Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Ultra Fine Milling - Biooxidation Processing of Refractory Gold Concentrates

    By R. W. Lawrence, J. B. Austin, P. B. Marchant, J. T. Chapman

    "Biohydrometallurgy is the use of microbiological reactions to assist in the extraction of metals. Bioleaching offers an innovative alternative for the treatment of refractory gold-bearing sulphides (

    Jan 1, 1990

  • CIM
    Environmental Relevance of the Leachate Potential for Dry Storage of Delayed Coke

    By Joseph L. Fournier

    Suncor Oil Sands employs delayed coking technology in converting bitumen into synthetic crude oil. Currently up to 10,000 m3 of delayed coke (coke) is produced per day as a byproduct of the upgrading

    May 1, 2011

  • CIM
    Health and Safety in Mineral Exploration: The PDAC Role

    By Bill Mercer

    The Triggers for PDAC Involvement in H&S ??Increase in serious accidents in mineral exploration in past few years ??Increasing junior role in exploration ?? Impression that there were few H&S prot

    May 1, 2008

  • CIM
    Managing Tailings Facilities for Continual Improvement

    By Elizabeth Gardiner

    Tailings and water management facilities are integral components of mine and mill operations. They must be managed for the long term to ensure that safe and environmentally responsible stewardship is

    May 1, 2003

  • CIM
    CO Oxidation Activity and Temperature-Programmed Reduction Study of Au/CuZnOx Catalysts

    By Stephen J. Roberts

    Gold catalysts were prepared on co-precipitated, calcined copper oxide - zinc oxide support by an inverse deposition-precipitation method. These catalysts were characterised by X-ray diffraction (XRD)

    Oct 1, 2003

  • CIM
    In situ acid leaching of copper tailings deposits: A case history

    By C. D. Shackelford, J. F. Muñoz, M. Vauclin, P. Rengifo, A. Suazo

    The results of a field-scale study involving in situ leaching of copper ore tailings using sulphuric acid as the leaching agent, injection wells to introduce the leaching solution and extraction wells

    Jan 1, 2001

  • CIM
    Setting the Record Straight (1e43186a-ec2a-4801-b2d8-fe8de2f5f8ed)

    By Don Thompson

    Canada’s oil sands are a controversial topic and virtually every newsmaker and layperson seems to have an opinion about this 179 billion barrel resource. The oil sands represent 97 per cent of Canada’

    Jan 1, 2010

  • CIM
    CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra Leone

    By Peter Dunn

    London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for

    May 1, 2011

  • CIM
    The Use of a Novel Chemistry Significantly Enhances the Strip Rate of both Gold and Silver from Carbon in Strip Circuits

    By E. J. Fuller, J. C. Monette

    "Gold and silver cyanide complexes are presently desorbed from activated carbon by means of hot caustic elutions. These solutions may or may not contain additional sodium cyanide. There are several pa

    Jan 1, 1992

  • CIM
    Concepts for Co-Mixing Waste Rock and Tailings

    Conventional waste management practices produce two waste streams for the construction of separate disposal facilities. The design of tailings impoundments is usually controlled by physical stability.

    Nov 1, 2002

  • CIM
    Transforming Flow Sheet Design with Inert Grinding – the IsaMill

    By K. E. Barnes

    "The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin

    Jan 1, 2006

  • CIM
    Residual Effects of Lognormality in Concentrator Data

    By Norman O. Lotter, André R. Laplante

    "The pursuit of concentrator surveying for purposes of metal accounting or process optimization has not yet connected with the well-published realm of geostatistics. The reality of lognormality in tim

    Jan 1, 2005

  • CIM
    Graphical-Analytical Model of the Generation of Methods and Variants of Methods of Digging, respectively of the Technologies and Technological Variants of the Execution of the Underground Mining Work

    By Nicolae Dobritoiu

    The literature in this field and the practical activity record that a method, respectively the technology used for an underground mining work have many components which, in order to be applied, demand

    Oct 1, 2009

  • CIM
    Mineralogical Tracing of Metallurgical Results - The Sarcheshmeh Copper Mine Case

    By S. Banisi, H. R. Iran-Manesh, M. R. Shayestefar, H. Shekarchyan

    "Flotation circuit of the Sarcheshmeh copper mine processes 41,000 t/d of ore at 0.9% Cu. Chalcopyrite and chalcocite are the main copper bearing minerals which are concentrated in three stages of rou

    Jan 1, 2003

  • CIM
    Process Development at the Raglan Concentrator

    By Joe Holmes, Peter Langlois

    "Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high

    Jan 1, 2001

  • CIM
    Improvement of Elements of Safety Culture in KGHM Glogów Copper Smelter

    By Gabka T., R. E. Gregorczyk

    Work to improve employees' behavior in Głogów Copper Smelter began in 2009. It has been noted that over 90% of accidents at work are attributable to human reasons. At that time, a series of external w

    Jan 1, 2019

  • CIM
    Numerical Modeling of Standard Rock Mechanics Laboratory Tests using a Finite/Discrete Element Approach

    By S. Stefanizzi

    In the present paper, numerical simulations based on a finite/discrete element approach are used to study deformation and failure process during standard rock mechanics. FEM/DEM modeling has been used

    May 1, 2009

  • CIM
    The Paracatu Expansion Project III ? Building the Largest Gold Concentrator of the World

    By Luis A. Tondo

    The Paracatu Expansion Project III in Brazil was implemented between 2006 and 2008 to increase the existing capacity from 20 to 61 Million tons per year of gold ore treatment. This expansion led the B

    May 1, 2009

  • CIM
    Investigation of Liner Wear at Chadormalu Semi-autogenous Grinding Mills

    By Mohammad Noaparast, Babak Fotoohi

    "Due to certain advantages in (semi-)Autogenous-Ball mill circuits in most of the high-throughput ore grinding units of mineral processing plants, much attention is paid to optimize the mill performan

    Jan 1, 2005

  • CIM
    Progress in Dust Control at Ontario Mines

    By Clifford S. Gibson

    A year ago a paper (1) was presented at the Annual Western Meeting of the Institute regarding silicosis in Ontario mines. It described the whole problem as we see it and discussed the means of prevent

    Jan 1, 1939