Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Design of Coal Preparation Plants for Australian Coal

    By Pell D

    Mechanical cleaning of coal was porforined in a few small plants in New South Wales from 1577 brit the first large coal washeries were built by Broken Hill Wbprietary Company Limited and Australian

    Jan 1, 1969

  • AUSIMM
    The Evaluation of a Non-Blinding Screen for Screening Iron Ore Fines

    Hamersley Iron Pty. Limited has maintained an interest in the screening of iron ore fines (nominally -6 mm). However, no dry screening process had successfully demonstrated acceptable separating eff

    Jan 1, 1991

  • AUSIMM
    Prediction of Groundwater Flow in Fissured Limestone, Blendevale Prospect, Western Australia

    Current problems in predicting sub-surface strata movement and fracture development due to longwall mining have highlighted the need for more accurate, dependable methods of physical modelling of r

    Jan 1, 1988

  • AUSIMM
    The Problem of Exploration on Existing Mining Tenements

    By G R Ryan

    Recent events have raised the issue of whether, and if so when and how, an explorer may gather data from a mining tenement or permit which is held under the relevant mining Act by another party. Two

    Jan 1, 1994

  • AUSIMM
    The Effective Use of Consultants

    By Tooth MA

    Mining, metallurgical and engineering consultants have made a considerable contribution to mining industry development in Australia. Expertise has been developed locally to a high level during th

    Jan 1, 1975

  • AUSIMM
    The Selection, Training and Development of Mine Managers - A Case Study

    By Walton DR

    It is self-evident that the availability of well qualified and experienced people to manage mining operations is vital to the success of an individual mine and to the ability to develop new mines e

    Jan 1, 1980

  • AUSIMM
    The Warner Zinc Process

    The Warner Process has been devised to produce zinc metal directly from sulphide, thereby reducing the requirements for purchase of large amounts of energy in a special form. The process conditions

    Jan 1, 1993

  • AUSIMM
    Alternative Systems for Low Temperature Aftercooling

    The ongoing need for improved fuel economy, longer engine life, reduced emissions and greater power output has driven the need for lower charge air temperatures. Cuamins will introduce a split loo

    Jan 1, 1986

  • AUSIMM
    Iron-Reducing Bacteria ù Ecology, Significance and Potential Uses

    By C D. Ogg, P B. Pope, K M. Lynch, B K. C

    Iron-reducing bacteria are able to couple the oxidation of an electron donor to the reduction of Fe(III) to Fe(II) under anaerobic conditions in the generation of cellular energy. Recent evidence sugg

    Jan 1, 2004

  • AUSIMM
    Slag-Metal Equilibria in Tin Smelting (cc76d623-4b94-4ee8-ae8c-fba648874660)

    In presenting the paper, Mr. Davey quoted subsequent work which yielded k, at miscibility gap composition, of about 50.We can confirm the authors' findings for k j 300 for nearly pure tin to k 2

    Jan 1, 1967

  • AUSIMM
    A Model Study of Copper Rougher Recovery Optimisation at PT Freeport Indonesia

    By M A. Mular, T Akroyd

    A fundamental model, which considers the subprocesses of particle collection by bubbles in flotation, is applied to two comprehensive flotation surveys in the rougher stages of C3 concentrator, PT Fre

    Jan 1, 2007

  • AUSIMM
    The Combined Use of Continuously and Discontinuously Operating Opencast Mine Equipment

    For decades strip mining with discon tinuously operating 'draglines and shovels has been the most economical operation method in the shallow hard coal opencast mines of Aust- ralia, North-Ameri

    Jan 1, 1981

  • AUSIMM
    Management of Iron Ore Quality Through Effective Technology Implementation Using Software Systems Designed From an IDEF0 Analysis

    By G De Tomi, R Sousa, A Lapworth

    One of the current challenges for iron ore producers is the ability to respond to changes in ROM stockpile specifications in a quick and cost-efficient manner. The decision-making process to respond t

    Jan 1, 2005

  • AUSIMM
    Pisces-a Symbol for the Future

    By King MN, Travis IC

    PISCES - the Planning and Information System for Coal Export Services has been developed by Port Waratah Coal Services (PWCS) to ensure the efficient and economic operation of the Hunter Valley Co

    Jan 1, 1987

  • AUSIMM
    Lode Structures and Ore Shoots at Vatukoula, Fiji

    Vatukoula is a gold mining township situated at the south-west periphery of a Tertiary caldera which measures 3 miles by 4 miles. Erosion of the caldera resulted in the formation of a topographic depr

    Jan 1, 1967

  • AUSIMM
    The Elimination of Nickel from Zinc Plant Solutions Using Dimethylglyoxime

    By Kershaw M. G, Maughan R. C A

    A process for eliminating nickel from electrolytic zinc plant solutions by precipita- tion with dimethylglyoxime (DMG) was developed to enable the Electrolytic Zinc Company of Australasia Limited (

    Jan 1, 1977

  • AUSIMM
    Resource Modelling in an Evolving Mine - CSA Mine, Cobar, New South Wales

    By E Haren, A Winchester

    The CSA Mine has a long and varied history from initial discovery in 1871 through to the present. Lead-zinc mineralisation was mined historically near the surface. Today copper and silver are extracte

    Jan 1, 2006

  • AUSIMM
    Management of the Outburst Risk in the Southern Coalfield, New South Wales

    Coal mining in the Bulli seam in the Southern Coalfield in New South Wales has experienced the dangers of outbursts of coal and gas. These incidents present a major risk to the safety of mine workers

    Jan 1, 2003

  • AUSIMM
    Sublevel Cave Stoping at Mount Windarra

    By Lockyer PC, Reed MR Bartlett PM

    Difficult ground conditions have plagued the underground operations at Mount Windarra since mining started in 1974.The ore at Mount Windarra consists of seven vertically dipping, sub vertically plungi

    Jan 1, 1985

  • AUSIMM
    Two Stage Iron Purification of Zinc Plant Solutions (bbf6e4b6-3e13-4866-8453-33e6cff94330)

    By Kershaw M. G

    At the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, impurities toxic to the electrolytic production of zinc metal, notably arsenic and antimony, have traditionally been coprec

    Jan 1, 1990