellets

    By V. P. Mehrotra, D. W. Fuerstenau, A. -Z. M. Abouzeid

    The use of pulverized coal for electric power generation results in the production of vast amounts of fly ash. One potential use for waste fly ash is the production of pellets for lightweight aggregat

    Jan 1, 2004

  • CIM
    Management of Environmental Emissions at Boliden Harjavalta Oy’s Smelter

    By H. -L. Heikkilä, E. Peuraniemi

    "Boliden Harjavalta Oy has a long tradition in the Finnish metal industry starting from the 1930's. The Smelter consists of copper and nickel flash smelting lines. Off-gases are captured in the acid p

    Jan 1, 2012

  • CIM
    Assessment of the Remaining Life for Turbine Components Made Of Advanced Materials through Analyses and Testing

    By W. Beres

    Many non-commercial operators are currently faced with the need to operate fleets of legacy gas turbine engines. How long such engines can be kept in service safely, without replacing a significant po

    Jan 1, 2015

  • CIM
    Fibrous Dust -Its Measurement and Control

    By Gyan S. Rajhans

    "The strategy of fibrous dust sampling is discussed, various sampiing methods are critically reviewed .and their application to coal dust is demonstrated. Fibre counting is described in detail. An att

    Jan 1, 1970

  • CIM
    Study on the Performance of Refractory Materials Affected by Light Rare Earth Oxides

    By J-g. Cui, X-b. Guo, J-j. Wang, J. Qiao, H. Tian

    "Rare earth elements have unique properties because of the special electronic structure. In this paper the improvement of refractory material performance by the light rare earth oxides was introduced.

    Jan 1, 2012

  • CIM
    The Flash Recycle System for the Cooling of Autoclaves Process Design and Operation

    By F. Crundwell, N. Steenekamp

    "The leaching of sulphide minerals generates a significant amount of energy. There are three systems that might be used to remove this energy. These are: cooling coils, quench water, and flash recycle

    Jan 1, 2012